Loading...
HomeMy WebLinkAbout1159 Gold Dr - Disclosures/Blower Door Test - 08/03/2017 (2)BUILDING LEAKAGE TEST Date of Test: 8/3/2017 Test File: Multi Point Tectite Building 48 Unit 6 Technician: Trevor Donnelly- EnergyLogic Project Number: 46179 Customer: Captstone Collegiate Communities Building Address: 1159 Gold Drive Unit 6 Fort Collins , CO 80525 Test Results 1. Airflow at 50 Pascals: 1254 CFM50 ( +/- 0.4 %) (50 Pa = 0.2 w.c.) 4.58 ACH50 2. Leakage Area: 69.0 in2 LBL ELA @ 4 Pa 3. Building Leakage Curve: Flow Coefficient (C) = 93.9 ( +/- 7.1 %) Exponent (n) = 0.663 ( +/- 0.019 ) Correlation Coefficient = 0.99961 4. Test Settings: Test Standard: RESNET Multi-Point Test Test Mode: Depressurization 5. Accuracy Level Standard Level of Accuracy Test Infiltration Estimates 1. Estimated Average Annual Infiltration Rate: 2. Estimated Design Infiltration Rate: Cost Estimates 1. Estimated Cost of Air Leakage for Heating: 2. Estimated Cost of Air Leakage for Cooling: BUILDING LEAKAGE TEST Page 2 of 4 Date of Test: 8/3/2017 Test File: Multi Point Tectite Building 48 Unit 6 Building Information Volume 16443 Surface Area Floor Area Height # of Bedrooms # of Occupants Year of Construction 2017 Wind Shield M Location Climate Information Ventilation Weather Factor 0.87 Energy Climate Factor 17.00 Heating Degree Days 6128 Cooling Degree Days 297 Design Winter Wind Speed 7.3 mph Design Summer Wind Speed 9.4 mph Design Winter Temp Diff 73 deg F Design Summer Temp Diff 15 deg F Heating and Cooling Cost and Efficiency Information Heating Fuel Gas Heating Fuel Cost Heating Efficiency % Cooling Fuel Cost Cooling SEER Equipment Information Type Manufacturer Model Serial Number Custom Calibration Date Fan Energy Conservatory Model 3 (110V) Default Micromanometer Energy Conservatory DG700 7170-5 10/9/2008 BUILDING LEAKAGE TEST Page 3 of 4 Date of Test: 8/3/2017 Test File: Multi Point Tectite Building 48 Unit 6 Depressurization Test: Environmental Data Indoor Temperature (°F) Outdoor Temperature (°F) Altitude (ft) 75.0 57.0 5000.0 Data Points Nominal Building Pressure (Pa) Baseline Adjusted Building Pressure (Pa) Fan Pressure (Pa) Nominal Flow (cfm) Adjusted Flow (cfm) % Error Fan Configuration -2.1 n/a n/a -59.4 -57.3 57.6 1371 1376 0.2 Ring A -56.9 -54.7 54.0 1329 1334 0.1 Ring A -53.1 -51.0 48.3 1258 1263 -0.6 Ring A -51.0 -48.9 46.2 1232 1236 -0.0 Ring A -46.0 -43.9 39.7 1145 1149 -0.1 Ring A -42.2 -40.1 35.7 1087 1091 0.7 Ring A -38.9 -36.8 31.3 1019 1022 -0.2 Ring A -33.8 -31.7 243.0 923 926 -0.1 Ring B -2.2 n/a n/a Time Averaging Period: 10 Deviations from Standard RESNET Multi-Point Test - Test Parameters None BUILDING LEAKAGE TEST Page 4 of 4 Date of Test: 8/3/2017 Test File: Multi Point Tectite Building 48 Unit 6 Comments Connection to: Garage: Mechanicals: -50 Pa