HomeMy WebLinkAbout1159 Gold Dr - Disclosures/Blower Door Test - 08/03/2017 (2)BUILDING LEAKAGE TEST
Date of Test: 8/3/2017 Test File: Multi Point Tectite Building 48 Unit 6
Technician: Trevor Donnelly- EnergyLogic
Project Number: 46179
Customer: Captstone Collegiate Communities
Building Address: 1159 Gold Drive
Unit 6
Fort Collins , CO 80525
Test Results
1. Airflow at 50 Pascals: 1254 CFM50 ( +/- 0.4 %)
(50 Pa = 0.2 w.c.) 4.58 ACH50
2. Leakage Area: 69.0 in2 LBL ELA @ 4 Pa
3. Building Leakage Curve: Flow Coefficient (C) = 93.9 ( +/- 7.1 %)
Exponent (n) = 0.663 ( +/- 0.019 )
Correlation Coefficient = 0.99961
4. Test Settings: Test Standard: RESNET Multi-Point Test
Test Mode: Depressurization
5. Accuracy Level Standard Level of Accuracy Test
Infiltration Estimates
1. Estimated Average Annual Infiltration Rate:
2. Estimated Design Infiltration Rate:
Cost Estimates
1. Estimated Cost of Air Leakage for Heating:
2. Estimated Cost of Air Leakage for Cooling:
BUILDING LEAKAGE TEST Page 2 of 4
Date of Test: 8/3/2017 Test File: Multi Point Tectite Building 48 Unit 6
Building Information
Volume 16443
Surface Area
Floor Area
Height
# of Bedrooms
# of Occupants
Year of Construction 2017
Wind Shield M
Location Climate Information
Ventilation Weather Factor 0.87
Energy Climate Factor 17.00
Heating Degree Days 6128
Cooling Degree Days 297
Design Winter Wind Speed 7.3 mph
Design Summer Wind Speed 9.4 mph
Design Winter Temp Diff 73 deg F
Design Summer Temp Diff 15 deg F
Heating and Cooling Cost and Efficiency Information
Heating Fuel Gas
Heating Fuel Cost
Heating Efficiency %
Cooling Fuel Cost
Cooling SEER
Equipment Information
Type Manufacturer Model Serial Number Custom Calibration Date
Fan Energy Conservatory Model 3 (110V) Default
Micromanometer Energy Conservatory DG700 7170-5 10/9/2008
BUILDING LEAKAGE TEST Page 3 of 4
Date of Test: 8/3/2017 Test File: Multi Point Tectite Building 48 Unit 6
Depressurization Test:
Environmental Data
Indoor Temperature (°F) Outdoor Temperature (°F) Altitude (ft)
75.0 57.0 5000.0
Data Points
Nominal
Building Pressure
(Pa)
Baseline Adjusted
Building Pressure
(Pa)
Fan
Pressure
(Pa)
Nominal
Flow
(cfm)
Adjusted
Flow
(cfm) % Error
Fan
Configuration
-2.1 n/a n/a
-59.4 -57.3 57.6 1371 1376 0.2 Ring A
-56.9 -54.7 54.0 1329 1334 0.1 Ring A
-53.1 -51.0 48.3 1258 1263 -0.6 Ring A
-51.0 -48.9 46.2 1232 1236 -0.0 Ring A
-46.0 -43.9 39.7 1145 1149 -0.1 Ring A
-42.2 -40.1 35.7 1087 1091 0.7 Ring A
-38.9 -36.8 31.3 1019 1022 -0.2 Ring A
-33.8 -31.7 243.0 923 926 -0.1 Ring B
-2.2 n/a n/a
Time Averaging Period: 10
Deviations from Standard RESNET Multi-Point Test - Test Parameters
None
BUILDING LEAKAGE TEST Page 4 of 4
Date of Test: 8/3/2017 Test File: Multi Point Tectite Building 48 Unit 6
Comments
Connection to:
Garage:
Mechanicals: -50 Pa