Loading...
HomeMy WebLinkAbout228 Fishback Ave - Applications/Furnace - 09/12/2018,Fcity -of Planning, Development, & Transportation Services ort Collins Community Development & Neighborhood Services 281 North College Avenue Fort Collins, CO 80524 Main: 970.416.2740 Fax: 970.224.6134 OVER-THE-COUNTER PERMITS ONLY This application is to be used to apply for the following permits only (check all that apply). ❑ Air Conditioning ❑ Demolition (interior non-structural) ❑ Electrical Alteration (not service change) ❑ Gas Lighter ❑ Gas Log ® Heating Unit ❑ Lawn Sprinkler ❑ Mobile Home replacement ❑ Roofing ❑ Sewer Line ❑ Photo -voltaic ❑ Ventilation ❑ Water Heater ❑ Water Line ❑ Wood/Pellet Stove (must be EPA certified, provide make, model and manufacturer). Complete all applicable information on the application. Incomplete applications will not be accepted. Application # � � IM 1 "1 �) 1 Date For office use only Job Site Address (required) Value of Con ruction (labor, materials, profit) Property Owner Name Address City/State Zip Phone Applicant Name A ress City/State Zip Phone Fort Collins Heating & Air 208 Commerce Dr. #4 Fort Collins, CO 80524 970.484.4552 Contractor Address City/State Zip Phone Fort Collins Heating & Air 208 Commerce Dr. #4 Fort Collins, CO 80524 970.484.4552 Contractor City of Ft. Collins Sales Tax # Are you paying taxes here or by report? ❑ Here ! Report Sales tax number is required by all contractors. Are you paying with your trust account? ■ Yes ❑ No Is this a residential or commercial project? ® Residential ❑ Commercial If residential, is it: ® Single Family Detached ❑ Condo/townhome (single family attached) ❑ Duplex ❑ Multifamily (apartment) ❑ Garage If commercial, is it: ❑ Bank ❑ Bar ❑ Church ❑ Hotel/Motel ❑ Medical office ❑ Office ❑ Retail ❑ Restaurant ❑ Other (explain) Is this building 50 years of age or more? ❑ Yes ®No If yes, you may need to contact Historic Preservation If this is for a demolition permit, what year was the building constructed? Description of work l *If lawn sprinkler/backflow preventer, must list licensed plumber. If first-time A/C, must list licensed electrician. Subcontractors: List the company name or City of Ft Collins license # Electrician Plumber Mechanical H1309 Roofer Other I hereby acknowledge that I have read this application and state that the above information is complete and correct. I agree to comply with all requirements contained herein and city ordinances and state laws regulating building construction. I know that a permit is not valid until it has been paid and issued. Applicant: Print Name: `11, Signature ' f� Date 1,tLLl�lyls2l� I Revision date 2/o2017