Re: Final Summary Letter
Red Truck Beer Company — Building Addition/Structural Related Items
Fort Collins, Colorado
EEC Project No. 1174162
Mr. James:
As requested, this letter is provided to briefly summarize the services you requested of Earth
Engineering Consultants, LLC (EEC) during the period December 24, 2017 through June 16,
2018 relative to the Red Truck Beer Company project building addition/structural related items.
This summary letter does not include site improvements associated with flatwork, sidewalks,
curb -and -gutter and other elements not associated with the building addition/structural related
items. Detailed summaries of the observation and testing services provided by EEC during the
referenced period were submitted to your attention in periodic summary reports (EEC project
number 1 ] 74162); those reports should be referenced for completeness and can be provided to
you if requested. This summary report is not intended to supersede the contents of those periodic
summary reports.
The services provided by EEC during the referenced period generally included the following:
• foundation over excavation observations and/or foundation bearing observations
• compaction testing —footing over excavation backfill, and foundation wall backfill
• observations of slab -on -grade preparation
• cast -in -place concrete reinforcing steel observations —foundation footings, stem walls,
piers, grade beams, and slab -on -grade
• foundation damp -proofing and insulation observations
4396 GREENFIELD DRIVE
WINDSOR, COLORADO 80550
(9 70) 545 -390 8 FAX (970)663-0282
Earth Engineering Consultants. LLC.
EEC Project No. 1174162
July l 1, 2018
Page 2
• cast -in -place concrete testing — foundation footings, stem walls, piers, grade beams, and
slab -on -grade
• structural steel —shop inspection, structural connections
Our review of foundation over excavation and/or foundation bearing observations indicates the
building addition/structural related subgrades were prepared generally consistent with the project
subsurface explorationrreport. Review of the compaction test results indicates, in general, the
field density test results rnet the project compaction criteria. Review of observations for slab -on -
grade preparation indicates, in general, the slab -on -grade was prepared in general accordance
with project plans. Review of reinforcing steel observed indicates the reinforcing steel observed
was placed in general accordance with the identified project plans and Ms. Review of
foundation damp -proofing and insulation observation indicates they were prepared/installed in
general accordance with the project plans/specifications. Structural steel observations appeared
to meet the project details/specifications and Ms. The concrete compression test results met the
required 28-day compressive strength criteria.
We appreciate the opportunity to be of service to you on this project. If you have any questions
regarding this report, or if we can be of further service to you in any other way, please do not
hesitate to contact us.
Very truly yours,
Earth Engineering Consultants, LLC
O p,D 0 1 &4
91175
SOT , '/11����j�: 40
/ ��'
's ONALEN
Jacob J. Silverman, P.E.
Project Engineer
Reviewed
L
�0IAL�
Ethan P. Wiechert, P.E.
Senior Project Engineer
EEC Project No. 1 ] 74162
July 11, 2018
Page 3
cc: Larsen Structural Design
RB+B Architects
Saunders Heath
Saunders Heath
Saunders Heath
Saunders Heath
Earth Engineering Consultants, LLC
Eric Richards (ericnlarsensd.com)
Ben Basalay (bbasalav a rbbarchitects.com)
Devon Ausborn-Besich (D.Ausborne-Beisch a saundersheath.com)
Devin Van Maanen (D.vanmaanen @ saundersheath.com)
Emily Peddicord(E.peddicordl<saundersheath.com)
Tayler Rensink (t.rensinknsaundersinc.com)