Loading...
HomeMy WebLinkAbout122 3rd St - Correspondence/Plans Approval - 05/14/2018City of F~ ty Community Development & Neighborhood Services 281 N. College Ave. Fort Collins, CO 80522; Voice: 970-221-6760 FAX: 970-224-6134 CONSTRUCTION WASTE MANAGEMENT PLAN and DOCUMENTATION Note: City staff is able to assist if you have questions about implementing a construction site recycling program, please call Jonathon Nagel at (970) 416-2701 orjnagel@fcgov.com PROJECT INFORMATION Address(es) zZ 34 54--y-f-tJ- Permit #(s) General Contractor & Contact Info:�oN Instructions: Submit the construction waste management plan at the beginning and end of each project. At first submittal, do not include the total volume/weights, hauler signatures or documentation. At project completion resubmit this plan, with ALL fields completed, along with the required documentation. If one or more materials were not generated during the project, indicate as such. Documentation: Provide documentation from the hauling company listing the project address and services provided. you hauled the materials yourself, attach tickets from all facilities recycling the materials. Vendor hauling the Facility recycling the Total volume or weight Material material material of material Indicate if self -hauled Indicate units Concrete/Masonry �. (Required) Wood/Lumber (Required) Metals f" I (Required) Cardboard (Required) Trash N/A Contaminated loads (Intended recyclables, sent N/A to landfill. Indicate material) I understand that my failure to follow this plan or resubmit this Plan could include Penalties of over $2.500 Per day of the violation and up to six monthsAn 'ail. I certify that the above materials from my construction site were recycled in the volume / wei describ a ere taken to the facilities described. Print Name & Signature - Contras or or Owner Dat Print Name & Signature - Hauler(s) Date (If multiple, indicate vendor and include signature from each)