HomeMy WebLinkAbout1209 N College Ave - Special Inspections/Engineering - 03/01/2017HoffConstruotion Project: Lyric Cinema FC 1209 N. College Ave BP# B1606966 GC: Hoff Const, Special Inspections: Foundation 1815 West 12th Street I P.O. Box 7448 1 Loveland, CO 80537 1 Tel. 970.669.3255 1 Fax. 970.663.1566 L www.hoffconstruction.com kill - J -N..t O R► -0- R A T■ D- March 1, 2017 - Hoff Construction 1815 West 12 Street Loveland, Colorado 80537 Attention Joel Reger Subject Comprehensive Open Hole (COH) Proposed Lyric Cinema 1209 North College Avenue Fort Collins, Colorado CTLIT Project Number FC06790-125 CTLIThompson, Inc previously provided a Geotechnical Investigation (Project No FC06790-125, report dated January 26, 2015) We performed a comprehensive open hole (COH) on March 1, 2017 to determine the foundation and floor subgrade conditions Four test pits were excavated adjacent to the building footprint Materials encountered to each test pit consisted of 2'/7 feet of import sand fill over native sandy clay No organic or loose material was observed in the pits between the two materials CTL conducted compaction testing on the sand fill during placement Based on observations of the test pits and our testing, we believe the subsurface conditions encountered are as anticipated for the foundation and floor subgrade We appreciate the opportunity to work with you, on this project If you have any questions regarding the information provided in this letter; please do not hesitate to contact us Sincerely, r 400 North Link Lane Fort Collins, -Colorado 80524 Telephone 970-206-9455 1 fc(cDctithompson corn I www.ctit.com CTLITHOMPSON Reinforcing Steel Report %portoate:3/130017 Fort Collins 400 North Link Lane Fort Collins, CO80524 Phone 970-206-9455 Technician: England, Adam Date: 03/08/2017 Placement Type Observed: Footing Client: Hoff Construction 1815 W 12h Street Lowland, C080537 Project. FC06790001-360 Proposed Lyric Cinema 1209 N College Aye Ft Collins, CO Placement Location: At the Lyric Lounge, we inspected the steel in the footing for the building foundation. Items Checked- Bar Quantity and Spacing / Bar Size / Cover / Lap Length Plans: CTL Thompson, no FC06790.000, dated 11-7-16 Remarks: We also checked bar grade and position. Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at the time of concrete placement: Yes Reinlspection Required: No Mar 24 2017 1:33 PM Page 1 of 1 � CTLITHONIPSON Reinforcing Steel Report ReportDate• 3/21/2077 Fort Collins Client: Pro�ect - 400 North Lmk Lane FoR Collins,CO 80524 HoH Construcdon FC06790 001�60 Phone 97a20Cr9455 1815 W 12th Street Proposed Lync Cinema Loveland,CO 80537 1209 N College Ave Ft Colhns,CO Technician: England,Adam Date: 03/16/2017 Placement Type Observed: Column Placement Location: At the Lyric Cmema,we inspected the steel m the colums and foundatio�walls north wall,entry wall,north intenor wall,and tower columns. Items Checked: gar Size/Bar Quantity and Spaang/Lap Length/Cover Plans• CTL Thompson, no. FC)6790,000,dated 9-14-16, pps.S1.0,S1 1, S3 0 Remarks:Also checked bar grade and position. Reinforcement was placed in general conformance with approved drawings and standard construction practice.Contractor to ensure proper coverage is maintained at the time of concrete placement• Yes Reinspection Required: No `x Q�•REQ�s'T �p THQ�,F,9 . ��� : 4 • �' y ��I. ,� i •� bfJAi� ��� �� �e�7�;�� ��4 Page 1 of 1 � � CTLITHOMPSON Reinforcing Steel Report ReportDate:4/11/2017 Fort Collms .Chent: Pro�ect - 400 North Link Lane Fort Collins,CO 80524 Hoff ConstrucUon FC06790 001�60 Pnone 970.206-9455 1815 W 12th Stree[ Proposed Lync Cinema Loveland,CO 80537 1209 N College Ave Ft CoDins.CO Technician: Giffin, Lee Date: 03I31/2017 Placement Type Observed: Footing i Placement Location• At lhe Lyric Cinema,we inspected the rebar planned for inside walls. Items Checked: Bar Size/Bar QuanUty and Spaang/Lap Length/Cover/Form Void - Plans: CTL Thompson, no. FC06790,000,dated 11-7-16 Remarks: Also checked bar grade and position. Reinforcement was placed in general conformance with approved drewings and standard construction practice.Contractor to ensure proper coverage is mamtained at the time of concrete placement Yes Reinspection Required: No 4 Q� ��C�/S+ �,,..,.. _ � �•a,THo,�,�,� . �� . 3617 ; . . . : ., �. •. . � ''• .. .�•�{'' ti �lA� Apr 12 2017 6:53 AM Page 1 of 1 �CT�ITHOMPSON Reinforcing Steel Report ReportDate 6��20,� Fort Collins Client. Pro�ect• 400 North Link Lane Fort Collins,CO 80524 HoH Construdion FC06790.001�60 Phone 970-2069455 1815 W 12th Street Proposed Lyric Cmema Loveland,CO 80537 1209 N College Ave Ft Col6ns,CO Technician: Giffin,Lee Date: 05/30/2017 Placement Type Observed: Slab on Grade Placement Location: At the Lync Cinema,we mspected the reinforang steel in the floor at the southeast comer of the buildmg,4 x 4 mch wire. Items Checked: Bar Size!Bar Quantity and Spaang/Lap Length/Cover Plans: CTL Thompson, no. FC06790.000,dated 9-14-16 Remarks:Also checked bar grade and position. Reinforcement was placed in general conformance with approved drawings and standard construction prectice.Contractor to ensure proper coverage is maintamed at the time of concrete placement Yes Reinspect�on Required: No I O �ti/ .� o,,.....,,s�, ��y.rKo�,F . 3617' � ' . : . . . ; i �.� ., �� � ••.. ..� tO�NA� Jun 12 2017 8:30 AM IPage 1 of 1 � �CTLITHOMPSON Reinforcing Steel Report ReportDate. B/22/2017 Fort Collins Client: Pro�ect 400 North Link Lane Fort Collins,CO 80524 HoH Construcdon FC06790.001�60 Phone 970-20fa9455 1815 W 12th Street Proposed Lync Cmema Loveland,CO 80537 1209 N College Ave Ft Collms,CO Technfcian: England,Adam Date: 08I15/2017 PlacementType Observed Other Placement Location• At the Lync Cmema pro�ect,we inspected the steel in 6 light pole bases. Items Checked: Bar Size/Bar Quantity and Spaang/Lap Length/Cover , Plans: CTL Thompson, no.FC06790-500 L2,no date groen Remarks: We also checked bar grade and position. Reinforcement was placed in general conformance with approved drav�nngs and standard construction practice.Contractor to ensure proper coverage is maintained at the time of concrete placement. Yes Reinspection Required: No .� ,a•RE���'r �p.THp,�,�` . ��� . : . . '�.. ,. . ,. . , •�•.. ... �� � Page 1 of 1 ' �{ CTLITHOMPSON Reinforcing Steel Report ReportDate•8/22/2017 FoR Collins Client: Pro�ect • 400 North Link Lane Fort Colhns,CO 80524 Hoff Construction FC06790.001�60 Phone 970.2069455 1815 W 12th Street Proposed Lync Cinema Loveland,CO 80537 1209 N College Ave Ft Colluis,CO Technician: p�son,Todd Date: 08/17/2017 Placement Type Observed: Footing ' Placement Location• At the Lync pro�ect,we inspected the steel in the footmg base for the trash enclosure 2#4 bar only at bottom,at 90 degrees,#4 bar at 16 mches on center and wet stabbed at hme of pour,top 2#4 to be set at bme of pour. Items Checked: Bar Size I Bar Quantity and Spaang/Lap Length Plans: CTL Thompson Structural Engineenng, no.FC06790.000,dated 11-7-16 Remarks:Also checked bar grade and position. Reinforcement was placed in general conformance with approved drawmgs and standard construction practice.Contractor to ensure proper coverage is maintained at the time of concrete placement: Yes Reinspection Required: No ;; a�•R����r ' ��,,rH�,a,�,F,9 3�r : : . . . . .,� ; �'••.E. e•�', Sit7NA�- Aug 22 2017 5:40 PM Page 1 of 1 ' �-CTLITHOMPSON Reinforcing Steel Report ReportDate•8/31/2017 Fort Collins Client: Pro�ect• • 400 North Lmk lane Fort Collms,CO 80524 HoH Construdion FC06790 001�60 Phone 970-20fr9455 1815 W 12th Street Proposed Lync Cinema Loveland,CO 80537 1209 N College Ave Ft Colluis,CO Technician: England,Adam Date: 08/22/2017 Placement Type Observed: Slab on Grade Placement Location: At the Lyric Cinema pro�ect,we inspected the south trash enclosure slab on grade. Items Checketl: Bar Size/Bar Quantity and Spaang!Lap Length i Cover Plans: CTL Thompson, no. FC06790-500 L2,dated 11-7-16 Remarks: We also checked bar grade and position. Reinforcement was placed in generel conformance with approved drawings and standard construction practice.Contractor to ensure proper coverage is maintained at the time of concrete placement Yes Reinspection Required. No , � / oQ.. Q sr �4 rHo,�,F� �/ 3517? Y l,,.,..` ,: •�♦ �� �! �f1R1A4 Aug 312017 4:22 PM Page 1 of 1