Loading...
HomeMy WebLinkAbout4700 Lady Moon Dr - Miscellaneous/Engineering - 10/26/2017City of Fort Collins Commissioning Checklist City of F,.ort Collins Project address WOO Lc. J , JYn.ram Z Permit # 116 07 Z5 1 Ft Co11� CC) 90537 Commissioning Authority ,o Company Name ML? lbinM� Project Manager w� blM i6i— "Ir\ e- Submit proof of qualifications of Commissioning Authority (CxA) to Building Official. CxA must carry one of the following certifications: CxA by ACG (AABC Commissioning Group), CBCP by AEE (Assoc of Energy Engineers), CPMP by ASHRAE, CCP by BCA (Building Commissioning Assoc), CxAP/CAP/CxM/GcxP or GCP by Univ of Wisconsin Madison. Initials Date Item Review Owner's project requirements (OPR) �p Review Basis of Design (BOD) Include commissioning requirements in project specifications LJA 16hK Develop Commissioning Plan �l /0 6 Complete Pre -functional Checklist 16 Z ( Complete Function Performance Test p 4Complete a commissioning report b,4 ) iJ 26 Verify owner requirements for training personnel and building occupants is complete. 11 _j ly' 7 /6/�C Verify that a system manual that includes operations and maintenance documentation and full warranty information, and provides operating staff the information needed to understand and operate the commissioned systems as designed has been completed. Commissioning of the following systems has been completed: HVAC, Refrigeration, and associated controls 1 HVAC components and systems related to Indoor Air Quality per IBC 3603,1.1 as amended by City of Fort Collins have been inspected 11 % The air barrier assembly has been inspected for continuity and integrity at the follow locations in the building within 5% completion of each: 1) Roof -wall intersections 2) Fenestration flashing 3) Fenestration installation 4) Bottom of wall (wall -to -foundation connection) 5) Connection of dissimilar wall and roof assemblies 6) Isolation of interior rooms such as mechanical and paint rooms 7) Wall and roof penetrations %U 6 Lighting and shading controls !U c- Service water heating systems IV14 V1Renewable energy systems Test and document background sound levels per IBC Section 3603.3.1.3 I hereby attest the above mentioned address has been commissioned per 2012 International Building Code Se i 36 as amended by the City of Fort Collins. l0%Z G /Z Ci 7 Commissioning Authority nature Date Cc p #Soo ' Si 67-6 Certification Number or Stamp Date of Expiration