Loading...
HomeMy WebLinkAbout1017 Sabatino Ln - Correspondence/Engineering - 08/08/2017Ron L. Lindburg, P.E. 2706 Wyandotte R Collins, CO 80526 Ph (970) 282-6005 e-mail rllcse@gwestoffice net August 8, 2017 Mr Dana Lockwood Lockwood Architects 415 E Pitkin Street Fort Collins, CO 80524 Re Building 6 - Lots 23 and 24 Girder=Trusses.at Lot 23 & 24 1017 Sabatmo Ln .(Permit #B1404884) r 1011 Sabahno Ln (Permmt #B 1404847) Bella`Vir`a Town Homes Bella Vira Filing Two Fort Collins, Colorado Project No CR9010-18 Dear Mr Lockwood Per the contractor - the building department has requested a letter regarding the pre-engineered truss frammg at the two center Lot 23 and Lot 24 structures of the 4-plex building A written request from the building department was not received, per the contractor - the issue is the girder truss framing at a portion of the Lot 23 and Lot 24 structures Refer to the structural plans prepared for the project (Project No CR9010-18 drawing set S 1, S2, S3 1, S3 2, S4 dated July 9, 2014) Refer to the pre-engineered truss shop drawing set (work order #7-0210 and work order #7-0210 B) received from the contractor today August 8, 2017 At the front of the building at the portion of the roof framing adjacent to the garage above the living area - sheet S3 2 of the structural drawings indicates an additional girder truss between the girder truss that is in line with the rear of the garage (which is C08G at Lot 23 and B09G at Lot 24) and the front of the building The pre-engineered truss plans omit this additional girder truss and frames the roof in this area with (C08G and C 11 G girder truss at Lot 23 and B09G and B 19G girder truss at Lot 24) The pre-engmeered truss framing at this described area indicated in work order #7-0210 and work order #7-0210 B is acceptable /1 n Sincerely, dema 2 Ron L Lindburg, P E'`�` •'•..•p••..•' ��''//,,//L'/ONA'I���\\\\\��