HomeMy WebLinkAbout6121 Fall Harvest Way - Correspondence/Water and or Sewer - 08/11/2017A
FORT COLLINS- LOVELAND WATER DISFIUCT A; iOUTH FORT COLLINS SANITATION DISTRICT
-v^
Date: tl
!l �/ 1
TO: ottort Collins Building Inspections Department
FROM: Fort Collins -Loveland Water District
South Fort Collins Sanitation District
RE: Water and Sewer Approval
This is to verify that T011C01 INC
has applied for a Water and Sewer Tap for
Kechter Farm Filing l Phase 3 (Siebdnr.,ro)
6121 Fall Harvest Way (et itiling.4(rbrss)
L8 B % (Lot Number)
The following Taps pertain to the above mentioned address:
X Water X Sewer
❑X Water Tap Fee has been paid, a Building Permit may be issued.
Sewer Tap Fee has been paid, a Building Permit may be issued.
All Tap Fees must be paid prior to issuing a Stnicture Building Permit.
Name of Districts: Fort Collin, -Loveland Water District/ South Fort Col
F.LWD/SFCSD
Signed:
Please return to the City of Fort Gd1 inS Building Inspections Department for Building Permit.
Structure
Pressure Regulating Valve Required
5150 Sncad Drive, Fort Collins, CO 80525 Phone (970) 226-3104 Fax (970) 226-0186