Re: Excavation Observation for
Lot 12, Block 7, Timbervine 2"d Fil., 387 Pilsner Street, Fort Collins, CO
Crown Engineering, llc. Project No. 225-04-17-02
Gentlemen:
As requested, on March 1, 2017, we visually observed the excavation at the above referenced
location. The purpose of this observation was to verify that the subsurface conditions
encountered in the excavation are generally consistent with those outlined in the soils report
performed by CTL/Thompson, Inc., Project No. FC06508-115. This letter is not intended to be a
summary of the soils report and does not meet the disclosure requirements of Colorado Senate
Bill 13, 6-6.5-101.
At the time of our observation, the excavation had been completed. The excavation revealed
gravelly sand and sandy gravels to the depths excavated for crawl space foundation construction.
The subsurface conditions exposed in the excavation appeared to be generally consistent with
those described in the above referenced soils report, which recommends a continuous spread
footing and isolated pad type foundation system for these subsurface conditions. We also
recommend that an exterior perimeter drain be constructed for this structure.
Thank you for consulting with us on this phase of the project. If you have any questions, please
do not hesitate to contact me at (970) 691-4239.
Sincerely,
(grown E
m
Structural Engineer' s�ONa q
Main Office
524 Stover Street
Fort Collins, Colorado 80524
Phone: (970) 4%-9537
Cell: (970) 691-4239
Fax: (970) 221-1521 e-mail: revessf5C msn.com
-
Trown TEn#inPPrin#, 3nr.
gptrurturat Engineering & Jnspertiurtz
May 22, 2017
FR Development
Andrew Rausch
125 S. Howes St., tad Floor
Fort Collins, CO 80521
Re: Footing Observation at
Lot 12, Block 7, Timbervine 2rid Fil., 387 Pilsner Street, Fort Collins, CO
Crown Engineering,llc. Project No. 225-04-17-03
Gentlemen:
We have visually observed the footing sizes at the residence under construction at the above
referenced location. These observations were performed on March 1, 2017.
It is our opinion that the footing sizes, widths and steel reinforcement were in general
conformance with the foundation plan, drawn by Crown Engineering, Inc., Job No. 225-04-17-
01, dated February 9, 2017.
Thank you for consulting with us on this phase of your project. If you have any questions, please
do not hesitate to contact me at (970) 691-4239.
Sincerely,
Main Office
524 Stover Street
Fort Collins, Colorado 80524
Phone: (970) 498-9537
Cell: (970) 691-4239
Fax: (970) 221-1521 e-mail: revessf5Pinsn.com
Trawn TEnginPPrin#, 3nr.
-*trurtural Engineering & +Jnspertiuns
May 22, 2017
FR Development, Ltd.
125 S. Howes, 2"d floor
Fort Collins, CO 80521
Re: Foundation Wall Steel Reinforcement & Ufer Ground Rod Observation
at Lot 12, Block 7, Timbervine 2"d Fil., 387 Pilsner Street, Fort Collins, CO
Crown Engineering, Ile. Project No. 225-04-17-04
Gentlemen:
We have visually observed the wall steel reinforcing placed in the forms at the residence under
construction at the above referenced location. This observation was performed on March 6,
2017.
It is our opinion that the steel reinforcement that was placed in the forms is in general
conformance with the foundation plan, drawn by Crown Engineering, Inc., Job No. 225-04-17-
01, dated February 9, 2017. A ufer ground rod was also observed to be installed within the
foundation wall reinforcing steel. The ground rod was placed per generally acceptable
placement recommendations.
Thank you for consulting with us on this phase of your project. If you have any questions, please
do not hesitate to contact me at (970) 691-4239.
Structural Engineer
Main Office
524 Stover Street
Fort Collins, Colorado 80524
Phone: (970) 498-9537
Cell: (970) 691-4239
Fax (970) 221-1521 e-mail: revessf5@nisn.com
Trnuwn TEn#inrrrtn#, llr.
3trurturat iEuginrrring & Jnoprrtinns
May 22, 2017
FR Development, Ltd.
125 S. Howes, 2nd Floor
Fort Collins, CO 80521
Re: Perimeter Drain & Damp -proofing Observations
at Lot 12, Block 7, Timbervine 2nd Fil., 387 Pilsner Street, Fort Collins, CO
Crown Engineering, Ile. Project No. 225-04-17-05
Gentlemen:
We have visually observed the perimeter drain being installed around the interior perimeter of
the crawl space of the home under construction at the above referenced location. This
observation was performed on March 16, 2017.
The drain consists of 4" perforated and socked drain pipe. It is placed around the crawl space,
interior perimeter. It is our opinion that the drain and sump pit as installed should be an adequate
means of draining out any rain, irrigation, or ground water that may filtrate to the crawl space
elevation of the home. The damp -proofing has also been applied using standard acceptable
practices.
Thank you for consulting with us on this phase of the project. If you have any questions, please
do not hesitate to contact me at (970) 691-4239.
Sincerely, RE
(Brawn Enat1TFPrtnAa,
Reyes armiento, P. • Q-�
Structural Engineer
g s�aNAL
Main Office
524 Stover Street
Fort Collins, Colorado 80524
Phone: (970) 498-9537
Cell: (970) 691-4239
Fax: (970) 221-1.521 e-mail: revessf5Cwmsn.com