Loading...
HomeMy WebLinkAbout2700 S Lemay Ave - Special Inspections/Engineering - 03/28/2017Z/10�60 WEEKS R eleeaC=ISITme STRUCTURAL ENGINEERS March 28, 2017 Ron Rudkin Rudkin Contracting Re: 2700 S. Lemay Fort Collins, Colorado On March 27, 2017 1 visited the referenced site as requested. The purpose of this visit was to determine the requirement for two openings in an existing bearing wall. The structure Is a one level commercial building with a basement. A 6' opening and a 3' opening is planned In the center bearing wall on the main level. The wall supports the roof trusses. Based on the proposed 6' opening and design loads it Is recommended a (3)-9 '/z" LVL header be used at the opening. The header should be supported on a 2-2x6 trimmer each end with a 2x6 king stud each end.. The header for the 3' opening should be 3-2x10's with 1-2x6 trimmer with a 2x6 king stud each end. Solid wood block the 2 Ys" space between the metal deck and the top of the beam In the basement under the trimmers of the 6' opening. GENERAL COMMENTS This report has been prepared based on observations of the portions of the structure visible and with generally accepted engineering practices in the area. Should different information become available the opinions and recommendations contained In this report should be reviewed and modified or supplemented as necessary. No warranty or guarantee, express or Implied, is made or Intended by this written or any oral report. If I can be of further assistance please contact me. Sincerely, Weeks & Associates, Inc. Gary Weeks =� �`[m1,LW I,D.I,AID Gary G. Weeks, P.E. Structural Engineer 4730 South College Ave, Suite 201, Fort Collins, CO 80525 Phone (970) 225 2422 - Fax (970) 225 2622 N