HomeMy WebLinkAbout2133 S Timberline Rd - Disclosures/Blower Door Test - 11/10/2016QnergyLogic
analysis. Insight. answers.
BUILDING LEAKAGE TEST
Date of Test: 11/10/2016 Test File:
Customer: Elder Construction Technician: Peter Oberhammer
Project Number: 43695
Building Address: Holmes Dental
2133 Timberline
Ft Collins, CO 80525
Test Results
1. Airflow at 50 Pascals: 2445 CFM50
(50 Pa = 0.2 w.c.) 2.87 ACH50 t{ l
2. Leakage Area: 134.5 in2 LBL ELA @ 4 Pa
3. Building Leakage Curve: Flow Coefficient (C) = 192.3
Exponent (n) = 0.650 (Assumed)
4. Test Settings: Test Standard: RESNET One -Point Test
Test Mode: Depressurization
5. Accuracy Level Standard Level of Accuracy Test
Infiltration Estimates
1. Estimated Average Annual Infiltration Rate: 151.5 CFM
0.18 ACH
25.3 CFM per person
2. Estimated Design Infiltration Rate: Winter: 268.1 CFM Summer: 168.3 CFM
0.32 ACH 0.20 ACH
Cost Estimates
1. Estimated Cost of Air Leakage for Heating:
2. Estimated Cost of Air Leakage for Cooling:
QnergyLogic
� BUILDING LEAKAGE TEST Page 2 of 4
` Date of Test: 11/10/2016 Test File:
Building Information Location Climate Information
Volume 51026 Ventilation Weather Factor 0.87
Surface Area 9755 Energy Climate Factor 17.00
FloorArea 2628 Heating Degree Days 6128
Height 24.5 Cooling Degree Days 297
#of Bedrooms 1 Design Winter Wind Speed 7.3 mph
#of Occupants 6 Design Summer Wind Speed 9.4 mph
I Year of Construction 2016 Design Winter Temp Diff 73 deg F
Wind Shield M Design Summer Temp Diff 15 deg F
Heating and Cooling Cost and Efficiency Information
Heating Fuel Gas
Heating Fuel Cost
Heating Efficiency%
Cooling Fuel Cost
. Cooling SEER
Equipment Information
Type Manufacturer Model Serial Number Custom Calibration Date
Fan Energy Conservatory Model 3 (110V) 42382 Default I
' Micromanometer Energy Conservatory DG700 �
QnergyLogic
� BUILDING LEAKAGE TEST Page 3 of 4
� Date of Test: 11/10/2016 Test File:
Depressurization Test:
Environmental Data
Indoor Temperature (°F) Outdoor Temperature (°F) Altitude(ft)
70.0 40.0 5280.0
. Baseline Pressure Data
' Baseline 1 (Pa) .1
Baseline 2 .1
Baseline 3 .1
Baseline 4 .1
Baseline 5 .1
Average Baseline(Pa) 0.1
Baseline Range(Pa) 0.0
Data Points- Data Entered Manually
Nominal Baseline Adjusted Fan Nominal Adjusted
Building Pressure Building Pressure Pressure Flow Flow Fan
(Pa) (Pa) (Pa) (cfm) (cfm) Configuration
-50.0 . -50.1 26.4 2501 2448 Open
Time Averaging Period: 30
Deviations from Standard RESNET One-Point Test-Test Parameters
None
QnergyLogic
� BUILDING LEAKAGE TEST Page 4 of 4. -
� da�e of Test: 11/10/2016 Test File:
Comments
Building passes 2012 IECC ACH requirement. Tested at 2.87 ACH. No garage so garage
connection test not needed.
�