HomeMy WebLinkAbout2015 Blue Yonder Way - Special Inspections/Engineering - 04/12/2016A.G. enaar Geotechnical and Environmental Consultants D R Horton 9555 South Kingston Court, Suite 200 Englewood, CO 80112 Attention: Mr. Tim Karns Subject: 2015 Blue Yonder Way Lot 15, Block 12 Sidehill, Filing 2 Project Number 131336 Reference: A.G. Wassenaar Report Project Number 131336, Dated 8/23/2013 2180 South Ivanhoe Street, Suite 5 Denver, Colorado 80222-5710 303-759-8100 Fax 303-756-2920 www.agwassenaar.com April 12, 2016 As requested, the following portions of the foundation system were observed on the date(s) indicated below. It is our opinion that the observed portions of the foundation system were found to be in substantial conformance with the foundation plan and requirements of the soil report for the subject site. Observations were conducted on a periodic, on -call basis. Date: Observation: 03/22/16 Excavation Observation 03/30/16 Excavation and Footing Form Observation 03/31/16 Foundation Wall Reinforcing Steel Observation 04/07/16 Community Underdrain Extension Observation 04/07/16 Damp -Proofing Observation 04/07/16 Foundation Void Observation 04/07/16 Perimeter Drain Observation ¢p00 L �,�.• ''R. BF Sincerely, Vu �3 59 A. G. WASSENAAR, INC. Kenneth R. Broseghini, P.E. Senior Engineer 0