HomeMy WebLinkAbout2015 Blue Yonder Way - Special Inspections/Engineering - 04/12/2016A.G.
enaar
Geotechnical and Environmental Consultants
D R Horton
9555 South Kingston Court, Suite 200
Englewood, CO 80112
Attention: Mr. Tim Karns
Subject: 2015 Blue Yonder Way
Lot 15, Block 12
Sidehill, Filing 2
Project Number 131336
Reference: A.G. Wassenaar Report
Project Number 131336, Dated 8/23/2013
2180 South Ivanhoe Street, Suite 5
Denver, Colorado 80222-5710
303-759-8100 Fax 303-756-2920
www.agwassenaar.com
April 12, 2016
As requested, the following portions of the foundation system were observed on the date(s)
indicated below. It is our opinion that the observed portions of the foundation system were found to
be in substantial conformance with the foundation plan and requirements of the soil report for the
subject site. Observations were conducted on a periodic, on -call basis.
Date:
Observation:
03/22/16
Excavation Observation
03/30/16
Excavation and Footing Form Observation
03/31/16
Foundation Wall Reinforcing Steel Observation
04/07/16
Community Underdrain Extension Observation
04/07/16
Damp -Proofing Observation
04/07/16
Foundation Void Observation
04/07/16
Perimeter Drain Observation
¢p00 L
�,�.• ''R. BF
Sincerely,
Vu �3 59
A. G. WASSENAAR, INC.
Kenneth R. Broseghini, P.E.
Senior Engineer