Temporary Certificate of Occupancy
Permit #: B1504206
Work Description: CONSTRUCT A 1 STORY BUILDING FOR LONGHORN STEAKHOUSE RESTURANT 5600 SQ
FT. WORK TO INCLUDE ALL INTERIOR FINISHES.
THE LANDSCAPE LIGHTING AROUND THE BUILDING IS NOT CONSENT WITH APPROVED
MINOR AMENDMENT LIGHTING PLAN AND IS NOT APPROVED.
This is to certify that the building, structure, or land located at 3450 S COLLEGE AVE Fort Collins, CO has been
inspected and temporary occupancy is hereby authorized, effective on 03/11/2016 and conditional upon the
following requirements being completed and approved upon final inspection.
Bldg Dept Req Docs Rcvd Requirements to be Completed By:
03(04/2016 ok for TCO only. Still need 1) Air tightness test 2) HVAC test and balance
Fire Authority Final Requirements to be Completed By: 03/31/2016
WWW Irrigation Final Requirements to be Completed By: 04/15/2016
Zoning Final Requirements to be Completed By:
03/01/2016 recieved landscape bond. hold full cto for building finishes and site clean up
Building Insp Completed Requirements to be Completed By:
0229/2016 Ok for TCO when..we. receive the 3rd party Engineers reportfor the framing.
Notes for the TCO:
The restroom doors open inward and are not automatic
The restroom faucets are not hands free
If such work is not completed within the time set forth above and approved on final inspection, or unless the.
time for completion is extended by the Building and Zoning Office, an order to vacate the premises, or a
.a 2
Contractor/Owner/Lessee Date
Authorized By Date of Issuance
NOTE: The issuance of this temporary certificate of occupancy will entitle the owner to place City Utility service in the owners name. Construction power rates
may be substantially higher than the rate to which the owner is entitled. Until the owner contacts the City Utility Office and makes the necessary arrangements to
transfer City Utilities to the owner's name, utilities will continue to be furnished at construction rates and both the owner of the property and the contractor will
continue to be liable to the City for all utility bills.