September 21, 2016
Lamar Valley Craftsman
2620 Brush Creek Drive
Fort Collins; CO 80528 ;--� v/ C O :�-o [� I
Observation Report ✓ /
Project: Hartmeister / Hellbaum Residence
Location: ✓3309 Buntwing Drive, Fort Collins Colorado
TDSE Project No.:. 15-098
Plans/Details: Plans by TD Structural Engineering Inc. dated 9/21115 and revised
. 1/26/16
Items Observed:. entry truss connections and steel column at stairs
Notes:
Observations indicate the entry truss connections are in substantial conformance with the plans
noted above.
It is our understanding. the column 2'-0" to the northwest of the western most corner of the stairs
has moved into the west corner of the stairs. The .pad was observed in its new location with the
column centered on .the pad. It is our opinion the `new location of the steel column and pad is
adequate for the design loads. �.
Sincerely,-
l
Jordan ,lNt"�' avorson, E:I T. /li
Associate,Engineer
TD Structural Engineering Inc.