Loading...
HomeMy WebLinkAbout6744 Snowdon Dr - Special Inspections/Engineering - 03/07/2016Crown Engineering, 1Ic. Structural FngP. ineering & Inspections March 7, 2016 Lorax Construction Fred Cooke 310 E. 5t" Street Loveland, CO 80537 Re: Footing Observation for 6744 Snowdon Drive, Fort Collins, CO Crown Engineering, llc. Project No. 30-01-30-02 Dear Mr. Cooke: We have visually observed the footing sizes and footing steel reinforcing at the residence under construction at the above referenced location. These observations were performed on February 23, 2016. It is our opinion that the footing sizes and widths and steel reinforcing were in general conformance with the foundation plan, drawn by Crown Engineering, llc., Job No. 30-01.-30-01, dated December 8, 2015. Thank you for consulting with us on this please of the project. If you have any questions, please do not hesitate to contact me at (970) 691-4239. Sincerely, Crown Fn inecnn :•.TIc. ljl Reyes Sarnq nto, P.E Structural Engineer Mtdn Office 524 Stover Street Fort Collins, Colorado 80524 Phone: (970) 498-9537 Cell: (970) 691-4239 Fax: (970) 2214521 e-mail: revcssf5(mmsn.com Crown Fn ineerin& 11c. Structural Engineering & Inspections March 7, 2016 Lorax Construction Fred Cooke 310 E. 5t" Street Loveland, CO 80537 Re: Wall Steel Observation for 6744 Snowdon Drive, Fort Collins, CO Crown Engineering, llc. Project No. 30-01-30-03 Dear Mr. Cooke: We have visually observed the concrete foundation wall steel reinforcing placed in the forms at the residence under construction at the above referenced location. This observation was performed on February 29, 2016. 'It is our opinion that the reinforcement was in general conformance with the foundation plan, drawn by Crown Engineering, llc., Job No. 30-01-30-01, dated December 8, 2015. Additionally, a UFER ground rod was observed to be placed within the foundation wall steel reinforcing. It is our opinion that the ground rod was placed per ground rod placement recommendations. Thank you for consulting with us on this phase of the project. If you have any questions, please do not hesitate to contact me at (970) 691-4239. Sincerely, rown n ineent-1 "(lc, . `Reyes mierlYo. P.E. Structural Engineer' , Main Office 524 Stover Street Fort Collins, Colorado 80524 Phone: (970) 498-9537 Cell: (970) 691-4239 Fax: (970) 221-1521 e-mail: revessf5',4msn.c0T11 Crown FngineerinJ Ilce Structural Engineering & inspections March 7, 2016 Lorax Construction Fred Cooke 310 E. 511' Street Loveland, CO 80537 Re: Perimeter Drain and Damp -proofing Observation at 6744 Snowdon Drive, Fort Collins, CO Crown Engineering, Ile. Project No. 30-01-30-04 Dear Mr. Cooke: We have visually observed the foundation wall damp -proofing and the perimeter drain installed at the residence under construction at the above referenced location. This observation was performed on March 7, 2016. The drains consist of 4" perforated and socked drain pipe. They are placed around the basement exterior and interior perimeters. The exterior perimeter drain is covered with approximately 6"- 8" of 3/4" or less pea gravel. It is our opinion that the drains and sump pit as installed should be an adequate means of draining out any rain or ground water that may filtrate to the basement elevation of the home. It is also our opinion that the damp -proofing has also been applied using standard acceptable practices. Thank you for consulting with us on this phase of the project. If you have any questions, please do not hesitate to contact me at (970) 691-4239. Sincerely, Crown rngineeririg, Reyes Sarmiento,.P.E. Structural Engiee-' Main Office 524 Stover Street Tort Collins, Colorado 80524 Phone: (970) 498-9537 Cell: (970) 6914239 Fax: (970) 221-1521 e-mail: revessf5cmmsn.com