Loading...
HomeMy WebLinkAbout2619 Platte Pl - Applications/Air Conditioner - 06/17/2016From 06/17/2016 05*24 0225 P.002/002 19 FCiof ort Collins Planning, Development & Transportation 281 N. College Ave P.O. Box 580 Fort Collins, CO 80524 Phone 970-416-2740 Fax 224-6134 OVER -TIDE -COUNTER PERMITS ONLY This application is to be used to apply for the following permits only (check all that apply).�Oir Conditioning ❑ Demolition (interior non-structural) ❑ Electrical Alteration (not service change) ❑ Gas Lighter ❑ Gas Log tir_Heating Unit ❑ Lawn Sprinkler ❑ Mobile Home replacement ❑ Roofing ❑ Sewer Line . ❑ Photo -voltaic Ventilation ❑ Water Heater ❑ Water Line ❑ Wood/Pellet Stove (must be EPA certified, provide make, model and manufacturer). Complete all applicable information on the application. Incomplete applications will not be accepted. Application #_ �%� U%'`/� Date mot 1�,11p For ofte use only lob Site Address (required) Value of Construction (labor, materials, profit) Property Owner Name Address 3r-c-.\k.. City/State Zip Phone 1 Applicant Name Address City/State Zip Phone Contractor Address City/State Zip Phone a Contractor City of Ft. Collins Sales Tax # Sales tax number iswuiredbyall eondactors Are you paying taxes here or by report? OpHere .Report Are you paying with your -trust account? 9Yes 13 No Is this a residential or commercial project? residential ❑ Commercial If residential; is it: ingle Family Detached ❑ Condo/townhome (single family attached) - ❑ Duplex El Multifamily (apartment) 0 Garage If commercial, is it: ❑ Bank ❑ Bar ❑ Church ❑ Hotel/Motel ❑ Medical office ❑ Office ❑ Retail ❑ Restaurant ❑ Other (explain) Is this building SO years of; age or more? ❑ Yes ❑ No If yes, you may need to contact Hlstorrc Preservation If this is for a demolition permit, what year was the building constructed? If prior to 1975, you will need an asbestos assessment to submit with this application. Description of *If lawn sprinider/bacidbw preventer, must list licensed plumber. If first-time A/C, must list licensed electrician. Subcontractors: List the company name or City of Ft Collins license # Electrician Plumber Mechardcal Roofer Other I hereby acknowledge that I have read this application and state that the above information is complete and correct. I agree to comply with all requirements contained herein and city ordinances and state laws regulating building construction. I know that a permit Is not valid until it has been paid and issued. Applicant: Print Name:_NL�Q Q, y"ey'r..' Signature x�e . a - • ��— Date