HomeMy WebLinkAbout3803 Precision Dr - Disclosures/Mechanical - 06/23/2016 (4)0-
City of Fort Collins Residential Mechanical Systems Performance Report Updated 3/7/2014
This form is a record of testing targets and results, with Pass/Fail outcomes. For information on measurement tools Cityof
and testing techniques, see the "Residential New Construction Mechanical Systems Testing Guide." The guide and Flirt Coltins
this form may be periodically updated; check the Building Services web site for the current version. �� u6�ities
This form must be completed and signed by an "Approved Agency," and submitted to Building Services as a requirement for receiving a C.O.
Color
key
HVAC
Target
Measured value
Other
or limit .
to compare with
Pass
Fail
Caution
data
target or limit
Bui
3So3
As -built changes vs
mech design submittal
Testing date(s) - Z z l
ilj4e
Bath exhaust
Flow w box _ Pitot tube duct traverse
to _Passive flow hood _ Other (note below)
ADCF = Air Density Correction Factor, based on tool,
ADCF altitude (5000% air temperature through tool
Volumetric flow (CFM 5000') = ADCF x Indicated flow (CFM)
I Date of "Residential
f a) Mechanical Systems
Design Submittal"
information referenced
by testing technicians
Air temp
through tool (F)
Testing tech (initials}}
ADCF
MPacurpd Airfinw
Design
Airflow
Minimum Airflow Requirement
Indicated
Volumetric
Exhaust Pickup Location
(CFM
(CFM 5000')
Flow
Flow
Pass
Fail
5000')
+ Type of Operation
(CFM)
(CFM 5000')
'a
50. Intermittent :_ 20 Continuous
!I�
S[!
tt
�-
❑
-L50+Intermittent _20. Continuous •
5�
/
IJ�
—.50 Intermittent Z-20 Continuous
a
t i
❑
50 Intermittent _ 20 Continuous.
j Z
16K_
❑
50 intermittent ." 20 Continuous
❑
❑
50Intermittent 20.Continuous
❑
❑
50lnte-rmittent 20.Continuous `
❑
❑
Testing
notes
Kitchen exhaust N/A - hood does not vent to outsidA:Ea-- Testing tech (initials)
Oven fuel Gas c ric Minimum airflow requirement (CFM 5000') + operation . 100 Intermittent 25 Continuous
Measured airflow
Flow — Flow box — Pitot tube traverse Tool — Interior grille Air temp
Passive flow hood _ Flow grid _ Exhaust duct through ADCF
tool 7—Powered flow hood Other (note below) location (Exterior termination not OK) tool (F)
Indicated flow CFM Volumetric flow CFM 5000' .❑;Pass 'El.
Testing
notes
Residential Mechanical Design Submittal V20140307 Page 1
•- ou4d Voh.t
ffatio'n'
Systems other than sub -structural floor exhaust Testing tech (initials)
Code -minimum ventilation airflow �! CFM 5000' Design ventilation CFM 5000' haust onl y
(based on CFA and # of BR)� airflow System
y Supply -only
type —Balanced
Target ventilation airflow range to CFM 5000' —
5�
F.
Measured
Balanced airflow in balanced systems
Average of measured CFM
supply + exhaust flows 5000'
Testing
Target flow range CFM
(average +/- 15%) to 5000' ❑'Pass u Fail
Sub -structural floor exhaust -- no sub -structural floor exhaust system Testing tech (initials)
Design exhaust airflow (based onCFM 5000' Target airflow limits to CFM 5000,
approved design) (design +/- 15%)
Measured airflow
Flow — Flow box — Pitot tube traverse Tool Air temp
tool — Passive flow hood Flow collar location through ADCF
Powered flow hood Other (note below) tool (F)
F
Indicated flow CFM Volumetric flow CFM 5000' 0 Pass j❑lii Fail
Testing
notes
N/A — No ductwork. Testing notes
o ductwork outside conditioned space (incl multiple sys)
Testing tech (initials):
Duct leakage _ Energy rater (name,
data source company, testing date):
House conditioned floor area sf Air temp ADCF
(include full basement) through tool (F)
Maximum Allowed Duct Leakage
Measured Duct Leakage
System #1
System #2
Test Parameter and Conditions
Normalized
(CFM25 5000' 1100 sf)
Absolute
(CFM25 5000')
Indicated
(CFM25)
Volumetric
(CFM25 5000')
Leakage Type
Timing
Air Handler
Pass
Fail
Pass
Fail
Total leakage
Rough -in
Excluded
3
❑
❑
❑
❑
Total leakage
Rough -in
Included
4
❑
❑
❑
❑
Total leakage
Complete
Included
4
❑
❑
❑
❑
Residential Mechanical Design Submittal V20140307 Page 2
For multiple systems, attach one page per system
System #F/ —1 Which parts of house does it serve?
Installed equipment (Be clear about which AC components are installed at time of testing) Testing tech (initial
Furnace or Boiler
AC or Heat Pump Condenser
AC or Heat Pump Coil
Manufacturer
rat
r
R�
Model #
k3 vi t 2ovQ 121
Filter sic fiberglass _ Electrostatic .
brand ' Type _ Basic pleated _ Other:
High-effic pleated.
Static pressures
(Speed: . Heating 2�Cooling _Cont. fan
_ High -stage for multi -stage equipment
Blower speed tap:
Humidifier damper: _(/—N/A
Open (Heating)
_ Closed (Cooling)
registers open
dampers open
SP1
OP Filter
(SP1 -SP2)
SP2
Thickness MERV
(inches) Id
(optional) F1
Testing tech (initial4�_
(Same location
• SP4 Q / for NSOR
( TFSOP)
AP Coil
(SP3-SP4)
• SP3
AP Total ESP
(SP3-SP2) 1
Cooling: Measured air flow through indoor coil ❑. N/A -- no AC installed Testing tech (initial
Design cooling airflowCFM 5000' Target airflow limits ` to .. CFM 5000'
(high stage) � J (design +/- 15%) 7
`Measured airflow
temp
PI sze 0 Flow grid 5�_Ut through j C ADCF t! O[r� NSOP 2� TFSOP �+ Correction Factor TIC Gov
Measured airflow, no
Indicated Indicated airflow x�m�(% CFM
Volumetric airflow�CFM
amass
adjustment/correction
Measured AF x FRCF v V —
Indicated AF x ADCF _!. = 5000'
❑ Fail
Testing
notes
Heating: Gas manifold pressure
(high stage)
Testing tech (initials)
Manifold pressure 3 IWC
OEM 5000'
Target manifold P to
limits +/- 5%) 3 �.
IWC Measured 9�IWC !amass
3
spec @
(spec .
pressure E Fail
Heating: Temperature rise
Testing tech (initials) --
OEM temperature rise limits
(high stage)
, %G
; `'i
tbd
F
Supply 7
Measured temps (F): air
_ Return _ Temp �^�/
air 7� — rise J /
�:# —Pass Caution: within 10F
Yam: Fail 1❑)of top of range
Residential Mechanical Design Submittal V20140307 Page 3
Testing tech (initials)
Testing approach and targets
❑ NIA: No complete AC system i❑, N/A: House completed November - April (installing contractor responsible for testing in warm weather)
❑.TXV: Subcooling + SH check ❑ Non-TXV: Superheat ❑.OEM -specific: Approach ;❑, Other OEM -specific (documentation required)
Temperatures Condenser Non-TXV: Return Target > : Target Target ..
p (F): entering air temp air wet -bulb temp superheater subcool ng approach
Subcooling
Discharge Condenser Liquid Actual i❑ TXV Pass: Actual SC within +/-
pre (sur;❑ saturation T❑F line❑F subcooling❑F IQ F of target SC, 2 F min
PSI (5000' chart) temp (Good T - liq line T) I❑� TXV Fail
Superheat
Suction Evaporator Suction Actual �❑ Non-TXV Pass: Actual SH
pressure saturation
saturation T❑F line❑F superheat
❑F within +! 5 F of target SH
(PSI) (5000'chart) temp (SuctlineT-evapT) Non-TXV Fail
TXV checks: :❑. Pass: Field -installed TXV installed in accordance with OEM instructions Caution: Actual SH outside mfgr range
Approach
Liquid line Actual pp Actual approach Approach
temp (Liq line T - condenser EAT) D,APProach Pass: Actual approach within +!- 1 F of target approach
LQ Approach Fail
Register air flows
F_
All registers are cut through finish materials and moving air , ass Fail
(Remainder of register air flow section under development, not yet being enforced)
Pressure balance
Testing tech (initials)`J°
Testing tech (initials)
Room
(match names on plans, include
basement if there is a door)
Room -to -Core
Pressure Drop
Target Range (Pa)
Measured
Pressure
Drop (Pa)
Pass
Fail
Wa der
_3.to..+3.:.
l� S
5�—
❑
-3 to..+3. ..
l k
❑
-3 to '+3
i �
❑
...73 to.+3 ... ,
❑
. ❑.
-3 to .+3 ..
❑
❑
-3 to +3 ..:..
❑
❑
_4to.+3 :....
❑
❑
-3 to +3 .:. '
❑
❑
-3 to ;+3
❑
. ❑
Residential Mechanical Design Submittal V20140307 Page 4
om6ustion safety testing N/A -- no natural -draft combustion appliances
(Appliance Types table must be completed for every home)
Appliance types
Testing tech (initia C �
Appliance
Combustion
Type
NSA
Draft -hood
Natural -draft
Induced -draft
Natural -draft)
Power-
vent
Direct-
vent
Powered sealed -
combustion
Electric
Furnace #1
❑
❑
❑
❑
❑
❑
Furnace #2
❑
❑
❑
❑
❑
❑
❑
Boiler #1
❑
❑
❑
❑
❑
❑
❑
Boiler #2
❑
❑
❑
❑
❑
❑
❑
Water heater #1
❑
❑
❑
42—
❑
❑
❑
Water heater #2
❑
❑
❑
❑
❑
❑
❑
Fireplace #1
❑
❑
❑
❑
❑
❑
❑
Fireplace #2
❑
❑
❑
❑
❑
❑
❑
Other:
❑
❑
❑
❑
❑
❑
❑
Worst -case depressurization performance
House setup
These doors are closed:
_ # of bath fans on
_ Vented range hood on
_ Clothes dryer on
Air handler on
Other fans on:. Other setup notes:
Outdoor temperature F
CAZ pressure
BPI depressurization limit
(Pa wrt outside)
Measured net CAZ depressurization
(Pa wrt outside)
OK (less negative) Caution (more negative)
i. Spillage
BPI maximum limit
(seconds;
Measured spillage duration
(seconds;
Pass = duration not exceeding limit
Draft pressure
BPI limit
(Pa wrt CAZ;
Measured
(Pa wrt CAZ;
Pass = pressure more negative than limit
CO concentration in undiluted flue gas
❑ OK '. ❑ . Caution ❑ OK I ❑ I Caution ❑ JOK 1. ❑ Caution
60 ..
60
60 ..
❑
I Pass I • ❑ Fail
❑
I Pass I ❑ Fail
❑
I Pass I ❑ Fail
❑ Pass , ❑ Fail ❑ I Pass ❑ Fail ❑ Pass ❑. Fail
BPI maximum limit (ppm) "100 .100 100.
Measured CO (ppm)
Pass = CO level not exceeding limit ❑ Pass , ElFail El Pass El Fail ❑ I Pass I ❑ Fail
Caution = CO level 25 to 100 ppm ❑ Caution ❑ Caution ❑ Caution
Testing
notes
Residential Mechanical Design Submittal V20140307 Page 5
System
Controls Operating
Per Design Intent
Local exhaust (all fans)
❑
N/A
Pass
❑
Fail
Whole -house ventilation
❑
N/A
Pass
❑
Fail
Sub -structural floor exhaust
N/A
❑✓
Pass
[-IFail
Heating (all systems)
ElN/A
N-
Pass
❑
Fail
Cooling (all systems)
❑
N/A
F=
Pass
❑
Fail
Technician #1 performing inspection and testing documented on this report (Approved Agency)
I certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the
City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
`s
Name (print) I /�
(" 6�c' Z'C nVVLtfi.n
Title
Company 'S?'r V LC1450
3 Signature and Date
Technician #2 performing inspection and testing documented on this report (Approved Agency)
I certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the
i
City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
.' Name (print)
Title
Company
Signature and Date
HVAC Contractor (City of Fort Collins license holder)
.... I certify that I have reviewed this report and that the test results are an accurate representation of the performance of the installed mechanical
systems.
Na
Signature
Residential Mechanical Design Submittal V20140307 Page 6