HomeMy WebLinkAbout440 Circle Dr - Special Inspections/Engineering - 05/25/2016 (2)QUALITY `x ENGINEERING W W W.QUALITY-ENGINEERING.COM May 25, 2016 Mr. Jordan Obermann 614 W. Mountain Ave. Fort Collins, CO 80521 RE: Footer Inspection Letter 440 Circle Drive Fort Collins, CO 80524 QE Project No. 6296-001 Dear Mr. Obermann: At your request, a representative of Quality Engineering was present at the above referenced address to observe and document footing and foundation wall formwork and reinforcement on May 4, 2016. The formwork and reinforcement that we inspected is in compliance with the direction, details, and specifications of the plans, dated February 29, 2016 with the exceptions noted: The spread footing between the two garage doors was specified as an 8"x24" footing and was not 24" wide at the time of the inspection. Quality Engineering verified load requirements for the foundation and requested that a 30"x30"x8" pad be poured underneath the 3'/2"x7%2" LSL post. Since these changes have been made, the footing and foundation wall formwork and reinforcement have been constructed in compliance with no exceptions noted. Quality Engineering, LLC has only visually inspected the items noted above. We have not performed an in-depth;load analysis on all portions of the structure. It is possible that structural defects exist as a result'of items that were not inspected or that were not visible. No warrantee is either expressed or implied. If you have any questions or if you require further investigation concerning this structure, please call at (970) 416-7891. -W&q&Vft%ft_ Sincerely, QUALITY ,ENGINEERING, LLC Morgan Fay, PE Structural Project Manager QUALITY ENGINEERING, LLC (970) 416-7891 2637 MIDPOINT DRIVE, SUITE E FORT COLLINS, COLORADO QUALITY `x ENGINEERING W W W. QUALITY -ENGINEERING. COM May 25, 2016 Mr. Jordan Obermann 614 W. Mountain Ave. Fort Collins, CO 80521 RE: Framing Inspection Letter 440 Circle Drive Fort Collins, CO 80524 QE Project No. 6296-001 Dear Mr. Obermann: At your request, a representative of Quality Engineering was present at the above referenced address to observe and document framing and connections on May 18, 2016. The formwork and reinforcement that we inspected is in compliance with the direction, details, and specifications of the plans, dated February 29, 2016 with the exceptions noted. • Substitutions were made for framing connections as noted below: Orieinal Substitution Comments CC46 AC6Z Acceptable substitution - follow maximum nailing requirements per manufacturers' installation guide HTHMQ-2- SDS HUS210-2 (Ridge Beam) LSSU210-2 w/ A34 or A35 angle clips Acceptable substitution - install concealed (Valley Beams) flange hanger first and then valley beam hangers w/ angle clips; it was observed on May 18, 2016 that the angle clips would be necessary and were added per QE's request LSU3510-2 LSSU210-2 Double -Hanger must be used with (2)-2x12's LSSU210 which are immediately adjacent to the valley beams; the single hanger is permitted on the outside with a concealed flange face - mounted hanger. Upon installation of the substitutions, Quality Engineering has found the framing to be in substantial compliance with the direction, details, and specifications of the aforementioned plans. QUALITY ENGINEERING, LLC (970) 416-7891 2637 MIDPOINT DRIVE, SUITE E FORT COLLINS, COLORADO Page 2 RE: Framing Inspection Letter 6296 Circle Drive Fort Collins, CO 80524 QE Project No. 6296-001 Quality Engineering, LLC has only visually inspected the items noted above. We have not performed an in-depth load analysis on all portions of the structure. It is possible that structural defects exist as a result of items that were not inspected or that were not visible. No warrantee is either expressed or implied. If you have any questions or if you require further investigation concerning this structure, please call at (970) 416-7891. Sincerely, QUALITY ENGINEERING, LLC /t�r yAr Morgan Fay, PE Structural Project Manager