HomeMy WebLinkAbout5827 Tilden St - Correspondence/Water and or Sewer - 05/03/2016FORT COLLINS• LOVELAND WATER DISTRICT nQ a 3OUTH.FORT COLLINS SANITATION DISTRICT
Date: k
f �X
` Z16
TO: Cityofrt ColliiinsBuilding Inspections Department
FROM: Fort Collins -Loveland Water District
South Fort Collins Sanitation District
RE: Water and Sewer Approval
IN�0IIa5
This is to verify that MeritajZe Homes
has applied for a Water and Sewer Tap for
Mall Creek Cross 11Z,g (Subdivision)
582 % Tilden St (Building Address)
LI B6 (Lot Number)
.. The following Taps pertain to the above mentioned address:
X Water X Sewer
Fx] Water Tap Fee has been paid, a Building Permit may be issued.
Sewer Tap Fee has been paid, a Building Permit may be issued.
f
All Tap Fees must be paid prior to issuing a Structure Building Permit.
Name of Districts: Fort Collins -Loveland Water District/ South Fort Collins Sanitation District
(FCLWD / SFCSD)
Signed: - ,Z
7 //I
Please return to the City of Fort Collins Building Inspections Department for Building Permit.
Structure
Pressure Regulating Valve Required
5150 Snead Drive, Fort Collins, CO 80525 Phone (970) 226-3104 Fax (970) 226-0186