HomeMy WebLinkAbout826 Jerome St - Disclosures/Blower Door Test - 08/10/2018BUILDING LEAKAGE TEST
Date of Test: 8/10/2018
Customer:
Test Results
1. Airflow at 50 Pascals
(50 Pa = 0.2 w.c.)
2. Leakage Area:
3. Building Leakage Curve:
4. Test Settings:
5. Accuracy Level
Test File: 826 Jerome St Unit 2 2.06ACH 8.10.18
Technician: Greydon Studer EnergyLogicv
Project Number:
Building Address: 826 Jerome St
Unit 2
Fort Collins, CO 80524
561 CFM50 (+/- 1.2 %)
2.06 ACH50
30.9 in2 LBL ELA @ 4 Pa
Flow Coefficient (C) = 30.0 (+/- 14.9 %)
Exponent (n) = 0.749 ( +/- 0.039 )
Correlation Coefficient = 0.99867
Test Standard: RESNET Multi -Point Test
Test Mode: Depressurization
Standard Level of Accuracy Test
Infiltration Estimates
1. Estimated Average Annual Infiltration Rate:
2. Estimated Design Infiltration Rate:
Cost Estimates
1. Estimated Cost of Air Leakage for Heating:
2. Estimated Cost of Air Leakage for Cooling:
You created this PDF from an application that is not licensed to print to novaPDF printer (hftp://www.novapdf.com)
BUILDING LEAKAGE TEST Page 2 of 4
Date of Test: 8/10/2018 Test File: 826 Jerome St Unit 2 2.06ACH 8.10.18
Building Information Location Climate Information
Volume
16335
Surface Area
Floor Area
Height
# of Bedrooms
# of Occupants
Year of Construction
2018
Wind Shield
M
Heating and Cooling Cost and Efficiency Information
Heating Fuel Gas
Heating Fuel Cost
Heating Efficiency %
Cooling Fuel Cost
Cooling SEER
Ventilation Weather Factor
0.87
Energy Climate Factor
17.00
Heating Degree Days
6128
Cooling Degree Days
297
Design Winter Wind Speed
7.3 mph
Design Summer Wind Speed
9.4 mph
Design Winter Temp Diff
73 deg F
Design Summer Temp Diff
15 deg F
Equipment Information
Type
Manufacturer
Model
Serial Number
Custom Calibration Date
Fan
Energy Conservatory
Model 3 (110V)
Default
Micromanometer
Energy Conservatory
DG700
You created this PDF from an application that is not licensed to print to novaPDF printer (hftp://www.novapdf.com)
' BUILDING LEAKAGE TEST
Page 3 of 4
Date of Test: 8/10/2018 Test File: 826
Jerome St Unit 2 2.06ACH 8.10.18
Depressurization Test:
Environmental Data
Indoor Temperature (OF)
Outdoor Temperature
(OF)
Altitude (ft)
70.0
85.0
5000.0
Data Points - Data Entered Manually
Nominal Baseline Adjusted
Fan Nominal
Adjusted
Building Pressure Building Pressure
Pressure Flow
Flow
Fan
(Pa) (Pa)
(Pa) (cfm)
(cfm)
% Error
Configuration
-2.5 n/a
n/a
-72.0 -69.3
123.6 660
714
-0.4
Ring B
-66.0 -63.4
108.6 619
670
-0.0
Ring B
-60.0 -57.4
96.5 584
632
1.6
Ring B
-54.0 -51.4
75.5 517
559
-2.3
Ring B
-48.0 -45.4
66.6 486
526
0.8
Ring B
-42.0 -39.4
54.3 439
475
1.3
Ring B
-36.0 -33.4
40.6 380
411
-0.8
Ring B
-30.0 -27.4
30.5 330
357
-0.1
Ring B
-2.8 n/a
n/a
Time Averaging Period: 5
Deviations from Standard RESNET Multi -Point Test - Test Parameters
- The Time Averaging Period
is less than 10 seconds.
You created this PDF from an application that is not licensed to print to novaPDF printer (hftp://www.novapdf,c )
BUILDING LEAKAGE TEST Page 4 of 4
Date of Test: 8/10/2018 Test File: 826 Jerome St Unit 2 2.06ACH 8.10.18
Comments
No attached garage.
CAZ -49
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)