Loading...
HomeMy WebLinkAbout1197 Redwood St - Special Inspections/Engineering - 08/13/2014ANCHOR ENGINEERING, INC. 2535 17TH STREET, DENVER, CO 80211  303-783-4797  303-830-9133 FAX  WWW.ANCHORENG.COM  D E S I G N I N G D E N V E R A N D B E Y O N D  LETTER OF FOUNDATION GENERAL CONFORMANCE August 13, 2014 Aspen Heights 330 S. College Ave. #200 Fort Collins, CO 80525 ATTN: Roger Frakes Project: Aspen Heights Student Housing 1197 Redwood St. (Alpine Unit 5) Fort Collins, CO 80524 Permit #: B1400313 Mr. Frakes, Per your request, our office has performed the Construction Phase Consulting Services for the above mentioned project including the following: • Review of concrete mix designs supplied by Innovative Concrete Solutions. • Review of stressing equipment calibration logs supplied by Innovative Concrete Solutions. • Review of observation logs for post-tension concrete stressing supplied by Terracon. • Request For Information (RFI) submittal review and response. Our previous field observation report dated June 5, 2014, noted deficiencies within the post-tension slab-on-grade at the above mentioned project. It is our understanding, as relayed by Innovative Concrete Solutions, that all of the deficiencies have been corrected and that all stressing operations have been completed. Based on our review of the information noted above, Anchor Engineering, Inc. feels that the post-tension concrete slab-on-grade foundation for the above mentioned project has been completed in general conformance with the structural foundation drawings prepared by our office. Should questions arise, or if further information is required, please contact our office. Sincerely, Anchor Engineering, Inc. Reviewed by, Jared S. Hensley, P.E. David A. Poe, P.E., S.E. Project Engineer Principal