Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2138 Yearling Dr - Disclosures/Mechanical - 07/04/2015
City of Fort Collins Residential Mechanical Systems Performance Report This form is a record of testing targets and results, with Pass/Fall outcomes. For Information on measurement tools and testing techniques, see the 'Residential New Construction Mechanical Systems Testing Guide.' The guide and this form may be periodically updated; check the Building Services web site for the current version. This term must be completed and signed by an 'Approved Agency; and submitted to Building Services as a requirement for receiving a C.O. Color key Target Measured value �mN F < ' -;?= �.Olher prhrrti(= to compare with Pass Fa , cauili: ; data target or limit s as' F CF = Air Density Correction Factor, based on tool, ADCF altitude (5000% air temperature through tool umeMc now (CFM 5000') = ADCF x Indicated flow (CFM) Minimum Airflow Requirement Indicated Volumetric Exhaust Pickup Location +CFM (CFM 5000') Flow Flow Pass Fail 6000' +Type of Operation (CFM) (CFM 50001 )ntarrRltenl 20 Conhnuots -'= SOlntoimilton[ 20Conlinuous.: ❑.., ❑ .. ' ' "' 50 InterinlRenl 7,0 Continu0ug ❑.;[]� -. .... ' •.' '' ; ' .:: � :501ptafrtlitlanl 20 CanUnuous,! ❑ ��] 501ntermllt 2QConWuo s } kr a 501n}errnPlen! 20Continuoug ❑. t)0n -7777777777777777 ... .. 59 )ntef_rnlltent ..T2+] CopllnuoljS - ❑.,,❑; Testing notes Kitchen exhaust N/A - hood does not vent to outsideEl Testing tech (Initials) R.S Oven fuel Gas _ Electric Minimum airflow requirement (CFM 5000') + operationzQ ,LS100 Intahnlltent ;ZS�CohllnuoUs.: —Weasured at ow . Tool locatlon—Exhapstduct IOterior dlle :,..'.,': ; -� g �_< FE4; l temunaapq rmtoK) Air temp '• ' through 67°'.:;. ADCF 1'.098,.,.': tool (F) Flow tool :Flow box . , _ Pitot tube traverse ' ...pas gNe flow hood Flow rid: — g'': •' '''Powered flow hood _ Olher (note below) • >:�l Indicated flow 221 '. , , 'CFM Volumetric flow 243 CFM 5000' kPass iU[].'Fall $ Testing notes Residential Mechanical Design Submillal V20140101 Page 1 c Testing tech (initials) R-S Testing approach and targets ?;`: ❑ N/A: No complete AC system ® N/A: House completed November- April (Instaling aoatraaur responsible for lesung In warm weather) 'µj(S[ZTXV: Subcooling + SH check ❑ Non-TXV: Superheat ❑ OEM -specific: Approach ❑ Other OEM -specific (documentation regwred) Target Target " Target (F): enledNon-TXV: ReturnTemperatures Condenser air wet -bulb temp supesubcool approach h Subcooling .11 Dischar a Condenser Liquid Actual ❑ TXV Pass: Actual SC within +/- pre(PSI)l salutation ;�F IIne�F subcoolin)F 3 F of target SC, 2 F min PSI (s000�chan temp (condr•ugEno r) O.TXVFaII Superheat Suction Evaporator Suction Actual ❑Non-TXV Pass: Actual SH pressure❑ saturation T❑F IIneF superheat❑F within V Fall f target SH (PSI) (SOes-chad) temp (suallnei•evapi) )]AjNon-TXV . TXV checks: ❑ Pass: Field -installed TXV Installed In accordance with OEM instructions ''Dj'Caution: Actual SH outside mfgr range Approach Llquld Unteme�o T- condenser EAT)F Actual approach❑F El Approach Pass: Actual approach within +l- 1 F of target approach p (Dq lin]Approaeh Fall Testing ' notes Fe Register air flows Testing tech (initials) R.S Ail registers are cut through finish materials and moving air Pass j] Fail (Remainder of register air flow section under development, not yet being enforced) Pressure balance Testing tech (Initials) R.S Room Room -to -Core Measured (match names on plans, Include Pressure Drop Pressure Pass Fail - basement If there Is a door) Target Range (Pa) Drop (Pa) Master :Bed -0.6 3 to31.4Re t=[j Bed.43..'.' .3to+3 2.9 » zF R*F.lwl;F a 3to't3 ❑ l -3to+3 ❑ K� 3 to t3 ❑ Wg Foos rQ Residential Mechanical Design Submittal V20140101 Page 4 Combustion safety testing N/A -- no natural -draft combustion appliances F77771 Testing tech (initials) (Appliance Types table must be completed for every home) LLJ Appliance types Appliance Combustion Type N/A (Drafhood Natural -draft ) Induced -draft (Natural -draft) Power- vent Direct- vent Powered sealed - combustion Electric Furnace #1 El El El 0 13 El Furnace #2 ❑ El Boiler#1 El E1 TI 'D .0 El. Boiler #2 Water heater #1 Water heater #2 IET- Fireplace 91 Fireplace #2 :Z Other: ❑El❑ q Worst-case depressurization performance Outdoor temperature F Appliance % GAZ pressure BPI depressurization limit (Po wrt ou�slds) Measured not CAZ depressurization (Pa wrtouside) OK (lose negative) I Caution (more negative) Spillage BPI maximum limit (seconds) Measured spillage duration (seconds) Pass = duration not exceeding limit -1 'Draft pressure BPI limit (Pa wrt CAZ) Measured (Pa vat CAZ) Pass = pressure more negative than limit ...... . . .. i. ......... . ..JIO 1- U0 OK ICaullon['111: .10K 1,' '?]Cautlonj Csullen Fall -'IPass -flFall TI. jPass ix Fell %E]...Ipass Maj Fall JJT]Pass Q Fall ', CO concentration In undiluted flue gas BPI maximum limit (ppm) Measured CO (ppm) Pass = CO level not exceeding limit :144Pass _ Fall Pass §Q Fe[ 'i.,.J Pass J'Ag'-JFall 1I Caution = CO level 2510 100 ppm !�ff ffj Cau Ilan Icaution gjpy'.. Caution Testing i notes Residential Mechanical Design Submittal V20140101 Page 5 System Controls Operating Per Design Intent Local exhaust (all fans) ❑ NIA .❑ Pass W'>Kp� Fall Whole•houseventilation ❑ WA ;❑,. Pass 'Q Fail Sub -structural floor exhaust 0 N/A `•'0 ; Pass Mr Fall Raclin ails slams) B ( Y ❑ N/A , Pass '--�. a Fail Coolingall systems) ( Y ) ❑ N/A �f`: Pass K? �[_]� Fail Testing tech (Initials) R.S Testing Notes Technician #1 performing Inspection and testing documented on this report (Approved Agency) OR, alI certify that the tests referenced above, In sections bearing my Initials, were performed In accordance wI[h protocols specified by the -,City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge. k�Y R X Name (print) RIGOBERTO ;�µa1 l,x Title TECH i Company FOUR SEASONS HEATING Signature and Date RIGOBERTO SANTIBANEZ 4/6l15 Technician #2 performing Inspection and testing documented on this report (Approved Agency) £I certify that the tests referenced above, In sections bearing my Initials, were performed In accordance with protocols specified by the t--City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge. Name (print) .. .. .. Title .. ..... , .. .. . € n Company ) eta .. ..... .. : ' •... ,.. '. '. .. Signature and Date HVAC Contractor (City of Fort Collins license holder) s�ss;�1 i %I certify that I have reviewed this report and that the test results are an accurate representation of the performance of the Installed mechanical g, ,. ,systems. pq rV' r Ignu Name (print) Lynn Cobb . s$; _; Title Project Manager xr') l,z Company Four Seasons Healing Inc. F. [� , y Signature and Dale Lynn Cobb 4/7115 Residential Mechanical Design Submittal V20140101 Page 6 Systems other than sub -structural floor exhaust Testing tech (fnillals)FR.8 Code -minimum ventilation airflow (based on CFA end 87 CFM 50001 Design Ventilation 87 CFM 5000' airflow System Target ventilation airflow range ...... .... . CFM 6000' type ............ utuaburuis /urnow I To rT 'r A mp p Indicated Volumetr1Volumetricam Measurement Method Too[ Location Th a h g ug ou ro r ADCF Flow Flow Pass Fall T T, I (F oo[ (F) (CFM) (CFM 5 000.) 'Passive flowbood.-. t LPRollube't. traverse. Main floor bath 7 09 8 :� 1- 93 103 io Flowcoilar Oth . . . NIA :.-Passlveflowhc, od ... . . . . . . I Flow box. _L Filet tube traverse FIOW66ilar Other (nota.bslow) When Supply airflow Is circulated by air handler fan, fan speed for measurement L Heallng 'Coolirig ::'.4 6oriiin ueus tan )lanced airflow In balanced systems Average of moasuredF-7777.771 CFM supply+ exhaust nowsl I'.. ' : , 5000, Target now range CFM (average +1- 15%)17 to 5000' r, Sub -structural floor exhaust 0 NIA --no sub-structuraf floor exhaust system Testing tech (Infllals)ED LLg Design exhaust alrilow (based onF77777771 Target airflow limits N��- ��g—� CFM 5000' _' approv ed design)[ CFM 5000' (design +I- 15%)m iW Measured airflow Flow box Pilot tube traverse F:.. Air temp 7777771 F7 Flow Tool I '2 �'_-Pa$sFVofloWjhoqd %�L:Flow col ar.: - 7 Z tool location i. through ADCF Po�-Iia�d now hood Other b few) LP:: F tool(F) El Indicated flow CFM Volumetric now CFM 5000' Pass Testing notes NIA ductwork. Testing notes No. outside rendition (MCI muluple Sys) "':-Testin (initial Duct leakage .'E nergy. data source :.. company, testing date): House conditioned floor area sf limclude U baser Air tempi through to LLLA r77777771 ADCF I . . +... -... :. � � I F—Maximum Allowed DuctLeakage I Measured Leakage21c Duct ['I Test Parameter and Conditions -Handler Normalized Absolute .811�koge Indicated Volumetric rn �Tt am System ystem, #1 System 42 Leakage Type Timing TAir (CFM25 5000'1100 so (CFM25 5000')l (CFM25) l(CFM25500D')I Pass] Fall Pass l Fall Total leakage Rough -in Excluded 2 A Total leakage Rough -in Included 'J Total leakage Complete Included ea age to outdoors Complete Included 8 92 ❑0" N �B Residential Mechanical Design Submittal V20140101 Page 2 For multiple systems, attach one page per system System # ED Which parts of house does It servo? Main FIOof ,Installed equipment (Be clear about which AC components are Installed at time of testing) Testing tech (initials) FS - . t Manufacturer Furnace or Boller AC or Heat Pump Condenser AC or Heat Pump Coll T- B;ryan :.: -, .:- *. -, , Car :- r t - - -: . * - ' �*;..-'� . t :.1..., . . ... :16NP.VP3017ALAAAAA PllterF77771 Basic nb6rgtdss 77777777 Thickness MERV lColumbus.,:.:l Type asic pleated - —Othor, 19 1 bra (Inches) (options]) ILI Static pressures Testing tech (Initfals)FT7 (Same locationSP4 for NSOP. \ TFSOP) Ap Coll r77777771 F-- 7771 -SP3 AP Total ESP (Sp"K) Cooling: Measured air flow through Indoor coil O WA-- no AC Installed Testing tech (Initials)KF771 Targ6t airflow limits Design cooling airflow 908 CFM 5000' (Ugh a e:slgn +1. 150/, slags) (d CFM 500D' Measured aliflow Flow Odd Air temp 14% plate size through ?o. EJ 0 ADCF 98 NSOP 30 TFSOP Flow Resistance ELI Correct! P1 _7,( tool (F) Vtl g� Measured airflow. no adjustmenticorrectlon CFM Indicated airflow CFM measured AFx FRGF Volumetric al dlow CFM PASS 910 1ndicatcdAFxA0CF 5000, Fall Testing noted % Healing: Gas manifold pressure (h19h stags) Testing tech (Initials)FR--S, F-7777771 Q Target manifold P [&ass ' 7 pre iE[Fall Manifold pressure IWC Measured 3 5 WC . .... OEM Spec @ IWC limits (Spec +/- 5%) Healing: Temperature rise OEM temperature rise limits (Ugh stage$M—M F Supply Retur== Temp Measured temps (F): air air[E� rise Pass E] -El Testing tech (initials) FEI 17V Fall r-Caution: within 1 OF ,,.,,qof top of range Residential Mechanical Design Submittal V20140101 Page 3 Testing tech (Infilals) To sting approach and targets P NIA: No complete AC system El NIA: House completed November - April (Instaning contractor responsible for testnti in wam weather) TXV: Subcooling + SH check El Non-TXV. Superheat ❑ OEM -specific: Approach ❑ Other OEM -specific (documentaUon required) Temperatures Condenser F_71 Non-TXV: Return F7771 Target Target fggggg Target (F): anteringaIrtempi air wet -bulb temp superheat part M AN subcoolir• approach ONO Subcooling ischarge Condenser D F-7- 7 pros sure saturation r Llquldr F F Actual subc rig ,co�u n F F TXV Pass: Actual SC v6i[hln +f 3 F of target SC, 2 F min (PSI) LA LJ t a. (Cm d T - rsq Me T)❑-Q.TXV Fall Superheat Suction pressure P Evaporator f_7 _-_1 Suction r7' �� saturation T F lIn F Actual superhe F 0 Non-TXV Pass: Actual SH wIthin +1- 5 F of target SH (PSI) lampNon-TXV (suct line T - evap T)F] Fall i TXV checks: El Pass: Field -installed TXV Installed In accordance with OEM InsWcgons Mcaution: Actual SH outside mfgr range Approach Liquid line F Actual approach Ftemp (Liqliner-oodenserEAT) 0 Approach Pass: Actual approach within 1 F of target approach `_QApprGach Fall . ........ w %Im ov, I- �PAl rR9OWesgUffiPaldficeP. , Register air flows AT] registers are cut through finish materials and moving air Qj Pass Fall (Remainder of register air flow section under development, not yet being enforced) Pressure balance Testing tech (Inlllals)[R.S7 Testing tech (Initals)[FR.S Residential Mechanical Design Submittal V20140101 Page 4 Combustion safety testing NIA -- no naluraldraft combustion appliances 10 .. 71 (Appliance Types table must be completed for every home) Testing tech (Inlllals) RS .> Appliance types - Appliance Combustion T e NIA Draft -hood (Natural -draft) Induced -draft Natural -draft Power- vent Direct- vent Powered sealed - combustion Electric Furnace#1 �❑�� "t:::': �.:`:':.:; .:`❑:r:[ ;: �':.:❑:.'f: ?'�,!:p.� ;' Furnace92 ❑ "❑ ` .,'.;❑`.;!;:; i ':`.❑ ;` :'r .;r: i:�:':J'.,"':. '=:i❑:;` s'GBoiler#1 :❑: :.'..':._❑.':`.:::i;`::::'.:c'=a;❑.:`:`:❑:i:a'r:z'ft;;'.;.'>::.:':< 23El`...' Boller H2 Water heater#t ❑ :.::�❑': �.:�.:.°.. ❑;� �. �:.a...: ':a.:.. :;:.❑::: '.�:::::>❑;': Water healer#2 .❑ ...:',❑ .:.,,;.: .,::'❑:::;;; :: 3 :: :' :C;�':i>❑.`'t''.:;;:::❑:'. Fireplace#1 ❑.......❑ :..:..:....:...❑ :...::.:::;❑;:.:: .:,;:.o::::'::;:..:::❑�:::::.::.�:::::.❑::: ,. Fireplace#2❑.:::::❑ ':.r::;::' .. ❑' ,.':Q.;,::.::❑.::.:.;. :�❑ :: .., g>! Other: .,. .. .... .... : - : , ., ... ...., ... Worst -case depressurization performance Outdoor temperatureLLJ F CAZ pressure BPI depressurization limit (Pa wn outside) Measured net CAZ depressurization (Pa wrt outside) OK (less negative) ( Caution (more negative) BPI maximum limit (second Measured spillage duration (second: Pass = duration not exceeding limit Draft pressure BPI limit (Pa YM CA2 Measured (Pa wn CA2 Pass = pressure more negative than limit CO concentration In undiluted flue gas BPI maximum limit (ppm Measured CO (ppm Pass = CO level not exceeding limit Caution = CO level 25 to 100 ppm :❑ OK ¢,Q. Caullon ;❑; OK ;,[(ai Caution❑�: OK :,.(,. Cauton >r 60 60 60 IN !.[Pass>QFair] . Pass�`0 Fail :❑ Pass �,]; Fail `(] Pass .p 1,` Fail ❑ Pass Fail ❑.:: Pass uQ Fail 100 s 100 100 +❑: Pass]'" Fall's N Pass ,.Fau :(]. Pass �] Fall ;! ; Caution e [a` Caution a 'I Caullon Resident al Mechanical Design Submittal V20140101 Page 5 w-MRM 5 . UP 4.0%. , MI' System Controls Operating Per Design Intent Local exhaust (all fans) El '❑I NIA �i. 3 Pass MDR Fall Whole -house ventilation 01 NIA Pass Fall Sub -structural floor exhaust 0. N/A Pass Fall Heating (all systems) NIA Pass % Fall Cooling (all systems) NIA Passe KUM Fall Residential Mechanical Design Submittal V20140101 Testing tech (Initials)EII Testing Notes Page 6 u -:& �D,3b3c=� City of Fort Collins Residential Mechanical Systems Performance Report This form is a record of testing targets and results, with Pass/Fall outcomes. For Information on measurement tools and testing techniques, see the 'Residential New Construction Mechanical Systems Testing Guide.' The guide and this form may be periodically updated; check the Building Services web site for the current version. This form must be completed and signed by an "Approved Agency; and submitted to Building Services as a requirement for receiving a C.O. Color key ADCF = Air Density Correction Factor, based on tool, ADCF altitude (5000'), air temperature through tool Volumetric flow (CFM 5000) = ADCF x Indicated flow (CFM) • p • - S oY A- 14 Address 2138 Yearling Dr Date of "Residential Mechanical Systems Builder D-R Horton Design Submittal' Information referenced HVAC contractor Our Seasons Heating • by testing technicians `.� Measured valuer Taryeti limit towmparewith Pass F i> E C4,61W Other qr target or Ilmit F=hi data As -built changes meth design submit Testing date(s) Monday 04/06/2015 Bath exhaust Testing tech (initials) R.S. Flow Flow box Pilot tube duct traverse Air temp 73., ADCF 1.098 -3 tool — Passive flow hood — Other (note below) through tool (F) Afr<,aw Minimum Airflow Requirement Indicated Volumetric Exhaust Pickup Location (CFM (CFM 5000') Flow Flow Pass Fail 5000' +Typo of Operation (CFM) (CFM 5000') Master Bath 50 ' 78 86 WIC ' 50 �[501tIermlUo�t 20ContlnuoV's'75 82 Bath: #2 50 Lpinter' miga�{ 20Conttnuo`s.69 76 ,Gd,�© Laundry 50 �50lnter{nl0ent 20Continuous 76 83 ' ' '. 50interr(illtent20 Contiquous: [].�,.^©a ' SO Interiniiienl ' 20 Conbn4ous �' sr r` _. 7..i"l'•,.ri65 Testing notes Kitchen exhaust WA- hood does not vent to outside Testing tech (Initials) R.S Oven fuel —Gas —Electric Minimum airflow requirement (CFM 5000') + operatlon i 100 Intor(iiiltont "25..`ContlnVous Measured airflow FlowboxPilot Tube traverse l Exhaust duct :. hr temp Flow — — Tool — - Passive flow hood Flow grid . Exhaust duct � � ' through ADCF tool —' — location - - Powered flow hood —Other (note below) (Ect•da,terminauonnot oK) tool (F) rrs indicated flow, CFM Volumetde now CFM 5000, q Pass [ Fall -`i Testing .... .. .. F notes ., Residential Mechanical Design Submittal V20140101 Page 1 Cod `minimum ventilation elr0ow CFM 5000' Design ventilation CFM 5000' based on CFA and # of BR alrflow Target ventilation airflow range ��? to ; y CFM 5000' V;(codeminimum) (120.b;ot4e;lge Testing tech (Initlals) R.5 Exhaust -only System __Supply -only type Balanced - Measured Airflow AlrTemp Indicated Volumetric Measurement Method ToolLocatlon Through ADCF Flow Flow Pass Fall Tool (F) (CFM) (CFM 5000') Total N/A Passive gory hood � � � . I exhaust _ _ Flow box _ Pilot tuba traverse airflow Flow collar Other (note below) — _ Total _ WA Passive flow hood supply _ — Flow box — Pilot tube traverse ❑ , t� airflow Flow collar Other (note below) — —r. , When supplyalrflow Is circulated by air handier fan, fan speed for measurement Healing Cooling Continuous tan Balanced airflow In balanced systems Average of measured CFM supply + exhaust flours 5000' Target flow range CFM (average+(_15%) "to �',;'6000, Sub -structural floor exhaust 10 NIA —no sub -structural floor exhaust system Testing tech (inillals)� Design exhaust airflow (based on CFM SOOD' Target airflow limits } .: approved design)�(design +I-15%) CFM 5000' Measured airflow s Flow — Flow box —Pilot tube traverse 7001 Air lam Passive flow hood Flow collarE through ADCF '? tool — — IocaRon g s _:Powered flow hood — Other (note below) too) (F)❑ '? Indicated Row ` CFM Volumetric flow CFM 5000' [], Pass Fall t_ Testing ' notes . F NIA — No ductwork resting notes ✓ No ductwork outside conditioned space (ind multiple ays) Duct leakage —Testing tech data source — Energy rater House conditioned sf AlrtemP� ADCF lbasemfloor (mdu4a fu116asement) t) through to {F) Maximum Allowed Duct Leakage Measured Duct Leakage Test Parameter and Conditions Normalized (CFM255000'1100 at) Absolute (CFM255000') Indicated (CFM25) Volumetric (CFM255000') System #1 System #2 Leakage Typo Timing Air Handler Pass Fall Pass Fall Total leakage Rough -In Excluded. 4 ._ !. - "'- k ' r. s Total leakage Rough -In Included 8 c4 [� ti��p f. ❑ , 6 uQ„ �. , Total leakage Complete IncludedLeakage 12 [t,to On Complete Included8 M. outdoors Residential Mechanical Design Submittal V20140101 Page 2 For multiple systems, attach one page per system System #F2 —] Which parts of house does It serve? Upper Floor .Installed equipment (Be clear about which AC components are Installed at time of testing) Testing tech (Initials) FS Manufacturer Model If Furnace or Better AC or Heat Pump Condenser AC or Heat Pump Coll Bryant Carrier Bryant 912SC48060S17A CNPVP3017A LAAAAA I Filter Basic fiberglass %_Electrostatic Thickness MERV Type Basic pleated —Other. 2' brand High-effic pleated (I (optional) F1 E Static pressures Set p _✓ Cooling Cont. fan H formull)-stageequipment v BlowerApqed tap: LO Humldlfler damper., ✓-NIA —Open (Heating) Closed (Cooling) ✓ All registers open. Zone dampers open SPI AP Filter (SPI - SP2) SP2 66 Testing tech (Initlals)FR.—S� forma tor lW SP4 for NSOP, \MTFSOP) AP CoIIF3,-7 (SI`4) SP3 1 76. Cooling: Measured air flow through Indoor coil ❑ N/A -- no AD Installed Testing tech (InItIals)FR.—S —1 Design cooling airflow 1003 CFM 5000' Target alrflowllmlts853 CFM 5000'lase) (design +1 RMeasured airflow Flow gdd PI 4 2.20 Air temp ou( g thr lh 739, tool (F)E] ADCF NSOPE TFSOP FlowResIstance Correction Factor Measured airflow, no Indicated airflow Volumetric airflow F5000 CFM adjustment/correction 101� CFM CFM 52 It! Fin I MeasufedAFxFRCF Inc9catd AF Y ADCF Testingl notes Heating: Gas manifold pressure (high stage) Testing tech (Initials) —S Manifold pressure -."iln I OEM Spec @ 5000' limits (Spec +1- 5Iwo % Target manifold P AN ) IWC Measured Pass 3.5 IWC pressure i Fall Heating: Temperature rise Testing tech (Initlals)IR.S I OEM temperature rise limits F (hlgh stage) Measured temps (F): Supply 132' Return 740 W7 F Temp El Rl Pass �w Fall Caution: Wthin 10F air air rise ... V—� 1, of top of range Residential Mechanical Design Submittal V20140101 Page 3