Loading...
HomeMy WebLinkAboutCorbett Dr - Minor Amendment/ Misc - 09/19/1988V RMINC Engineering Consultants 2900 South College Avenue Fort Collins, Colorado 80525 303/226-4955 September 19, 1988 Ms. Susan Hayes City of Fort Collins Storm Water Utility P.O. Box 580 Fort Collins, CO 80522 Re: Addendum to "Final Drainage Report For the Charter Hospital of'Fort Collins", Revised July 6, 1988 Dear Ms. Hayes: The purpose of this letter is to document the impact some minor sub -basin changes have on the original drainage report. The enclosed sketches show the changes to the sub -basin caused by using splash blocks on the north side of the building versus an internal collection system. Sub -basin A will increase by 0.23 acres to a total of 3.27 acres. Upon reviewing our earlier report we discovered that Sub -basin A calculations had been based upon an area of 3.51 acres. Therefore, the original results are still conservative and were not changed at this time. The total site area that drains into the detention pond has not changed. Some of the runoff takes'a slightly different route. If you have any questions on this information please contact u 5 . .u111111111111u,.. Sin el �� `oo° __°° �� 4� � o 047 Ted A. Borst5&_M�- enc: as noted Other Offices: Vail, Colorado 303/476-6340 • Colorado Springs, Colorado 303/574-3504