Loading...
HomeMy WebLinkAbout2333 Dolan St - Special Inspections/Engineering - 06/06/2005Fou ndation VMM •�' /Waterproofing Inspection CLIENT: Ryland Homes 8100 E. Maplewood Ave. Ste. 100 Greenwood Village, CO 80111 Attn: Mr. Bob Shearer Foundation Plan BY hm /q voe fp,6k PLAN NO Foundation Type . SPREAD FOOTINGS ❑ GRADE BEAMS AND PADS ❑ DRILLED FRICTION PIERS ❑ DRILLED PIERS INTO BEDROCK ❑ FOOTING W/MINIMUM ❑ OTHER DEADLOAD L nn CTL/THOMPSON JOB NO. - k5J DATED Foundation Vb0d ❑ REQUIRED THICKNESS ❑ MEASURED THICKNESS Foundation Wall Condition ❑ EXPOSED STEEL ❑ SURFACE PROBLEMS (HONEYCOMBING, ETC.) (IF CHECKED, SHOW LOCATION ON SKETCH) ❑ EXTERIOR ❑ INTERIOR FIG. INCHES INCHES INSTALLED PIPE DIAMETER INCHES WALL HEIGHT INCHES DEPTH -TOP OF WALL TO BOTTOM OF TRENCH INCHES ❑ SLAB ON GRADE ❑ STRUCTURAL FLOOR ❑ PIPE INSTALLED ❑ GRAVEL INSTALLED, GRAVEL SIZE Type of Outlet ❑ GRAVITY, BELOW SEWER ❑ SUMP PIT ❑ UNDERDRAIN SERVICE CONNECTION VISIBLE (AT STUB) ❑ IN GENERAL CONFORMANCE WITH RECOMMENDATIONS ❑ REJECTED IN GENERAL CONFORMANCE WITH RECOMMENDATIONS ❑ REJECTED Foundation Waterproofing: IN GENERAL CONFORMANCE WITH RECOMMENDATIONS ❑ REJECTED MANUFACTURER HEIGHT _ FEET DISTANCE BELOW FOUNDATION WALL FEET TLITHOMPSON ADDRESS: l,✓e �c 0 LOT / / BLOCK FILING NO. JOB NO. /_ CD/ng s? r Foundation Wall Layout I � 4 3 p { 1 4 too n 's RECOMMENDED CORRECTIVE PROCEDURE FIELD REPRESENTATI E ;� D• �;• O� goy . P REVIEWED BY •1 . 36 DATE OF INSPECTION gyp; ••....• fir\ /