Loading...
HomeMy WebLinkAbout2708 County Fair Ln - Special Inspections/Engineering - 09/15/2005Excavation/Pier Inspection CLIENT: Standard Pacific Homes Recommended Foundation System CTLrTHOMPSON JOB NO. DATED i"- (S- DRILLED FRICTION PIERS MAXIMUM ALLOWABLE END PRESSURE OF PSF. ALLOWABLE SKIN FRICTION OF PSF. MINIMUM DEADLOAD PRESSURE OF PSF. PROVIDE A INCH VOID BENEATH GRADE BEAMS. MINIMUM LENGTH FEET DRILLED PIERS INTO BEDROCK MAXIMUM ALLOWABLE END PRESSURE OF ZC ooa PSF. ALLOWABLE SKIN FRICTION OF Z oo w PSF. MINIMUM DEADLOAD PRESSURE OF �p - Ga v PSF. �� PROVIDE A (d INCH VOID BENEATH GRADE BEAMS. BEDROCK PENETRATION I* FEET MINIMUM LENGTH 23 C 30 Z_ $ C IVJI FEET Foundation Plan BY C.e h ia<`iS O Gy PLAN NO. M 13 2 DATE PIER DIAMETER - l 2 INCHES WALL PIER PENETRATION Z FEET COLUMN PIER PENETRATION 1 Z FEET MINIMUM LENGTH Z 5 C 8 D Lp FEET Reinforcement "J NO. (0 GRADE Gy BARS Soil Conditions Observed SOILS IN EXCAVATION: G( e" I-, 'Ann -,- SOILS IN PIERS:__ Ground Water Conditions NONE IN EXCAVATION NONE ENCOUNTERED IN BORING NO. !h1_-__" TO / FEET ENCOUNTERED AT - _- FEET IN BORING NO. Remarks: -- ru CYLITNOMPSON ADDRESS: Z70 A LOT 2/ BLOCK FILING NO. JOB NO. 07---- o ( Z Foundation Layout !' IH I S f INDICATES PIER INSPECTED DRILLING COMPANY :rwd e-A LOWER LEVEL UPPER LEVEL PIER NO. (SEE REVERSE SIDE) instructions to Contractor PIERS INSTALLED IN GENERAL CONFORMANCE WITH PLANS PIER INSTALLED NOT APPROVED FIELD REPRESENTATIVE REVIEWED BY I_ i _oA4 DATE OF INS ECTION oPPpO RE�&'