Loading...
HomeMy WebLinkAbout3239 Snowbrush Pl - Inspection Results - 05/30/2001Building and Zoning Department 281 N. College Ave. Fort Collins, CO 80524 970/221-6760 Ciiy of Fort Collins INSPECTION OF RADON MITIGATION SYSTEM IN NEW CONSTRUCTION HIRED BY n INSPECTOR . ADDRESS OF ADIDRESS- /?y Og- Z- -7ivi% CITY iT C.V�-r.vs STATE __ Go 71P 6?05Z� Codes: Pass = ✓ Fail = O Not aDDlicable =NA INSPECTION #1 TYPE OF FOUNDATION _cra I space sement slab on grade TYPE OF SYSTEM BEING INSTALLED Passive sub -membrane system ive sub -membrane system Passive system - sub slab _Active system - sub slab _combined radon system ONENTS - sub slab/ basement :74inches aggregate or perforated pipe or collection mat _diffusion retarder (not required where sealing has occurred) _1,!�'tee fitting perforated vent pipes (min. 10 ft.) INSPECTIONS #2 and #3 SYSTEM APPROVED: _YES NO is - 3v cs t DATE Comments - CONENTS _Sealing of openings, penetrations, joints orated floor vent pipe �4" PVC radon vent pipe diffusion retarder membrane mbrane sealed to wall 8 fixtures PVC pipe sealed at all penetrations 8 connections ewall sleeves installed tem labeled inside and outside System accessible for repair or stallation of fan -16 trical connections for fan termination of system meets andard corrosion resistant screen at end of discharge pipe (% to'/ openings) _fan properly installed outside living space _Manometer or other US EPA approved monitoring device installed Make-up air vents CERTIFICATION;_ l,_the-undersigned Inspector;_ certify that to tho best of my knowledge and professsional_ability. I have inspected the above -described radon mitigation system and have found it to be installed in accordance with the building standards set forth in Section 1210 of the Building Code of the City of Fort Collins, unless otherwise specifically noted above. This certification does not extend to any conditions resulting from subsequent acts or omissions of the building contractor, owner, or other persons in connection with the installation, operation, or maintenance of such radon mitigation system. SIGNATURE OF INSPECTOR DATE 07 White - Building Inspection Yellow - Inspector Pink - Customer Gold - Natural Resources