Loading...
HomeMy WebLinkAbout3221 Reedgrass Ct - Correspondence - 09/20/1999SCOTT, COX & ASSOCIATES, INC. consulting engineers (J144r) September 30, 1999 Project No. 1197-38-02-02 Shepardson Homes P.O. Box 68 Windsor, Colorado 80550 Gentlemen: On September 16, 1999, a representative of Scott, Cox & Associates, Inc. conducted visual spot observations of the drilling and installation of the ten (10) inch diameter piers for the new residence under construction at Lot 31, The Ponds Subdivision, (3221 Reed Grass Court), a subdivision of Fort Collins, Colorado. The purpose of these observations was to assure that the piers were drilled correctly for the subsurface conditions encountered and to assure that the piers were constructed according to the specifications on the foundation plan by Foundation Engineering, Project No. 1197-38-02-01. The pier drilling operations encountered claystone bedrock at depths of (0) feet below the base of various excavation levels. The piers were drilled a total minimum length of sixteen (16) feet with a minimum bedrock embedment of seven (7) feet, whichever was greater. Groundwater levels were encountered in the borings. Casing of the borings was not required. Concrete was being placed with a concrete pumper. Reinforcing steel was being installed in each pier. As a result of our observations, it is our opinion that the construction of those piers observed were in general conformance with the plans and specifications. If you have an our observations or this report, feel free to contact our office. Sincerely, IReviewed b e Eriz M. Edward Gl s w, P.E. gineering Technician SCOTT, COX & ASSOCIATES, 5110 Granite Street, Suite D • Loveland , Colorado 80538 • (970) 663-0138 • Fax: (970) 663-1660 Serving Colorado with offices in • Boulder • Longmont • Loveland