Loading...
HomeMy WebLinkAbout3051 Sage Creek Rd - Correspondence - 06/01/2001 (21)� 1 1 ENGINEER'S FIELD REPORT Report Date: June 1, 2001 Report No. 2 Project James Company Sage Creek Townhomes Location: 3051 Sage Creek Road, Lots 7-12, Bldg B, Fort Collins, Colorado - Architect: J. W. Miller Associates, Longmont, Colorado Contactor James Company, Boulder, Colorado (Scott Holmes) Subject: Concrete Foundation Walls Date January 12, 2000 (12:00 pm) Weather: Seasonal OBSERVATIONS In general, the size, type cord placement of the reinforcing steel are consistent with the structural requirements outlined in the foundation plan prepared by this office. The horizontal reinforcement consists of No. 4, Grade 60 steel, while the vertical reinforcement was No. 4, Grade 60 reinforcing bar. All observed steel reinforcement was tied together properly, with laps at splices and corner bars being 24 inches minimum in length. FIELD INSTRUCTIONS GIVEN ,None. T. f�rS'o E. orva- cc: PLAZA ENGINEERING CONSULTANTS, INC. P O. Box 1002 Loveland, CO 80539-1002 (970)-663-6353 (970) 663-0368 Fax