September 16, 2014
Meritage Homes of Colorado Inc.
6892 South Yosemite Court, Suite 1-201,
Centennial, Colorado 80112
Attention: Mr. Michael Bird
Subject: Soil and Foundation Study
Proposed Residential Structure
Lot 3, Block 6
Mail Creek Crossing
Fort Collins, Colorado
Project Number 143623
Purpose
As requested, we have performed a soil and foundation study at the subject site. The purpose of our
study was to observe subsurface conditions encountered and to recommend geotechnical design
criteria for the design and construction of the foundation for the proposed residence. This letter
presents a summary of our findings and recommendations.
Subsurface Conditions
The field exploration included drilling a 4-inch diameter auger boring near the center of the lot to a
depth of approximately 20 feet. The subsurface materials encountered consisted of:
0' to 5'
5' to 12'
12' to 20'
Date of drilling:
Depth to water:
Laboratory Testing
Fill, clay, erratic moisture and stiffness, silty, sandy, mottled brown to dark brown
Clay, medium stiff, silty, sandy, slightly moist to moist, brown to reddish brown
Clay, stiff, silty, sandy, moist to very moist, rust to brown to gray to olive
August 13, 2014
Dry at the time of drilling
19'/ feet 2 days after drilling
Samples obtained during drilling were returned to the laboratory. They were visually classified and
testing was assigned to selected samples in an effort to evaluate the engineering properties of the
subsurface materials encountered. Site specific laboratory swell/consolidation tests exhibited no to low
measured swell (0.2% at a depth of 4 feet and 0.0% at a depth of 9 feet) upon an increase in moisture
content under a load of 1,000 pounds per square foot (psf). Based upon visual observation of the
Meritage Homes of Colorado, Inc.
Project Number 143623
September 16, 2014
Page 2
subsurface conditions encountered and laboratory testing for this and/or adjacent lots, it is our opinion
that the subsurface materials generally exhibit low potential for expansion and moderate potential for
compression. Refer to the Colorado Geological Survey Special Publication 43 for a description of
expansive soils and their impact on structure performance.
Site Preparation for Foundation Construction
It is possible that after excavation for the basement foundation system, soft, rutting, unstable soils will
be encountered which will not be suitable for support of the proposed construction.
If soft, rutting soils become a problem, stabilization with rockfill may be necessary. Site preparation for
the foundation system for the proposed structure may be accomplished by excavating the site to 1 or
2 feet below the proposed bottom of footing a distance of at least 2 feet beyond the edge of the footing.
Our office should be retained to observe a proof -roll of the foundation system subgrade to determine
if stabilization will be required. The soft, rutting soils should then be stabilized by placing 6-inch minus
crushed rock or an equivalent material, which should be evaluated by our office prior to use. Crushed
concrete should not be used. The material should be placed in approximately 8-inch loose lifts and
rolled into the underlying soft or loose soils. This procedure should be observed by a representative
of our firm and should continue until a front-end loader with loaded bucket, or equivalent, can be
supported on the rock fill with no significant deformation. Subsequent gravel layers should be placed
accordingly until foundation elevation has been obtained. A representative of our firm should verify
stabilization by observing a proof -roll prior to forming footings.
Foundation Recommendations
Based on our evaluation of the subsurface conditions, the proposed residence may be founded upon
spread or pad -type footings bearing below any existing fill on the natural undisturbed soils or on
properly placed and compacted fill. The footings should be designed for a maximum bearing pressure
of 1,200 psf. Footing dimensions and foundation structural elements should be determined by a
structural engineer. Concrete in contact with the subsurface materials may be designed for
negligible (SO) sulfate exposure as defined by ACI 318.4.3. Bearing materials loosened by machine
excavation should be removed prior to placing footing concrete. Occasionally, pockets of loose soils
are encountered in foundation excavations. If this condition occurs, the footings should extend to firm
soils. Exterior footings should bear at least 3 feet below exterior grade for frost protection. The bearing
materials beneath footings should be protected from freezing during construction. All footing
excavations should be observed prior to placement of concrete to confirm the footings are bearing on
suitable materials as anticipated for design purposes.
The foundation walls backfilled with on -site materials should be designed for a lateral earth pressure
based upon an equivalent fluid density of 65 pounds per cubic foot (pcf) for the "at rest" condition or
50 pcf for the "active" condition. The "active" condition should only be used where wall movements of
at least 0.5% of the wall height are allowed. These values have been provided without considerations
for sloping backfill, surcharge loading or hydrostatic pressures. Construction of a drain system and
proper surface drainage as discussed later in this report may lower the potential of developing
hydrostatic pressure in the backfill materials. Minor cracking of concrete foundation walls should be
expected.
Meritage Homes of Colorado, Inc.
Project Number 143623
September 16, 2014
Page 3
Basement Floor Construction
A basement slab performance risk evaluation was conducted in general conformance with industry
guidelines for the local area. The risk assessment of a site for potential movement is not absolute;
rather, it represents a judgment based upon the data available and our experience in the area.
Movement of foundations and concrete flat work will occur with time in low to very high risk areas as
the soil moisture content increases. On low and moderate rated sites, slab movements of up to
3 inches or more across the slab with slab cracking of up to %-inch or more in width and/or differential
are considered normal. The damage generally increases as the risk assessment increases and as the
depth of wetting increases. It must be understood, however, that assessing risk is an opinion. There
is currently no type of testing or correlation of factors that will definitively predict the amount of heave
that a floor slab will exhibit. Therefore, it may be possible that heaves less than or in excess of what
is considered "normal" may be experienced.
For sites with a risk assessment of high or very high, we recommend an interior floor system
engineered for expansive soils be constructed. An alternative to the use of an engineered floor system,
such as soil modification to reduce the risk assessment, may also be considered. In addition, an
engineered interior floor system is recommended for all finished areas or any other areas where floor
movements cannot be tolerated.
Based upon our evaluation of the subsurface conditions at this site, it is our opinion that the slab
performance risk for this site is low. If this risk of movement is not acceptable, engineered interior
floors should be constructed or an alternative such as soil modification should be considered.
If the Builder and/or Owner desires to construct a concrete slab -on -grade and accepts the risk of slab
movement, slabs supported by the expansive subsurface materials should be constructed using the
following criteria:
Slabs should be separated from exterior walls and interior bearing members with a
joint which allows free vertical movement of the slab.
2. Slab bearing partitions should be constructed with a minimum 2-inch void space.
Stairways bearing upon the slab should be constructed in such a way as to allow at
least 2 inches of slab heave. In the event of slab heave, the movement should not
be transmitted directly through the partitions to the remainder of the residence.
3. Plumbing and utilities should be isolated from the slab.
4. Where a forced -air heating system is used and the furnace is located on the slab, we
recommend provision for a collapsible connection between the furnace and the duct
work to allow for at least 3 inches of slab heave. Utility connections should also be
provided with flexible connections capable of accommodating the same magnitude
of movement as specified above.
Provide frequent control joints in the slab.
Meritage Homes of Colorado, Inc.
Project Number 143623
September 16, 2014
Page 4
Following these recommendations should reduce damage caused by movement of the floor slab;
however, the void spaces recommended are not intended to predict total slab movement. Care should
be taken to monitor and reestablish partition voids and flexible connections when necessary. We are
available to provide further consultation regarding basement slab performance risk assessments.
Crawl Space Construction
The crawl space ground surface should be sloped to the perimeter drain system. Trenching or dishing
out of the crawl space is not recommended unless a drain system is placed in these areas in such a
manner to facilitate drainage. The recommended clearance from the crawl space ground surface to
the engineered floor system should meet applicable codes. In addition, all plumbing lines should be
isolated from the ground surface or foundation walls by at least 2 inches.
During construction, the crawl space area should be checked for standing water or very moist
conditions, construction debris, and other deleterious materials. If these conditions exist, the area
should be evaluated and mitigated, as necessary.
Crawl space areas should be constructed with consideration given to proper ventilation and moisture
management. Provisions such as the installation of a vapor retarder should be utilized to reduce the
amount of moisture (humidity) in the crawl space air. The Client and any future Owner should be aware
that crawl space areas are subject to various air quality issues. A consultant specializing in ventilation
and air quality control should be contacted to provide any additional recommendations. Such
recommendations are beyond the geotechnical scope of this study. The environmental division of
A. G. Wassenaar, Inc. is capable of providing such services. Refer to Homeowners Guide To
Moisture Management" by Tri-County Health Department (Brochure Number S-323) for additional
information.
Subsurface Drainage
As a minimum, we recommend providing a subsurface drainage system around the lowest below grade
area. The purpose of the drain is to collect water which may become trapped on the surface of the
excavation and enter the basement or crawl space areas. A drain should be constructed similar to the
attached drain detail (Figure 1) and should be uniformly sloped to a positive gravity discharge or sump.
If a sump pit is installed, it should be monitored for water accumulation and proper operation. The
water level in the sump pit should not be allowed to rise above the bottom of the drain inlet pipe(s). If
this occurs, a pump should be installed (if not originally equipped) or maintenance should be performed
on the existing pump.
Surface Drainage
The wetting of foundation soils and/or bedrock materials may be reduced by carefully planned and
maintained surface drainage. The following recommendations should be implemented during
construction and maintained by the Homeowner after the residence is completed:
Meritage Homes of Colorado, Inc.
Project Number 143623
September 16, 2014
Page 5
Excessive wetting or drying of the open foundation excavation should be avoided as
much as practical during construction.
2. The ground surface surrounding the exterior of the foundation should be maintained
in such a manner as to provide for positive surface drainage away from the
foundation. At completion of construction, we recommend a minimum fall away from
the foundation of 6 inches in the first 5 feet. This slope should be continuous across
the backfill zone.
3. Backfill around the foundation should be moistened and compacted in such a
manner as to reduce future settlement. Areas which settle should be filled as soon
as possible in order to maintain positive drainage away from the foundation.
4. If lawn edging is used around the exterior of the foundation, it should be constructed
in a manner to prevent ponding of surface water in the vicinity of the backfill soils.
5. Drainage swales should be constructed and maintained a minimum of 5 feet away
from the foundation on side yards and 15 feet away from the foundation on back and
front yards. Natural drainage swales should maintain a slope of at least 2% off of the
lot. Swales must not be blocked by fences, landscaping, paths or other Homeowner
installed items.
6. Roof downspouts and drains should discharge well beyond the limits of foundation
backfill.
7. Watering adjacent to the foundation should be reduced as much as practical.
Landscaping which requires excessive watering should not be located within 5 feet
of foundation walls. Sprinkler lines, zone control boxes, and drains should be
located outside the limits of the foundation backfill. Sprinkler heads should be
positioned such that the spray does not fall within 5 feet of foundation walls.
8. Plastic membranes should not be used to cover the ground surface immediately
surrounding the foundation. These membranes tend to trap moisture and prevent
normal evaporation from occurring. We recommend the use of a weed suppressant
geotextile fabric.
Limitations
We believe the professional judgments expressed in this report are consistent with that degree of skill
and care ordinarily exercised by practicing design professionals performing similar design services in
the same locality, at the same time, at the same site and under the same or similar circumstances and
conditions. No other warranty, express or implied, is made. The location of the test boring drilled and
the laboratory testing performed for this study were designed to obtain a reasonably accurate picture
of subsurface conditions for design purposes. Variations in subsurface conditions not indicated by the
boring are possible and expected. Therefore, we should be retained to observe the foundation
Meritage Homes of Colorado, Inc.
Project Number 143623
September 16, 2014
Page 6
excavation and construction in order to verify or revise our recommendations. If unexpected
subsurface conditions are observed by others during construction, we should be called to review our
recommendations.
This report was prepared for the exclusive use of our Client for the sole purpose of providing
geotechnical design criteria for the subject structure based upon the existing site conditions as
encountered. The conclusions and recommendations contained in this report shall not be considered
valid for use by Others without written authorization from A. G. Wassenaar, Inc. In addition, the state
of practice in geotechnical engineering is constantly evolving. Therefore, findings presented in this
report should be reviewed and revised, if necessary, prior to actual construction.
If we can be of further service in discussing the contents of this letter or in analysis of the proposed
structure from the soil and foundation viewpoint, please call our office.
Sincerely,'
A. G. WAS ENAAR, I1;
r"'€oa
Michael R. Conner,
Senior Engineer:�<•f=���..a
�LJ,` py, ammo• ^ ^°®�;��'J�.
Reviewed by:
onald L. Taylor Jr., E.
Presi
M RC/D LT/sa r
Attachment: Figure 1
Statement of Services
A.G. Wassenaar
Geotechnical and Environmental Consultants so
NOTES:
1. DRAIN MUST SLOPE TO A POSITIVE
GRAVITY OUTLET AND/OR TO SUMP
WHERE WATER CAN BE REMOVED
BY PUMPING
2. SLOPE BOTTOM OF TRENCH AND PIPE AT A
MINIMUM OF 1/8" PER FOOT (i.e. 1%)
OR AS APPROVED BY THE GEOTECHNICAL ENGINEER
3. 4-INCH DIAMETER RIGID PERFORATED PVC
PIPE (ASTM D2729 MINIMUM SCHEDULE 20), OR
SUBSTITUTE APPROVED BY GEOTECHNICAL ENGINEER
4. GRAVEL SPECIFICATION: 2" MINUS WASHED
ROCKIGRAVEL, POORLY GRADED WITH NO MORE
THAN 30% PASSING THE 3/8" SIEVE AND NO
MORE THAN 10% PASSING THE #4 SIEVE, OR AS
APPROVED BY THE GEOTECHNICAL ENGINEER
SLIP
JOINT
CONCRETE SLAB ON GRADE
BACKFILL
DO NOT EXCAVATE WITHIN A 1:1 LINE
EXTENDING DOWN AND AWAY FROM
EDGE OF FOOTING. MAINTAIN THIS ANGLE
OF EXCAVATION TO A DEPTH OF TWICE THE
FOOTING WIDTH.
1NDATION MINIMUM 10 MIL POLYETHYLENE BARRIER OR
WALL EQUIVALENT APPROVED BY GEOTECHNICAL
ENGINEER. ATTACH TO WALL AFTER
DAMPPROOFING AND EXTEND AT LEAST 1
FOOT UP ON WALL AND BENEATH FLOW LINE
OF PIPE.
BACKFILL
NON -WOVEN GEOTEXTILE FILTER
FABRIC (MIRAFI 140N OR EQUIVALENT
APPROVED BY GEOTECHNICAL
ENGINEER) PLACED ACROSS ENTIRE
WIDTH OF DRAIN GRAVEL.
DRAIN GRAVEL (SEE NOTE #4) GRAVEL
SHOULD FILL ENTIRE TRENCH AND EXTEND
LATERALLY TO TOP OF FOOTING. GRAVEL
COVER ABOVE PIPE SHOULD BE AT LEAST 4"
o;;p;: ;o; : Q;;:a;^•.:: .
.' "•,'�V
o•' '
EXTEND POLYETHYLENE TO OUTSIDE
EDGE OF BOTTOM OF TRENCH.
\
DRAIN PIPE - (SEE NOTES #2 & 3)
8"
AT LOCATION OF HIGH POINT,
_
_ \
MINIMUM
ESTABLISH BOTTOM OF DRAIN
PIPE AT LEAST 4" BELOW
BOTTOM OF FOOTING OR PAD
FOOTING FOUNDATION
TYPICAL EXTERIOR DRAIN DETAIL
SEPTEMBER 2007
F3EXT- FIGURE 1
00