Loading...
HomeMy WebLinkAbout2332 Spruce Creek Dr - Special Inspections/Engineering - 08/21/2014A.G. Wassenaar S Cle-cok. Lr- 2180 South Ivanhoe Street, Suite 5 Denver, Colorado 80222-5710 Geotechnical and Environmental Consultants Meritage Homes of Colorado, Inc. 6892 South Yosemite Court, Suite 1-201 Centennial, Colorado 80112 Attention: Mr. Michael Bird Subject: Soil and Foundation Study Proposed Residential Structure Lot 11, Block 7 Mail Creek Crossing Fort Collins, Colorado Project Number 143634 Purpose 303-759-8100 Fax 303-756-2920 www.agwassenaar.com August 21; -2014,. �. •�� ._ =7 1' All As requested, we have performed a soil and foundation study at the subject site. The purpose of our study was to observe subsurface conditions encountered and to recommend geotechnical design criteria for the design and construction of the foundation for the proposed residence. This letter presents a summary of our findings and recommendations. Subsurface Conditions The field exploration included drilling a 4-inch diameter auger boring near the center of the lot, 1 foot below the proposed overlot grade elevation, to a depth of approximately 20 feet. The subsurface materials encountered consisted of: 0' to 5' Clay, stiff, silty, sandy, slightly calcareous, moist, brown to olive 5' to 17' Clay, medium stiff, silty, very sandy, with sand lenses, moist to very moist, brown to reddish brown 17' to 20' Clay, stiff, silty, slightly sandy, moist, light brown to gray to olive Date of drilling: July 16, 2014 Depth to water: Dry at the time of drilling 16 feet 2 days after drilling Laboratory Testing Samples obtained during drilling were returned to the laboratory. They were visually classified and testing was assigned to selected samples in an effort to evaluate the engineering properties of the subsurface materials encountered. A site specific laboratory swell/consolidation test exhibited low measured swell (0.1 % at a depth of 4 feet) upon an increase in moisture content under a load of 1,000 pounds per square foot (psf). Based upon visual observation of the subsurface conditions encountered and laboratory testing for this and/or adjacent lots, it is our opinion that the subsurface materials generally exhibit low potential for expansion or moderate potential for compression. Refer to the Colorado Geological Survey Special Publication 43 for a description of expansive soils and their impact on structure performance Meritage Homes of Colorado, Inc. Project Number 143634 August 21, 2014 Page 2 Site Preparation for Foundation Construction It is possible that after excavation for the basement foundation system, soft, rutting, unstable soils will be encountered which will not be suitable for support of the proposed construction. If soft, rutting soils become a problem, stabilization with rockfill may be necessary. Site preparation for the foundation system for the proposed structure may be accomplished by excavating the site to 1 or 2 feet below the proposed bottom of footing a distance of at least 2 feet beyond the edge of the footing. Our office should be retained to observe a proof -roll of the foundation system subgrade to determine if stabilization will be required. The soft, rutting soils should then be stabilized by placing 6-inch minus crushed rock or an equivalent material, which should be evaluated by our office prior to use. Crushed concrete should not be used. The material should be placed in approximately 8-inch loose lifts and rolled into the underlying soft or loose soils. This procedure should be observed by a representative of our firm and should continue until a front-end loader with loaded bucket, or equivalent, can be supported on the rock fill with no significant deformation. Subsequent gravel layers should be placed accordingly until foundation elevation has been obtained. A representative of our firm should verify stabilization by observing a proof -roll prior to forming footings. Foundation Recommendations Based on our evaluation of the subsurface conditions, the proposed residence may be founded upon spread or pad -type footings bearing below any existing fill on the natural undisturbed soils or on properly placed and compacted fill. The footings should be designed for a maximum bearing pressure of 1,200 psf. Footing dimensions and foundation structural elements should be determined by a structural engineer. Concrete in contact with the subsurface materials may be designed for negligible (SO) sulfate exposure as defined by ACI 318.4.3. Bearing materials loosened by machine excavation should be removed prior to placing footing concrete. Occasionally, pockets of loose soils are encountered in foundation excavations. If this condition occurs, the footings should extend to firm soils. .Exterior footings should bear at least 3 feet below exterior grade for frost protection. The bearing materials beneath footings should be protected from freezing during construction. All footing excavations should be observed prior to placement of concrete to confirm the footings are bearing on suitable materials as anticipated for design purposes. The foundation walls backfilled with on -site materials should be designed for a lateral earth pressure based upon an equivalent fluid density of 65 pounds per cubic foot (pcf) for the "at rest" condition or 50 pcf for the "active" condition. The "active" condition should only be used where wall movements of at least 0.5% of the wall height are allowed. These values have been provided without considerations for sloping backfill, surcharge loading or hydrostatic pressures. Construction of a drain system and proper surface drainage as discussed later in this report may lower the potential of developing hydrostatic pressure in the backfill materials. Minor cracking of concrete foundation walls should be expected. Basement Floor Construction A basement slab performance risk evaluation was conducted in general conformance with industry guidelines for the local area. The risk assessment of a site for potential movement is not absolute; rather, it represents a judgment based upon the data available and our experience in the area. Meritage Homes of Colorado, Inc. Project Number 143634 August 21, 2014 Page 3 Movement of foundations and concrete flat work will occur with time in low to very high risk areas as the soil moisture content increases. On low and moderate rated sites, slab movements of up to 3 inches or more across the slab with slab cracking of up to %-inch or more in width and/or differential are considered normal. The damage generally increases as the risk assessment increases and as the depth of wetting increases. It must be understood, however, that assessing risk is an opinion. There is currently no type of testing or correlation of factors that will definitively predict the amount of heave that a floor slab will exhibit. Therefore, it may be possible that heaves less than or in excess of what is considered "normal" may be experienced. For sites with a risk assessment of high or very high, we recommend an interior floor system engineered for expansive soils be constructed. An alternative to the use of an engineered floor system, such as soil modification to reduce the risk assessment, may also be considered. In addition, an engineered interior floor system is recommended for all finished areas or any other areas where floor movements cannot be tolerated. Based upon our evaluation of the subsurface conditions at this site, it is our opinion that the slab performance risk for this site is low. If this risk of movement is not acceptable, engineered interior floors should be constructed or an alternative such as soil modification should be considered.. If the Builder and/or Owner desires to construct a concrete slab -on -grade and accepts the risk of slab movement, slabs supported by the expansive subsurface materials should be constructed using the following criteria: 1. Slabs should be separated from exterior walls and interior bearing members with a joint which allows free vertical movement of the slab. 2. Slab bearing partitions should be constructed with a minimum 2-inch void space. Stairways bearing upon the slab should be constructed in such a way as to allow at least 2 inches of slab heave. In the event of slab heave, the movement should not be transmitted directly through the partitions to the remainder of the residence. 3. Plumbing and utilities should be isolated from the slab. 4. Where a forced -air heating system is used and the furnace is located on the slab, we recommend provision for a collapsible connection between the furnace and the duct work to allow for at least 3 inches of slab heave. Utility connections should also be provided with flexible connections capable of accommodating the same magnitude of movement as specified above. 5. Provide frequent control joints in the slab. Following these recommendations should reduce damage caused by movement of the floor slab; however, the void spaces recommended are not intended to predict total slab movement. Care should be taken to monitor and reestablish partition voids and flexible connections when necessary. We are available to provide further consultation regarding basement slab performance risk assessments. No Text No Text No Text No Text