HomeMy WebLinkAbout2002 Blue Yonder Way - Special Inspections/Engineering - 08/23/2013Zv d 2 fat
V • `�1Tassenaar 2180 South Ivanhoe Streit, Suito 5
Denver, Colorado 80222-5710
303-759-8100 Fax 303-756-2920
Geotechnical and Environmental Consultants www.agwassenaar.com
August 23, 2013
D R Horton
9555 South Kingston Court, Suite 200
Englewood, Colorado 80112-5943
Attention: Mr. Tim Karns
Subject: Soil and Foundation Study
Proposed Residential Structure
Lot 1, Block 5
Sidehill, Filing 2
Fort Collins, Colorado
Project Number 131315
Purpose
As requested, we have performed a soil and foundation study at the subject site. The purpose
of our study was to observe subsurface conditions encountered and to recommend geotechnical
design criteria for the design and construction of the foundation for the proposed residence.
Additionally, we reviewed partial "Construction Observation and Testing" reports (Earth
Engineering Consultants, LLC, Project Number 1124098, dated December 28, 2012 and May 1,
2013) as a portion of our analysis. This letter presents a summary of our findings and
recommendations.
Subsurface Conditions
The field exploration included drilling a 4-inch diameter auger boring near the center of the lot in
the upper level to a depth of approximately 24 feet. The subsurface materials encountered
consisted of:
0' to 13' Fill, clay, stiff, silty, sandy, with scattered gravel, moist, mottled brown
13' to 16'/z' Clay, soft, silty, very sandy, very moist, brown to reddish brown
16'/z' to 24' Sand and Gravel, dense, silty, slightly cobbly, very moist to wet, brown
Date of drilling: June 28, 2013
Depth to water: 17 feet at the time of drilling
17 feet 3 days after drilling
Laboratory Testing
Samples obtained during drilling were returned to the laboratory. They were visually classified
and testing was assigned to selected samples in an effort to evaluate the engineering properties
of the subsurface materials encountered. Site specific laboratory swell/consolidation tests
A.G. Wassenaar
Geotechnical and Environmental Consultants
NOTES:
1. DRAIN MUST SLOPE TO A POSITIVE
GRAVITY OUTLET AND/OR TO SUMP
WHERE WATER CAN BE REMOVED
BY PUMPING
2. SLOPE BOTTOM OF TRENCH AND PIPE AT A
MINIMUM OF 1/8" PER FOOT (i.e. 1 %)
OR AS APPROVED BY THE GEOTECHNICAL ENGINEER
3. 4-INCH DIAMETER RIGID PERFORATED PVC
PIPE (ASTM D2729 MINIMUM SCHEDULE 20), OR
SUBSTITUTE APPROVED BY GEOTECHNICAL ENGINEER
4. GRAVEL SPECIFICATION: 2" MINUS WASHED
ROCK/GRAVEL, POORLY GRADED WITH NO MORE
THAN 30% PASSING THE 3/8" SIEVE AND NO
MORE THAN 10% PASSING THE #4 SIEVE, OR AS
APPROVED BY THE GEOTECHNICAL ENGINEER
SLIP
JOINT
CONCRETE SLAB ON GRADE
BACKFILL
DO NOT EXCAVATE WITHIN A 1:1 LINE —
EXTENDING DOWN AND AWAY FROM
EDGE OF FOOTING. MAINTAIN THIS ANGLE
OF EXCAVATION TO A DEPTH OF TWICE THE
FOOTING WIDTH.
5� 1
INDATION MINIMUM 10 MIL POLYETHYLENE BARRIER OR
WALL EQUIVALENT APPROVED BY GEOTECHNICAL
ENGINEER. ATTACH TO WALL AFTER
DAMPPROOFING AND EXTEND AT LEAST 1
FOOT UP ON WALL AND BENEATH FLOW LINE
OF PIPE.
BACKFILL
NON -WOVEN GEOTEXTILE FILTER
FABRIC (MIRAFI 140N OR EQUIVALENT
APPROVED BY GEOTECHNICAL
ENGINEER) PLACED ACROSS ENTIRE
WIDTH OF DRAIN GRAVEL.
DRAIN GRAVEL (SEE NOTE #4) GRAVEL
SHOULD FILL ENTIRE TRENCH AND EXTEND
LATERALLY TO TOP OF FOOTING. GRAVEL
COVER ABOVE PIPE SHOULD BE AT LEAST 4"
8"
MINIMUM
FOOTING FOUNDATION
TYPICAL EXTERIOR DRAIN DETAIL
FTG 3 EXT-SOG
SEPTEMBER 2007 FIGURE 2
EXTEND POLYETHYLENE TO OUTSIDE
EDGE OF BOTTOM OF TRENCH.
DRAIN PIPE - (SEE NOTES #2 & 3)
AT LOCATION OF HIGH POINT,
ESTABLISH BOTTOM OF DRAIN
PIPE AT LEAST 4" BELOW
BOTTOM OF FOOTING OR PAD
A.G. Wassenaar
Geotechnical and Environmental Consultants
1. 3-INCH OR 4-INCH DIAMETER RIGID PERFORATED
PVC PIPE (ASTM D2729 MINIMUM SCHEDULE 20),
OR AN APPROVED SUBSTITUTE. WRAP PIPE WITH
GEOTEXTILE FABRIC (MIRAFI 140N OR
EQUIVALENT)
2. GRAVEL SPECIFICATION: 2" MINUS WASHED
ROCK/GRAVEL, POORLY GRADED WITH NO MORE
THAN 30% PASSING THE 3/8" SIEVE AND NO MORE
THAN 10% PASSING THE #4 SIEVE, OR AS
APPROVED BY THE GEOTECHNICAL ENGINEER
REMOVABLE WINDOW WELL COVER
WINDOW WELL
WINDOW
WELL
COMPACTED
BACKFILL
2 MINIMUM
0 czf:> �=). 0 C) 0
0 oo 00
12"
000
0
MINIMUM
D u �) - -
0
0
0
0 GRAVEL
0 (SEE SPEC. 2)
0 SLOPE TO
0 DRAIN PIPE
0
ATTACH TO RECOMMENDED
DRAIN SYSTEM WITH SOLID PVC DRAIN PIPE (SEE SPEC. 1)
PIPE (SPEC. 1) IF INTERIOR DRAIN, PIPE TO BE COVERED BY ABOUT 2"
SLOPE AT 1% TO DRAIN. OF GRAVEL. COVER END WITH
GRATE OR PERFORATED CAP.
WINDOW WELL
MAY 2013 WINDOW WELL
DRAIN DETAIL
FIGURE 3
No Text
No Text
No Text
No Text
No Text
No Text
No Text
. A.G. Wassenaar
, ' � ' . Geotechnical and Environmental Consultants • C•
F,�::,�� f_i `�; ....,\ ., r—� �
{I I F t,�,., �',��
�4i� fr� ,�:.._� 3� ,`� � (E�r� l~-�
e •,:.. ,. :, ,
'd-` � `,� t ;� � � l.;� ) "��l
'� !'�� �_� 9 1 , ,.
M:i �y /.:' ���.m
. �4:.3` l 'i �� :,�
���_J ...=J -"r �:�.;%� i.r C�
NOTES:
, 1. DRAIN MUST SLOPE TO A POSITIVE
GRAVITY OUTLET AND/OR TO SUMP
WHERE WATER CAN BE REMOVED
BY PUMPING
��� � //�\ 2 MIMMUM OF�1 8"PER FOOT�eNDo�jPE AT A
� � ��� // OR AS APPROVED BY THE GEOTECHNICAL ENGINEER
///\ �
3. 4-INCH DIAMETER RIGID PERFORATED PVC
PIPE(ASTM D2729 MINIMUM SCHEDULE 20),OR
FOUNDATION SUBSTITUTE APPROVED BY GEOTECHNICAL ENGINEER
WALL
4. GRAVEL SPECIFICATION:2"MINUS WASHED
ROCK/GRAVEL, POORLY GRADED WITH NO MORE
THAN 30%PASSING THE 3/8"SIEVE AND NO
MORE THAN 10%PASSING THE#4 SIEVE,OR AS
APPROVED BY THE GEOTECHNICAL ENGINEER
MINIMUM 10 MIL POLYETHYLENE BARRIER,OR gACKFILL
EQUIVALENT APPROVED BY GEOTECHNICAL
ENGINEER.ATTACH TO WALL AFfER
DAMPPROOFING AND EXTEND AT LEAST 1 FOOT
UP ON WALL AND BENEATH FLOW LINE OF PIPE.
NON-WOVEN GEOTEXTILE FILTER FABRIC
(MIRAFI 140N OR EQUIVALENT APPROVED BY
GEOTECHNICAL ENGINEER)PLACED
OVER ENTIRE WIDTH OF DRAIN GRAVEL. FOUNDATION VOID SPACE
DRAIN GRAVEL(SEE NOTE#4).
FILL ENTIRE TRENCH WITH GRAVEL AND
EXTEND TO TOP OF VOID. MINIMUM GRAVEL
COVER OF 4"IS REQUIRED.
i SLIP JOINT
CONCRETE SLAB
, . .�,•:•:'0:�:;Q::�
�::::�:�::;. ::.a:o:Q:��: ,,,,��,,,,,�%,,,�,,,,v,%��%%��%%��%%��
o:. �:.:...o..�;;;.,.;:
..�:�-::...
DRAIN PIPE-(SEE NOTES#2&3 �" '�'
AT LOCATION OF HIGH POINT, '�'�' � Q!
ESTABLISH BOTTOM OF DRAIN DRILLED PIER
PIPE AT LEAST 8"BELOW
' BOTTOM OF VOID
8�� ��
MINIMUM
EXTEND POLYETHYLENE TO OUTSIDE
EDGE OF BOTfOM OF TRENCH
PIER FOUNDATION
PIER-3 EXTSOG TYPICAL EXTERIOR DRAIN DETAIL
SEPTEMBER 2007 FIGURE 1