Loading...
HomeMy WebLinkAbout3710 S College Ave - Applications/Mechanical - 10/08/2015Oct 09 2015 08:30AM Gary Hooley Heat and Air 9702249198 ,I'- q page 2 of Flirt Collins Planning, Development &Transportation 281 N. College Ave P.Q. Box 580 Fort Collins, CO 80524 Phone 970-416-Z740 Fax 22+6134 OVER-THE-COUNTER PERMITS ONLY This application is to be used to apply for the following permits only (check.all that apply). D Alr Conditioning * Demolition (interior non-structural) 17 Electrical Alteration (not service change) D Gas Lighter 0 Gas Log * Heating Unit ❑ Lawn Sprinkler ❑ Mobile Home replacement 0 Roofing❑ Sewer Line C3 Photo -voltaic ❑ Ventilation ❑ Water Heater 0 Water Line 0 WoodlPellet Stove (must be EPA certified, provide make, model and manufacturer). Complete all applicable Information on the application. Incomplete applications will not be accepted. Application # 131,50 760 Z For office use only Date 10/8/2015 Sob Write Address (raqulwd) Value of construction (labor, materials, profit) 3710 South College Ave. � - . P ' (?, Q0 Property Owner Name Address City/State Zip Phone QSC Restaurants, Inc. 3534 JFK Parkway, Ste. C Fort Collins, CO 80525 377-9204 Applicant Name Address Clty/State Zip Phone QSC Restaurants, Inc. 3534 JFK Parkway, Ste. C Fort Collins, CO 80525 377-9204 Contractor Address City/State ZIP Phone IDS Shortride / Gary Hooleb 1314 Webster Avenue Fort Collins, CO 80524 493-3272 Contractor City of Ft. Collins Sales Tax # Are you paying taxes here or by report? III Here O Report satastax number isregrnredbyall confradnrs Are you paying with your trust account? DYes ONo 34734 Is this a resldentlalyor commercial project? 0 Residential O Commercial If residential, is it: ❑ Single Family Detached 0 Condo/townhome (single family attached) ® Duplex C3 Multifamily (apartment) 0 Garage If commercial, Is it; O Bank 0 Bar C3 Church 17 Hotel/Motel O Medical office 0 Office 0 Retail M Restaurant i7 Other (explain) Is this building 50 years of age or more? t7 Yes o No If yes, you may need to contact Histomc Preservation If this is for a demalition permit, what year was the building constructed? ffpnor to JR75, you wlfl need an asbestos assessment to submit wvith this appNcation. of work *If bwn sprinkler/bac UfI w preventer, must Ilst licensed plumber. If first-time A%C, must list licensed electrician. Subcontractors: List the company name or City of Ft Collins license 9 electrician Creekside Plumber Mechanical H-1654 Roofer Other I hereby acknowledge that I have read this applicatlon and state that the above Information is complete and correct I agree to comply with all requirements contained herein and city ordinances and state laws regulating building construction. I know that a permit is not valid until it has been paid and issued. Applicant, Shelly Swanson Print Name: Signature Date bo.1845 Oct 09. 2015 08:30AM Gary Hooley Heat and Air 9702249198 page 3 .RSV t� Community Development & Neighborhood Services 1 281 North College Avenue F �.} l CoW s Fort Collins, CO 80524 970.416.2740 Over the counter permit info sheet for_ New and replacement hvac roof -top equipment The following information must be included on commercial/multi-family projects to approve the permit. 1. The hvac equipment is: Replacement of existing equipment. ❑ New/additional roof -top equipment. 2. For Replacement equipment: Equipment is the same weight or lighter and similar or smaller size/footprint. ❑ Equipment is heavier and will provide engineered documentation showing roof can support new equipment or modifications that must be done to support such equipment. Replacement equipment is in the same location and not taller than previous. ❑ Replacement equipment is in new location and/or taller. I GI%r Ma►u ani rirbVV%^"1+. ❑ ,See attached engineered documentation showing roof can support new equipment or modifications that must be done to support such equipment. 4. Is outside air (ventilation) being provided for building occupants through this hvac system (see 2009 IMC chap 4). How will equipment be set to meet this requirement? If not how is ventilation provided? JiAS Ce%1Po/yliZ,4 GT�J_ oW�5 Applicant sign ure and date (Form updated 9-22-2010)