enaar
2180 South Ivanhoe Strce-t, Suite 5
E)enver, Colorado 80222-5710
Geotechnical and Environmental Consultants
Meritage Homes of Colorado, Inc.
6892 South Yosemite Court, Suite 1-201
Centennial, Colorado 80112
Attention: Mr. Michael Bird
Subject: Soil and Foundation Study
Proposed Residential Structure
Lot 8, Block 2
Rigden Farm, Filing 17
Fort Collins, Colorado
Project Number 131718
Purpose
303-759-8100 Fax 303-756-2920
®, www.agwassenaar.com
August 20, 2013
Revised November 12, 2013
As requested, we have performed a soil and foundation study at the subject site. The purpose of our
study was to observe subsurface conditions encountered and to recommend geotechnical design
criteria for the design and construction of the foundation for the proposed residence. This letter
presents a summary of our findings and recommendations.
Subsurface Conditions
The field exploration included drilling a 4-inch diameter auger boring near the center of the lot to a
depth of approximately 20 feet. The subsurface materials encountered consisted of:
0' to 12' Fill, clay, very stiff, silty, sandy, slightly moist to moist, brown
12' to 20' Clay, soft to medium stiff, silty, sandy, very moist to wet, brown
Date of drilling: July 18, 2013
Depth to water: 14 feet at the time of drilling
Destroyed 4 days after drilling
Laboratory Testing
Samples obtained during drilling were returned to the laboratory. They were visually classified and
testing was assigned to selected samples in an effort to evaluate the engineering properties of the
subsurface materials encountered. Site specific laboratory swell/consolidation tests exhibited low
measured swell (0.7% at a depth of 4 feet and 1.0% at a depth of 9 feet) upon an increase in moisture
content under a load of 1,000 pounds per square foot (psf). Based upon visual observation of the
subsurface conditions encountered and laboratory testing for this and/or adjacent lots, it is our opinion
Meritage Homes of Colorado, Inc.
Project Number 131718
August 20, 2013
Revised November 12, 2013
Page 2
that the subsurface materials below a depth of 6 feet generally exhibit low potential for expansion.
Refer to the Colorado Geological Survey Special Publication 43 for a description of expansive soils and
their impact on structure performance.
Existing Fill
Fill was encountered in our test borings that was placed to bring the site to the present grades during
site development. Our sampling and testing of the fill encountered indicated it was likely placed in a
manner that would allow foundation support. However, the construction observation reports of the fill
placement presented to this office, while indicating that most of the tests passed the compaction and
moisture specifications, were incomplete. We assume that the fill was placed as required by the site
developer for a residential subdivision in a manner designed to support residences. With this
understanding, we recommend that full records of fill placement be obtained from the developer. The
Client must understand that, even with the engineering opinions expressed within this report, the
construction of foundations on undocumented fill is a risk that they must accept. We cannot and will
not be liable for work conducted by others. As an additional precaution, we must be retained to observe
the fill in the open excavation (prior to foundation construction). Additional recommendations will be
made at that time as determined. from our at -grade observations.
Foundation Recommendations
Based on our evaluation of the subsurface conditions, the proposed residence may be founded upon
spread or pad -type footings bearing at least 6 feet below the existing grade on the natural
undisturbed soils or on properly placed and compacted fill. The footings should be designed for a
maximum bearing pressure of 1,500 psf. Footing dimensions and foundation structural elements
should be determined by a structural engineer. Concrete in contact with the subsurface materials may
be designed for negligible (SO) sulfate exposure as defined by ACI 318.4.3. Bearing materials
loosened by machine excavation should be removed prior to placing footing concrete. Occasionally,
pockets of dry, hard fill or very moist, soft fill may be encountered in the foundation excavation. If this
condition occurs, the footings should extend to properly moisture treated fill. Exterior footings should
bear at least 3 feet below exterior grade for frost protection. The bearing materials beneath footings
should be protected from freezing during construction. All footing excavations should be observed prior
to placement of concrete to confirm the footings are bearing on suitable materials as anticipated for
design purposes.
The foundation walls backfilled with on -site materials should be designed for a lateral earth pressure
based upon an equivalent fluid density of 65 pounds per cubic foot (pcf) for the "at rest" condition or
50 pcf for the "active" condition. The "active" condition should only be used where wall movements of
at least 0.5% of the wall height are allowed. These values have been provided without considerations
for sloping backfill, surcharge loading or hydrostatic pressures. Construction of a drain system and
proper surface drainage as discussed later in this report may lower the potential of developing
hydrostatic pressure in the backfill materials. Minor cracking of concrete foundation walls should be
expected.
Meritage Homes of Colorado, Inc.
Project Number 1.31718
August 20, 2013
Revised November 12, 2013
Page 3
Basement Floor Construction
A basement slab performance risk evaluation was conducted in general conformance with industry
guidelines for the local area. The risk assessment of a site for potential movement is not absolute;
rather, it represents a judgment based upon the data available and our experience in the area.
Movement of foundations and concrete flat work will occur with time in low to very high risk areas as
the soil moisture content increases. On low and moderate rated sites, slab movements of up to 3
inches or more across the slab with slab cracking of up to %-inch or more in width and/or differential
are considered normal. The damage generally increases as the risk assessment increases and as the
depth of wetting increases. It must be understood, however, that assessing risk is an opinion. There
is currently no type of testing or correlation of factors that will definitively predict the amount of heave
that a floor slab will exhibit. Therefore, it may be possible that heaves less than or in excess of what
is considered "normal" may be experienced.
For sites with a risk assessment of high or very high, we recommend an interior floor system
engineered for expansive soils be constructed. An alternative to the use of an engineered floor system,
such as soil modification to reduce the risk assessment, may also be considered. In addition, an
engineered interior floor system is recommended for all finished areas or any other areas where floor
movements cannot be tolerated.
Based upon our evaluation of the subsurface conditions at this site, it is our opinion that the slab
performance risk for this site is low. If this risk of movement is not acceptable, engineered interior
floors should be constructed or an alternative such as soil modification should be considered.
If the Builder and/or Owner desires to construct a concrete slab -on -grade and accepts the risk of slab
movement, slabs supported by the expansive subsurface materials should be constructed using the
following criteria:
Slabs should be separated from exterior walls and interior bearing members with a
joint which allows free vertical movement of the slab.
2. Slab bearing partitions should be constructed with a minimum 2-inch void space.
Stairways bearing upon the slab should be constructed in such a way as to allow at
least 2 inches of slab heave. In the event of slab heave, the movement should not
be transmitted directly through the partitions to the remainder of the residence.
3. Plumbing and utilities should be isolated from the slab.
4. Where a forced -air heating system is used and the furnace is located on the slab, we
recommend provision for a collapsible connection between the furnace and the duct
work to allow for at least 3 inches of slab heave. Utility connections should also be
provided with flexible connections capable of accommodating the same magnitude
of movement as specified above.
5. Provide frequent control joints in the slab.
Meritage Homes of Colorado, Inc.
Project Number 131718
August 20, 2013
Revised November 12, 2013
Page 4
Following these recommendations will reduce immediate damage caused by movement of the floor
slab; however, the void spaces recommended are not intended to predict total slab movement. Care
should be taken to monitor and reestablish partition voids and flexible connections when necessary.
We are available to provide further consultation regarding basement slab performance risk
assessments.
Crawl Space Construction
The crawl space ground surface should be sloped to the perimeter drain system. Trenching or dishing
out of the crawl space is not recommended unless a drain system is placed in these areas in such a
manner to facilitate drainage. The recommended clearance from the crawl space ground surface to
the engineered floor system should meet applicable codes. In addition, all plumbing lines should be
isolated from the ground surface or foundation walls by at least 2 inches.
During construction, the crawl space area should be checked for standing water or very moist
conditions, construction debris, and other deleterious materials. If these conditions exist, the area
should be evaluated and mitigated, as necessary.
Crawl space areas should be constructed with consideration given to proper ventilation and moisture
.management. Provisions such as the installation of a vapor retarder should be utilized to reduce the
amount of moisture (humidity) in the crawl space air. The Client and any future Owner should be aware
that crawl space areas are subject to various air quality issues. A consultant specializing in ventilation
and air quality control should be contacted to provide any additional recommendations. Such
recommendations are beyond the geotechnical scope of this study. The environmental division of A. G.
Wassenaar, Inc. is capable of providing such services. Refer to "Homeowner's Guide To Moisture
Management" by Tri-County Health Department (Brochure Number S-323) for additional information.
Subsurface Drainage
As a minimum, we recommend providing a subsurface drainage system around the lowest below grade
area. The purpose of the drain is to collect water which may become trapped on the surface of the
excavation and enter the basement or crawl space areas. A drain should be constructed similar to the
attached drain detail (Figure 1) and should be uniformly sloped to a positive gravity discharge or sump.
If a sump pit is installed, it should be monitored for water accumulation and proper operation. The
water level in the sump pit should not be allowed to rise above the foundation drain inlet pipe(s). If
water rises above the inlet pipe(s), a pump should be installed (if not originally equipped) or
maintenance should be performed on the existing pump.
Surface Drainage
The wetting of foundation soils and/or bedrock materials which causes heave may be reduced by
carefully planned and maintained surface drainage. The following recommendations should be
implemented during construction and maintained by the Homeowner after the residence is completed:
Meritage Homes of Colorado, Inc.
Project Number 131718
August 20, 2013
Revised November 12, 2013
Page 5
1. Excessive wetting or drying of the open foundation excavation should be avoided as
much as practical during construction.
2. The ground surface surrounding the exterior of the foundation should be maintained
in such a manner as to provide for positive surface drainage away from the
foundation. At completion of construction, we recommend a minimum fall away from
the foundation of 6 inches in the first 5 feet. This slope should be continuous across
the backfill zone.
3. Backfill around the foundation should be moistened and compacted in such a
manner as to reduce future settlement. Areas which settle should be filled as soon
as possible in order to maintain positive drainage away from the foundation.
4. If lawn edging is used around the exterior of the foundation, it should be constructed
in a manner to prevent ponding of surface water in the vicinity of the backfill soils.
5. All drainage swales should be constructed and maintained a minimum of 5 feet away
from the foundation on side yards and 15 feet away from the foundation on back and
front yards. Drainage swales should maintain a slope of at least 2% off of the lot.
Swales must not be blocked by fences, landscaping, paths or other Homeowner
installed items.
6. Roof downspouts and drains should discharge well beyond the limits of foundation
backfill.
7. Watering adjacent to the foundation should be reduced as much as practical.
Landscaping which requires excessive watering should not be located within 5 feet
of foundation walls. Main sprinkler lines, zone control boxes and drains should be
located outside the limits of the foundation backfill. Sprinkler heads should be
positioned such that the spray does not fall within 5 feet of foundation walls.
8. Plastic membranes should not be used to cover the ground surface immediately
surrounding the foundation. These membranes tend to trap moisture and prevent
normal evaporation from occurring. We recommend the use of a weed suppressant
geotextile fabric.
Limitations
We believe the professional judgments expressed in this report are consistent with that degree of skill
and care ordinarily exercised by practicing design professionals performing similar design services in
the same locality, at the same time, at the same site and under the same or similar circumstances and
conditions. No other warranty, express or implied, is made. The location of the test boring drilled and
the laboratory testing performed for this study were designed to obtain a reasonably accurate picture
of subsurface conditions for design purposes. Variations in subsurface conditions not indicated by the
boring are possible and expected. Therefore, we should be retained to observe the foundation
Meritage Homes of Colorado, Inc.
Project Number 131718
August 20, 2013
Revised November 12, 2013
Page 6
excavation and construction in order to verify or revise our recommendations. If unexpected
subsurface conditions are observed by others during construction, we should be called to review our
recommendations.
This report was prepared for the exclusive use of our Client for the sole purpose of providing
geotechnical design criteria for the subject structure based upon the existing site conditions as
encountered. The conclusions and recommendations contained in this report shall not be considered
valid for use by Others without written authorization from A. G. Wassenaar, Inc. In addition, the state
of practice in geotechnical engineering is constantly evolving. Therefore, findings presented in this
report should be reviewed and revised, if necessary, prior to actual construction.
If we can be of further service in discussing the contents of this letter or in analysis of the proposed
structure from the soil and foundation viewpoint, please call our office.
Sincerely,
A. G. WASSENAAR;
Michael R. CSnner, P^E� —�Z 4.6
Senior Engineer
MRC/lia
Attachment: Figure 1
Statement of of Services
A.G. Wassenaar
Geotechnica=ndEnvVi�ronmental �Consulta�nts--
�
NOTES:
1. DRAIN MUST SLOPE TO A POSITIVE
GRAVITY OUTLET AND/OR TO SUMP
WHERE WATER CAN BE REMOVED
BY PUMPING
2. SLOPE BOTTOM OF TRENCH AND PIPE AT A
MINIMUM OF 1/8" PER FOOT (i.e. 1 %)
OR AS APPROVED BY THE GEOTECHNICAL ENGINEER
3. 4-INCH DIAMETER RIGID PERFORATED PVC
PIPE (ASTM D2729 MINIMUM SCHEDULE 20), OR
SUBSTITUTE APPROVED BY GEOTECHNICAL ENGINEER
4. GRAVEL SPECIFICATION: 2" MINUS WASHED
ROCK/GRAVEL, POORLY GRADED WITH NO MORE
THAN 30% PASSING THE 3/8" SIEVE AND NO
MORE THAN 10% PASSING THE #4 SIEVE, OR AS
APPROVED BY THE GEOTECHNICAL ENGINEER
SLIP
CONCRETE SLAB ON GRADE
DO NOT EXCAVATE WITHIN A 1:1 LINE
EXTENDING DOWN AND AWAY FROM
EDGE OF FOOTING. MAINTAIN THIS ANGLE
OF EXCAVATION TO A DEPTH OF TWICE THE
FOOTING WIDTH.
)NDATION MINIMUM 10 MIL POLYETHYLENE BARRIER OR
WALL EQUIVALENT APPROVED BY GEOTECHNICAL
ENGINEER. ATTACH TO WALL AFTER
DAMPPROOFING AND EXTEND AT LEAST 1
FOOT UP ON WALL AND BENEATH FLOW LINE
OF PIPE.
BACKFILL
NON -WOVEN GEOTEXTILE FILTER
FABRIC (MIRAFI 140N OR EQUIVALENT
APPROVED BY GEOTECHNICAL
ENGINEER) PLACED ACROSS ENTIRE
WIDTH OF DRAIN GRAVEL.
DRAIN GRAVEL (SEE NOTE #4) GRAVEL
SHOULD FILL ENTIRE TRENCH AND EXTEND
LATERALLY TO TOP OF FOOTING. GRAVEL
COVER ABOVE PIPE SHOULD BE AT LEAST 4"
EXTEND POLYETHYLENE TO OUTSIDE
EDGE OF BOTTOM OF TRENCH.
\ DRAIN PIPE - (SEE NOTES #2 & 3)
8" \ AT LOCATION OF HIGH POINT,
MINIMUM-70� ESTABLISH BOTTOM OF DRAIN
PIPE AT LEAST 4" BELOW
BOTTOM OF FOOTING OR PAD
FOOTING FOUNDATION
TYPICAL EXTERIOR DRAIN DETAIL
FTG 3 EXT-SOG FIGURE 1
SEPTEMBER 2007