Loading...
HomeMy WebLinkAbout315 E Foothills Pkwy - Special Inspections/Engineering - 10/21/2015.N ; Monroe & Newell Engineers, Inc. Vail • Denver October 21, 2015 The Beek Group 1001 17th Street Suite PL 100 Denver,CO 80202 Attn: Josh Myers Re: FFootllills Parking Garage Foothills Mall, Ft. Collins, CO (M&N#8600.06) Dear Mr. Myers, -* 81402It22. �-- b'L Monroe & Newell Engineers, Inc. observed the�foundat'iolls"for the p 'ki11g'gai'agejduring construction. We also reviewed inspection reports prepared -by Ground Englneerillg. To the best of our knowledge and belief, based on our visual observations, and the information provided to us, the foundations for the parking garage appear to be constructed in compliance with the construction documents prepared by our office and approved by the Building Department. If you have any questions or comments, please call. Very truly yours, MONROE & NEWELL ENIGINEERS, INC. 6�,JAA-Ie4 William j!'1..Newell, P.E., MASCE www.momoe-newell.com 1400 Glenarm • Suite 101 • Denver, Colorado 90202 (303) 623-4927 • FAX (303) 623-6602 • email: denver@nionroe-newell.com a � o. ENGINEERING December 16, 2015 Subject: Materials Testing, Building Summary Letter, Foothills Mall Parking Garage, Fort Collins, Colorado Job Number: 14-0632 Permit Number:- 81 foZ 'Az 2- Mr. Robert Walter Walton Foothills Holdings, VI, LLC 5750 DTC Parkway, Suite 210 Greenwood Village, Co 80111 Attn: Mr. Walter, This letter summarizes the materials testing Ground Engineering Consultants, Inc. (GROUND) performed during the construction of the(Parking Garage at the Foothills Mall project located at 214 East Foothills Parkway in Fort Collins, Colorado. The materials testing was performed on a part-time basis at times scheduled by the contractor or subcontractors. Representatives of our office were on -site to periodically observe reinforcing steel and perform concrete testing for elevated slab -on -decks. Samples of concrete were cast for compressive strength testing during the construction of the reinforced concrete. Representatives of our office were on -site to periodically observe the reinforcing steel and grout placement during construction of the structural masonry. Samples of prisms, mortar and grout were cast for compressive strength testing during construction of the structural masonry. A Certified Welding Inspector (CWI) was on -site to observe4field wslded'and-boltod connecfions` between 2/3/15 and 11/6/15. Observations were performed during the erection of the structural steel. Based on the test results and to the best of our knowledge, it is our opinion that the materials tested as outlined above for structural masonry, reinforced concrete and structural steel were in general accordance with project plans and specifications. The materials testing as indicated above was periodically performed to provide data to the Owner, Contractor, and Subcontractors to assist them in evaluating the general compliance of LOVELAND OFFICE 2468 East 9th Street I Loveland, CO 80537 1 (970) 622-0800 1 www.groundeng.com ENGLEWOOD I COMMERCE CITY I LOVELAND I GRANBY I GYPSUM