HomeMy WebLinkAbout2847 Denver Dr - Special Inspections/Engineering - 08/04/2015Architecture Materials Testing
Structural Q M G Forensic
Geotechnical Civil/Planning
ROCKY MOUNTAIN GROUP
Job No. 148368
August 4, 2015
Journey Homes, Northern CO
7251 W. 20th St., L-200
Greeley, CO 80634
Re: Foundation Subsurface Drain Observation
2847 Denver Dr, Units 1-6
Rigden Farm, Filing No. 6, Tract Z
Fort Collins, Colorado
Dear Larry:
As requested, personnel of Rocky Mountain Group (RMG) observed the foundation subsurface
drainage pipe and sump pit perimeter drain system on August 4, 2015. RMG found it to be
complete and in substantial compliance with the design drawings prepared by High Plains
Engineering & Design, LLC for this structure at the date of this observation.
Should you have questions, please feel free to contact our office.
Cordially,
�28/6/15
43291
Ryan Laird
Geotechnical Staff Engineer
Southern Office:
Central Office: Northern Office:
Monument: 719.488.2145
Colorado Springs, CO 80918
Englewood, CO 80112 Evans, CO 80620
woodland Park: 719.687.6077
719.548.0600
303.688.9475 970.330.1071
Erbil/Kurdistan Iraq: 0750 192 99 44
Ulaanbaatar, Mongolia: 976 99106671
www.rm-,en-.inccrs.com
Architecture Materials Testing
Structural (f!�MG Forensic
Geotechnical Civil/Planning
ROCKY MOUNTAIN GROUP
Job No. 148368
August 4, 2015
Journey Homes, Northern CO
7251 W. 20th St., L-200
Greeley, CO 80634
Re: Foundation Damp Proofing
2847 Denver Dr, Units 1-6
Rigden Farm, Filing No. 6, Tract Z
Fort Collins, Colorado
Dear Larry:
As requested, personnel of Rocky Mountain Group (RMG) observed the foundation damp
proofing and found it to be complete and in substantial compliance with the design drawings
prepared by High Plains Engineering & Design, LLC for this structure at the date of the
inspection. The damp proof was observed on August 4, 2015.
Should you have questions, please feel free to contact our office.
Cordially,
Ryan Laird
Geotechnical Staff Engineer
-y
43291, R.
��ssiOIYAL •Ee��'\c,
Southern Office: Central Office: Northern Office:
Monument: 719.488.2145
Colorado Springs, CO 80918 Englewood, CO 80112 Evans, CO 80620
woodland Park: 719.687.6077
719.5,18.0600 303.688.9475 970.330.1071
Erbil/Kurdistan Iraq: 0750 192 99 44
lilaanbaatar, Mongolia: 976 99106671
www. rmgcugin cc rs. co m
Architecture Materials Testing
Structural G Forensic
Geotechnical Civil/Planning
ROCKY MOUNTAIN GROUP
Job No. 148368
July 20, 2015
Journey Homes, Northern CO
7251 W. 20th St., L-200
Greeley, CO 80634
Re: Footing and Foundation Observation
2847 Denver Dr., Units 1-6
Rigden Farm, Filing No. 6, Tract Z
Fort Collins, Colorado
Dear Larry:
As requested, personnel of Rocky Mountain Group (RIMG) observed the footing and foundation
formwork and reinforcing steel for the above referenced multi -family residential property and
found them to be in substantial compliance with the design drawings prepared by High Plains
Engineering & Design, LLC for this structure. The "Ufer" electrical ground system was placed
in the footing and meets the requirements of Article 250.52 of the 2011 National Electrical Code
(NEC). The footings were observed on July 8, 2015 and the foundation walls were observed on
July 20, 2015.
Should you have questions, please feel free to contact our office.
Cordially,
Cq..�- 7/22/15 iV
43291 ti:
V^�
Ryan Laird
Geotechnical Staff Engineer
southern Office: Central Office: Northern Office:
Colorado springs, CO 80918 Englewood, CO 80112 Evans, CO 80620
719.548.0600 303.688.9475 970.330.1071
Monument: 719.488.2145
Woodland Park: 719.687.6077
Erbil/Kurdistan Iraq: 0750 192 9944
Waanbaatar, Mongolia: 976 99106671
-Aww. r m gc n,-i n e c rs. c o rn
Architecture
Structural
Geotechnical
ROCKY MOUNTAIN GROUP
Job No. 148368
June 19, 2015
Journey Homes, Northern CO
7251 W. 20th St., L-200
Greeley, CO 80634
Materials Testing
Forensic
Civil/Planning
,8 /SO a--fie7 L--
Re: Open Excavation Observation
2847 Denver Dr
Rigden Farm, Filing No. 6, Tract Z
Fort Collins, Colorado
Gentlemen:
Rocky Mountain Group (RMG) has observed the foundation excavation at the above referenced
address on June 19, 2015. Our findings, conclusions and recommendations are provided in this
report. R1MG should be made aware of subsequent changes to the excavation.
Subsurface Soil Investigation: A Subsurface Soil Investigation was performed which included
the referenced site. Results can be seen in the report by RMG Engineers Group, dated October 2,
2013, Job No. 139917. The homeowners should carefully familiarize themselves with the
information in the report that may affect residential construction. Additionally, the homeowners
should carefully familiarize themselves with the information contained in the attached Appendix
A.
Subsurface Materials:
Expansion Potential:
Moisture Conditions:
0'-2': Fill: Clayey Sand
2'-6.5': Silty Sand and Cobbles
6.5'-8': Silty Sandy Clay
Low.
Moist.
Maximum Allowable Bearing Pressure: 1,500 psf.
Minimum Dead Load Pressure: None.
Equivalent Fluid Pressure (EFP): 40 pcf. See Lateral Earth Pressures section.
Southern office: Central Office: Northern Office:
Monument: 719.488.2145
Colorado Springs, CO 80918 Englewood, CO 80112 Evans, CO 80620
woodland Park: 719.687.6077
719.548.0600 303.688.9475 970.330.1071
Erbil/Kurdistan Iraq: 0750 192 99 44
Ulaanbaatar, Mongolia: 976 99106671
www. r mgetigi ne a rs.c om
2847 Denver Dr
Rigden Farm, Filing No. 6, Tract Z
Fort Collins, Colorado
Fill:
Overlot grading fill was exposed in the excavation. We understand this fill was observed and
tested during placement by others. The excavation penetrated the fill in the basement portion of
the house.
Foundation Recommendations:
The foundation should conform to the master foundation plan for Journey Homes, LLC model 6-
Unit Model provided by High Plains Engineering & Design, LLC, Project No. 15-5155, last
dated January 5, 2015.
Subsurface Drainage Recommendations:
A subsurface perimeter drain is recommended around portions of the structure which will have
habitable or storage space located below the finished ground surface. This includes crawlspace
areas but not the walkout trench, if applicable. See Perimeter Drain section.
Open Hole Observation:
The recommendations provided in this report are based on the conditions exposed in the
excavation at the time of our observation and information contained in the Subsurface Soils
Investigation referenced above. These recommendations are based on accepted local engineering
practice and arc intended for individuals familiar with local construction practices and standards.
If exposure to the elements results in a change to these conditions at any point prior to
foundation construction and/or backfllling the foundation, we recommend that RMG be
contacted to re-evaluate the excavation to determine suitability of the recommendations
contained herein.
All previous recommendations included in the Subsurface Soil Investigation referenced
above and not specifically addressed herein remain valid.
Should you have questions, please do not hesitate to call.
Cordially,
Rocky Mountain Group - RMG
ItEG1S
CS :�.`r /14/15�?S : O
Ryan Laird
ra
Geotechnical Staff Engineer Cos, Engineer S""
Rocky Mountain Group - RMG 2 RMG Job No. 148368