Loading...
HomeMy WebLinkAbout2847 Denver Dr - Special Inspections/Engineering - 08/04/2015Architecture Materials Testing Structural Q M G Forensic Geotechnical Civil/Planning ROCKY MOUNTAIN GROUP Job No. 148368 August 4, 2015 Journey Homes, Northern CO 7251 W. 20th St., L-200 Greeley, CO 80634 Re: Foundation Subsurface Drain Observation 2847 Denver Dr, Units 1-6 Rigden Farm, Filing No. 6, Tract Z Fort Collins, Colorado Dear Larry: As requested, personnel of Rocky Mountain Group (RMG) observed the foundation subsurface drainage pipe and sump pit perimeter drain system on August 4, 2015. RMG found it to be complete and in substantial compliance with the design drawings prepared by High Plains Engineering & Design, LLC for this structure at the date of this observation. Should you have questions, please feel free to contact our office. Cordially, �28/6/15 43291 Ryan Laird Geotechnical Staff Engineer Southern Office: Central Office: Northern Office: Monument: 719.488.2145 Colorado Springs, CO 80918 Englewood, CO 80112 Evans, CO 80620 woodland Park: 719.687.6077 719.548.0600 303.688.9475 970.330.1071 Erbil/Kurdistan Iraq: 0750 192 99 44 Ulaanbaatar, Mongolia: 976 99106671 www.rm-,en-.inccrs.com Architecture Materials Testing Structural (f!�MG Forensic Geotechnical Civil/Planning ROCKY MOUNTAIN GROUP Job No. 148368 August 4, 2015 Journey Homes, Northern CO 7251 W. 20th St., L-200 Greeley, CO 80634 Re: Foundation Damp Proofing 2847 Denver Dr, Units 1-6 Rigden Farm, Filing No. 6, Tract Z Fort Collins, Colorado Dear Larry: As requested, personnel of Rocky Mountain Group (RMG) observed the foundation damp proofing and found it to be complete and in substantial compliance with the design drawings prepared by High Plains Engineering & Design, LLC for this structure at the date of the inspection. The damp proof was observed on August 4, 2015. Should you have questions, please feel free to contact our office. Cordially, Ryan Laird Geotechnical Staff Engineer -y 43291, R. ��ssiOIYAL •Ee��'\c, Southern Office: Central Office: Northern Office: Monument: 719.488.2145 Colorado Springs, CO 80918 Englewood, CO 80112 Evans, CO 80620 woodland Park: 719.687.6077 719.5,18.0600 303.688.9475 970.330.1071 Erbil/Kurdistan Iraq: 0750 192 99 44 lilaanbaatar, Mongolia: 976 99106671 www. rmgcugin cc rs. co m Architecture Materials Testing Structural G Forensic Geotechnical Civil/Planning ROCKY MOUNTAIN GROUP Job No. 148368 July 20, 2015 Journey Homes, Northern CO 7251 W. 20th St., L-200 Greeley, CO 80634 Re: Footing and Foundation Observation 2847 Denver Dr., Units 1-6 Rigden Farm, Filing No. 6, Tract Z Fort Collins, Colorado Dear Larry: As requested, personnel of Rocky Mountain Group (RIMG) observed the footing and foundation formwork and reinforcing steel for the above referenced multi -family residential property and found them to be in substantial compliance with the design drawings prepared by High Plains Engineering & Design, LLC for this structure. The "Ufer" electrical ground system was placed in the footing and meets the requirements of Article 250.52 of the 2011 National Electrical Code (NEC). The footings were observed on July 8, 2015 and the foundation walls were observed on July 20, 2015. Should you have questions, please feel free to contact our office. Cordially, Cq..�- 7/22/15 iV 43291 ti: V^� Ryan Laird Geotechnical Staff Engineer southern Office: Central Office: Northern Office: Colorado springs, CO 80918 Englewood, CO 80112 Evans, CO 80620 719.548.0600 303.688.9475 970.330.1071 Monument: 719.488.2145 Woodland Park: 719.687.6077 Erbil/Kurdistan Iraq: 0750 192 9944 Waanbaatar, Mongolia: 976 99106671 -Aww. r m gc n,-i n e c rs. c o rn Architecture Structural Geotechnical ROCKY MOUNTAIN GROUP Job No. 148368 June 19, 2015 Journey Homes, Northern CO 7251 W. 20th St., L-200 Greeley, CO 80634 Materials Testing Forensic Civil/Planning ,8 /SO a--fie7 L-- Re: Open Excavation Observation 2847 Denver Dr Rigden Farm, Filing No. 6, Tract Z Fort Collins, Colorado Gentlemen: Rocky Mountain Group (RMG) has observed the foundation excavation at the above referenced address on June 19, 2015. Our findings, conclusions and recommendations are provided in this report. R1MG should be made aware of subsequent changes to the excavation. Subsurface Soil Investigation: A Subsurface Soil Investigation was performed which included the referenced site. Results can be seen in the report by RMG Engineers Group, dated October 2, 2013, Job No. 139917. The homeowners should carefully familiarize themselves with the information in the report that may affect residential construction. Additionally, the homeowners should carefully familiarize themselves with the information contained in the attached Appendix A. Subsurface Materials: Expansion Potential: Moisture Conditions: 0'-2': Fill: Clayey Sand 2'-6.5': Silty Sand and Cobbles 6.5'-8': Silty Sandy Clay Low. Moist. Maximum Allowable Bearing Pressure: 1,500 psf. Minimum Dead Load Pressure: None. Equivalent Fluid Pressure (EFP): 40 pcf. See Lateral Earth Pressures section. Southern office: Central Office: Northern Office: Monument: 719.488.2145 Colorado Springs, CO 80918 Englewood, CO 80112 Evans, CO 80620 woodland Park: 719.687.6077 719.548.0600 303.688.9475 970.330.1071 Erbil/Kurdistan Iraq: 0750 192 99 44 Ulaanbaatar, Mongolia: 976 99106671 www. r mgetigi ne a rs.c om 2847 Denver Dr Rigden Farm, Filing No. 6, Tract Z Fort Collins, Colorado Fill: Overlot grading fill was exposed in the excavation. We understand this fill was observed and tested during placement by others. The excavation penetrated the fill in the basement portion of the house. Foundation Recommendations: The foundation should conform to the master foundation plan for Journey Homes, LLC model 6- Unit Model provided by High Plains Engineering & Design, LLC, Project No. 15-5155, last dated January 5, 2015. Subsurface Drainage Recommendations: A subsurface perimeter drain is recommended around portions of the structure which will have habitable or storage space located below the finished ground surface. This includes crawlspace areas but not the walkout trench, if applicable. See Perimeter Drain section. Open Hole Observation: The recommendations provided in this report are based on the conditions exposed in the excavation at the time of our observation and information contained in the Subsurface Soils Investigation referenced above. These recommendations are based on accepted local engineering practice and arc intended for individuals familiar with local construction practices and standards. If exposure to the elements results in a change to these conditions at any point prior to foundation construction and/or backfllling the foundation, we recommend that RMG be contacted to re-evaluate the excavation to determine suitability of the recommendations contained herein. All previous recommendations included in the Subsurface Soil Investigation referenced above and not specifically addressed herein remain valid. Should you have questions, please do not hesitate to call. Cordially, Rocky Mountain Group - RMG ItEG1S CS :�.`r /14/15�?S : O Ryan Laird ra Geotechnical Staff Engineer Cos, Engineer S"" Rocky Mountain Group - RMG 2 RMG Job No. 148368