Loading...
HomeMy WebLinkAbout777 E Lincoln Ave - Special Inspections/Engineering - 07/17/20144396 GREENFIELD DRIVE WINDSOR, COLORADO 80550 (970) 545-3908 FAX (970) 663-0282 EARTH ENGINEERING CONSULTANTS, LLC July 17, 2014 Mortenson Construction 999 18th Street Suite 1605N, North Tower Denver, Colorado 80202 Attn: Ms. Emily Peddicord (emily.peddicord@mortenson.com) Re: Summary of Site Observations Milk House Relocation Foundations Woodward LNG Campus Fort Collins, Colorado EEC Project No. 1134110 Ms. Peddicord: The purpose of this letter is to summarize the observations completed by Earth Engineering Consultants, LLC (EEC) personnel during construction of the foundation for the relocation of the milk house at the referenced project. Those foundation observations included observation of overexcavation and placement of structural fill for development of the foundation bearing/subgrade, observation of reinforcing steel placement, and observation and testing of cast-in-place concrete for the monolithic slab. At the time of subgrade overexcavation, EEC personnel observed overexcavation of the area of the milk shed to the top of an underlying sand and gravel layer to remove essentially cohesive subgrade materials. EEC personnel also observed the structural backfill that was placed in this area. The materials placed were consistent with the recommendations outlined in our geotechnical report for this project. EEC personnel observed the reinforcing steel placement for the monolithic slab foundation with photographs of the reinforcing steel attached. At the time of concrete placement, EEC personnel performed field checks on the plastic concrete and cast cylinders for laboratory compressive strength testing. Result of the field tests on the plastic concrete and results of compressive strength tests on the cured cylinders are indicated on the attached summary sheet. EEC Project No. 1134110 July 17, 2014 Page2 Earth Engineering Consultants, LLC Based on observation and testing completed by EEC personnel as outlined above and documented on the attached photographs/summaries, it is our opinion the milk house foundation was constructed in general accordance with the Structural Milk House Plan and Details, sheet number SB4-01-0 I, prepared by Ghafari and Associates, LLC, dated 12/ 13/2013 (document release number 3). If we can be of further service to you on the project, please do not hesitate to contact us. Very truly yours, Earth Engineering Consultants, LLC Lester L. Litton, P .E. Principal Engineer Reviewed by: Ethan P. Wiechert, P .E. Senior Project Engineer LLL/EPW/dla WOODWARD LNG CAMPUS FORT COLLINS, COLORADO EEC PROJECT NO. 1134110 JULY 2014 MILK HOUSE FOUNDATION REINFORCEMENT PHOTO #1 PHOTO #2 Placement Date: Placement Location: - Concrete Supplier: B D D1 D2 Project Number: Next Level Development - Wayne Timura: wtimura@nldevelopment.com Ghafari Associates - Matt Kraft: mkraft@ghafari.com Mortenson - Emily Peddicord: emily.peddicord@mortenson.com Mortenson - Matt Simper: matt.simper@mortenson.com Fiore and Sons - Justin Russell: jrussell@fioreandsons.com Bestway Type Report Distribution: Woodward - Steve Stiesmeyer: steve.stiesmeyer@woodward.com Average (in2) (psi) (psi) Strength Strength (in) Compressive Type of Placement: Ticket Number: 1042725 Truck Number: EARTH ENGINEERING CONSULTANTS, LLC REPORT OF CAST-IN-PLACE CONCRETE TESTS GENERAL INFORMATION 1 Air Temperature at Placement (deg F) ---- Compressive Area Failure Cylinder Diameter (in) COMPRESSIVE STRENGTH OF FIELD CAST TEST SPECIMENS (ASTM C39/C31) Specimen Height Maximum Date Age Project: Relative Yield Water Cementitious Ratio (w/c) EEC Technician: Yards: 6.5 of JK 7:57 AM Sample Time: 8:30 AM Required 28 Day Compressive Strength (psi): 3000 Batch Time: 13 1 Test No.: Compressive Test No.: C 2/18/2014 None Hand 640 Mix Code: 303149 Water Added on Site: FIELD TEST DATA RESULTS Unit Weight (pcf) SPECIFICATIONS ASTM C1064 90° Max 6% Concrete Temperature (deg F) 67 4" ---- TEST Slump (in) ASTM C143 Applied Load Cylinder Tested (days) (lbs) Air Content (%) ASTM C231 1134110 C1 03/18/14 28 57570 8 Woodward - Site Overlot 12.57 4580 4 C1 03/18/14 28 57950 8 4 Shear 4610 C1 03/18/14 28 57000 8 12.57 Milk Shed Slab Bestway 4 Shear 4540 02/25/14 7 45050 3590 Comments: Comments: Shear 4580 12.57 C1 8 4 12.57 Shear 3590 ASTM C138 Yield (CY) Number