Loading...
HomeMy WebLinkAbout3239 Glacier Creek Dr - Special Inspections/Engineering - 08/05/2015CTLITHOMPSON August 5, 2015 Triton Communities 1490 Santa Fe Drive, Suite 100 Denver, Colorado 80223 Attention: Mr. Ceri Jones Subject: Summary of Residential Construction Observations 35 Lots at Trail Head Lot 7, Block 12, 3239 Glacier Creek Drive Fort Collins, Colorado CTL Project No.: FC06050.000-305 As requested, we provided residential construction observations for Lot 7, Block 12, 3239 Glacier Creek Drive, at the Trail Head Subdivision. We were scheduled for the following observations to date: Observation Date Result/Remarks Excavation/Footing 6/29/2015 Pass Foundation Wall Steel 7/1/2015 Pass Drain/Dampproof 7/8/2015 Pass The information in our project files indicated there are no outstanding discrepancies for the items listed above and that each was installed in general conformance with the project plans. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL I THOMPSON, INC. Heather Grubb Field Department Manager Attachments: Excavation/Footing Observation Report Foundation Wall Reinforcement Observation Report Foundation Wall Drain/Waterproofing Observation Report 400 North Link Lane I Fort Collins, Colorado 80524 Telephone:970-206-9455 Fax:970-206-9441 E xc,avation/Footing Observation CLIENT: Triton Communities ._-_ 'L49.0_Santa_Fe._Qrive,.Suite-1.00 _._....__.._— _..Denver,_G0_S0223..—.... ---.---....-_------_-_- Recommended Foundation.Syfstte/m CTLITHOMPSON PROJECT N - DATED_ .- ❑ SPREAD FOOTINGS MAXIMUM SOIL PRESSURE OF —... _.-- ..... PSF. MINIMUM WIDThi INCHES T.-f'OOTiNGS WITI I MINIMUM DEADLOAD C _ MAXIMUM SOIL PRESSURE OF MINIMUM UEADLOA PRESSURE OF c� )C.-% PSF. PROVIDER -.. _,.. _- INCIY VOID)3ENE T'i GRAD/&,SEAMS MINIMUM IWIDTH fJL((.l..,'S..LLI%�CV ChIES ❑ GRADE BEAMS AND PADS MAXIMUM SOIL PRESSURE OF MINIMUM DEADLOAD PRESSURE OF ...... _. _ -_-_ PSF. PROVIDE. A INCH VOID BENEATH GRADE BEAMS MINIMIUM WIDTH _-___ IIJCHES Foundation Plan BY _ C�.L-T_\J C: PLAN NO. ---- L_IXi O��.'`�jr 7—.SL._ .._.. .... DATE R / �I WALL FOOTING WIDTH_ .__7 C=- (INCHES) DEPTH ._...-__ (INCHES) COLUMN PAD-_,-.4I_... ............ (INCHES) DEPTH ._.-, ..C///......., _..._ (INCHES) COLUMN PAD --_ �(INCHES) DEPTH o_ _ _ _ .... (INCHES) REINFORCEMENT AS PER PLAN: 1 YES D NO/ ❑ NONE REQUIRED ❑ Ar SITE 01INS PALLED ADDRESS: LOT. ---- _...---- DLOCI( . F_.. _...... -- FILINGNO._..._..._.._____PROJECT Foundation I_ayoLLt 0 16 I (6 A INDICATES APPROXIMATE DEPTHIWIDTH MEASUREMENT LOCATION Soil Conditions At Footing Level Instructions to Contractor UPPERLEVEL................___.___ __--_ -�( FOOTING INGEIdERALCODIFORI.AANCEWITH PLAN ------ ..._.....-'------------------......_.r TING REJECTED - - -- - -- CONDITIONS IN EXCAVATION AS ANTICIPATED LOWER LEVEL �,r-[z._i.�;`�,C� �.1,_.�_l� ��L•v %1__..__ ❑CONDITIONS IN EXCAVATION NOT AS ANTICIPATED. CON FACT GEOTECHNICAL ENGINEER Ground Water Conditions RECOMMENDED CORRECTIVE PROCEDURE ",Z'N NE IN EXCAVATION .' li NONE ENCOUNTERED IN BORING NO. TO. -- FEET ------------- -------- - ---- -- '![� ENCOUNTERED AT FEET IN BORING NO. --- Remarks: FIELD REPRE BY ,3, .' k =:ccy sslor, ° Z� \LINSd�.. _ r DATE OF Foundation Wall Reinforcement Inspee on CLIENT: Triton Communities -1490-Santa-Fe-Drive,-Suite-100 --- - Denver,-CO-80223--- - - Attn:-Ceri Jones- Foundatio/n,P+lla7 �y BY PLAN NO..-_..C(� bD i�� Y-- - DATE ✓, _-� Foundation Plan SPREAD FOOTINGS r'FOOTINGS WITH MINIMUM DEADLOAD ❑ GRADE BEAMS AND PADS [] DRILLED FRICTION PIERS ❑ DRILLED PIERS INTO BEDROCK ❑ OTHER f`l CTUTHOMPSON JOB NO. i-LO W�­ QDDATED WALL ALIGNMENT OFFSET - 5 INCHES Foundation Void rj REQUIRED THICKNESS yi ------.INCHES ❑ NOT REQUIRED Reinforcing Steel GRADE BAR SIZE ---'_- NO. OF BARS, ` _- TOP BOTTOM _— y-- ---- VERTICAL HORIZONTAL Instructions to Contractor IN GENERAL CONFORMANCE WITH PLAN ❑ REJECTED RECOMMENDED CORRECTIVE PROCEDURE ADDRESS: f y'i�� 1 li �C-��•', ,/- [/� IL _ LOT — __..-- -------^.:� BLOCK FILING FILING NO._ JOB NO. Foundation Wall Layout C-- Cr- -k Jr-. �U,FFER Ground.- Location of UFER Ground XI LOCATION [] NOT INSTALLED ❑ NOT REQUIRED COMMENT: Foundation WaH Drtahi/ Voild/Waterpo°®ofor g obserrvagoN,� CLIENT: Triton Communities — --1490-Santa-Fe-Drive; Suite- 100-- - ---._...Denver;,C0-80223--_........- ..--..... ---... ADDRESS: FILING NO.,-___-..PROJECTNO.__I_��_(�(��.L`�LI-,- Foundation Plan Foundation Wall Layout BY __ _T L.-- �_D.M_S��_C�IJ_--- -- ---- PLAN NO..C=.�G:Q�i Foundation Type LI SPREAD FOOTINGS U GRADE BEAMS AND PADS ❑ DRILLED FRICTION PIERS ❑ DRILLED PIERS INTO BEDROCK I DOTING W/MINIIvMUM OTHER EADLOAD CTLITIJOfAPSON PROJECT NOYCC**GO,lY.ij DATED - Foundation Void REQUIRED THICKNESS,.__--,_.,__�!,-_-_ice °.rL;e_.BYr'7rf2/Z-INCHES PAEASURED THICKNL:SS------ INCHES Foundation Wall Condition F1 EXPOSED STEEL n SURFACE PROBLEMS (HONEYCOMBING, ETC.) (IF CHECKED. Si IOW LOCATION ON SKETCH) Recommended Drain Type 'EXTERIOR ❑ INTERIOR l FIG. ..Z- INSTALLED PIPE DIAMETER 4i,-.___- INCHES WALL HEIGHT _- 6 - _ _ _ , INCHES DEPTH -TOP OF WALL TO BOTTOM OF TRENCH-i 2._i,- I jC�.INCHES XSLAB ON GRADE ❑ STRUCTURAL FLOOR 'PIPE IIJSTALLED � GRAVF:I. INSTALLED. GRAVEL SIZE Type of Outlet ❑ GRAVITY. BELOW SEWER XSUMP PI"I- ❑ UNDERDRAIN SERVICE CONNECTION VISIBLE (AT STUB) ,_Foundation Void: Zr-IN GENERAL CONFORMANCE WITH RECOMMENDATIONS __—__r_j REJECTED &"Foundation Wall Drain: �1 I GENERAL CONFORMANCE WITH RECOMMENDATIONS ❑ REJECTED M Foundation Waterproofing: MIN GENERAL CONFORMANCE WITH RECOMMENDATIONS ❑ REJECTED o ❑ Exterior Insulation `n MANUFACTURER HEIGHT FEET U -_- ¢ DISTANCE BELOW FOUNDATION WALL _-.— FEET 0 — I `?y iw, (sLslC/t^. a-Ek— 7Z RECOMMENDED CORRECTIVE PROCEDURE ___ --