Loading...
HomeMy WebLinkAbout3100 S College Ave - Special Inspections/Blower Door Test - 06/11/2015■ 1q9 June 11,2015 CONSULTING & ENGINEERING David Stolte Senior Project Manger Heath Construction 141 Racquette Drive - H Fort Collins, CO 80522 Project Name: Foothills Malls Redevelopment Block 13Aa Pie Project Number: C0115022.00 (000) Location: Fort Collins, Colorado Subject: Air Barrier Performance Testing Report Dear Mr. Stolte: In accordance with our agreement for professional services, Pie Consulting & Engineering (Pie) has conducted performance testing of the air barrier system for the Foothills Mall Redevelopment Block 13A in Fort Collins. The purpose of this performance evaluation was to provide Heath Construction a building air tightness performance value of the as -constructed air barrier. This report provides The City of Fort Collins Certification of Compliance, a summary of the air barrier test procedure, and results of our performance testing. The purpose of the performance testing was to quantify the amount of air leakage occurring through the air barrier test envelope. The testing was performed on June 5, 2015 by Scott Terry of Pie. Air Barrier Performance Testing Report Foothills Mall Block 13A - Fort Collins, CO CITY OF FORT COLLINS CERTIFICATE OF COMPLIANCE Building Air Leakage Test Results Pressurization Metric Requirement Actual Requirement Met/Not Met n 0.45 < n < 0.8 0.68 Met C N/A 128.1 N/A r2 r2 > 0.98 0.99 Met CFM75/sq ft Actual < 0.25 CFM 75/sq ft 0.070 Met 95% C.I. Upper I N/A 0.071 1 N/A 95% C.I. Lower N/A 0.070 N/A E LA75 N/A 1.7 N/A Depressurization Metric Requirement Actual Requirement Met/Not Met n 0.45 < n < 0.8 0.62 Met C N/A 155.2 N/A r2 r2> 0.98 0.99 Met CFM75/sq ft Actual < 0.25 CFM 75/sq ft 0.067 Met 95% C.I. Upper N/A 0.067 N/A 95% C.I. Lower N/A 0.066 N/A E LA75 I N/A 11.6 N/A Average Metric Requirement I Actual Requirement Met/Not Met CFM75/sq ft Actual < 0.25 CFM 75/sq ft 10.068 Met 1 The test boundary area was obtained from the Architect of Record and was checked on -site for reasonableness. AST Initial 2 Set up was performed according to section 2 of the test form and all deviations and their impact noted here. AST Initial 3 Test equipment used was in compliance with respect to accuracy and calibration date. AST Initial 4 The test procedure used was in compliance except as noted here. AST Initial 5 The calculations were done in strict accordance with ASTM E779-10 except as noted in this Protocol. AST Initial 6 Provide the value calculated in step 5.15 (or 5.11 or 5.4, if applicable). CFM75/sq ft 7 Determine pass/fail status based on the average of ressurization and depressurization. Pass 8 All accuracies, pressure limits, and data correlations and confidence intervals are within the bounds specified in steps 3, 4, and 5 and all deviations are noted here. I AST Initial Pie Consulting & Engineering Page 2 of 8 C0115022.00 (000)