HomeMy WebLinkAbout2326 Copper Mill Ln - Correspondence/Water and or Sewer - 06/04/2015FORT COLLINS- LOVELAND WATER DISTRICT SOUTH FORT COLLINS SANITATION DISTRICT
v
Date: �_ LZ— �S
TO: City of Fort Collins Building Inspections Department
FROM: Fort Collins -Loveland Water District
South Fort Collins Sanitation District
RE: Water and Sewer Approval I
II
This is to verify that Meritake Homes
has applied for a Water and Sewer Tap for
Kechter Cross li1Q (Subdivision)
2326 Copper Mill Lane (Building Address)
LI Bl (Lot Number)
The following Taps pertain to the above mentioned address:
X Water X Sewer
❑X Water Tap Fee has been paid, a Building Permit may be issued.
Sewer Tap Fee has been paid, a Building Permit may be issued.
All Tap Fees must be paid prior to issuing a Structure Building Permit.
Name of
(FCLWD / SFCSD)
Signed:
Please return to the City Of Fort C011inS Building Inspections Department for Building Permit.
Structure
Pressure Regulating Valve Required
5150 Snead Drive, Fort Collins, CO 80525 Phone (970) 226-3104 Fax (970) 226-0186