HomeMy WebLinkAbout4709 Prairie Vista Dr - Disclosures/Mechanical - 01/12/2015Updated 31712014
'ty of Fort Collins Residential Mechanical Systems Performance Report city of
Fort Collins
Corm is a record of testing targets and results, w th Pas w Constructon Mechanical Outcomes. For information on measurement tools ' usu
this fonnand mayng to be hniques, as ly updated; eheal Ne Building Services website forithe current ems tgversion." The guide and
This form must be completed and signed 6y an "Approved Agency;' and submitted to Building Services as a requirement for receiving a C.O.
ADCF = Air Density Correction Factor, based on tool,
Measured value Other altitude (5000'), air temperature through to01
Colo
key Target data ADCF
or limit to compare w th Pass Fail Caution Volumetric flow (CFM 5000') = ADCF x Indicated Flow (CFM)
key targetorlimit
�r
,i
HVAC contractor
As -built changes
meth design submi
Testing dale(s)F_`
BE
Date of "Residential
u /�rlltiAA
AL �rl✓e— Mechanical Systems
Design Submihal" Lj
�a i*m_Lt Q information referenced
/ — / by testing technicians
Testing tech (initials)
tube duct traverse
Air temp / l
ADCF
Flow �CFlow box
.— Pilot
COCo
through tool (F)
tool Passive flow hood
Other (note below)
Measured Airflow
um Airflow Requirement .
Indicated
Volumetric
Fail
(CFM 5000')
Flow
Flow
Pass
Exhaust Pickup Location
+ T
Type Of Operation
CFM
(CFM)
CFM 5060')
Le,- 4
termittent 20 Continuous
��
El
11
Q
J
ntermittent _20 Continuousto�L
Nj
❑
❑
El
�- 3antermittent
—20Continuous
ntermittent
20 Continuousntermittent
_
_20 Continuous
�ntermittent
_ 20 Continuous
50 Intermittent _20 Continuous.'
Testing
F�
notes
Kitchen exhaust
N/A - hood does not vent to outside11
Testing tech (initials)
Oven fuel
Minimum airflow requirement (CFM 5000') + operation jin0 Intermittent —
25 Continuous
Measured airflow
Flowrpassive
Tool
34rdedorgrille
Exhaust duct
Air temp
through
//
4Y
ADCF
1 '/
wbox _Pilot
flow hood
tube traverse
Flow grid
tool
—
location
—
termination nor OK)
tool (F)
Powered flow hood
Other (note below)
(Exterior
Indicated
//fll�ow i3e?'' CFM
Testing (.a o� 6JC�O✓&'^
notes
!/ r-^.
Volumetdc now 7 CFM 5000' E -2ass Fail
Residential Mechanical Design Submittal
V2D140307 Pagel
Systems other than sub -structural floor exhaust
Code -minimum ventilation airflow �y CFM 5000' Design ventilation
(based on CFA and # of BR) 7b airflow j CFM 5000'
Target ventilation airflow range ? tp CFM 5000'
(code -minimum) _ _(1Z0%of design Dow)
Testing tech (initials)
SystemF#fl
type
Measured
Airflow
Measurement Method
Tool Location
Air Temp
Through
ADCF
Indicated
Flow
Volumetric
Flow
Pass
Fail
Tool (F)
(CFM)
(CFM 5000')
Total
_ N/A _ Passive flow hoodf
�t
exhaust
airflow
w box _ Pilot tube traverse
Flow collar Other
w/
�/
E
— _ note below
CP P
Total
_ N/A _ Passive flow hood
supply
— Flow box _ Pilot tube traverse
airflow
Flow collar Other (note below)
When supply airflow is circulated by air handler fan, fan speed for measurement
Heating Cooling Continuous fan
Balanced airflow in balanced systems
Average of measured CFM Target flow range CFM --'"
supply + exhaust flows 5000' (average +/- 15%) tO 5000' ❑ Pass �'0, Fail
2S
Testing
notes
Substructural floor exhaust - no sub -structural floor exhaust system Testing tech (initials)��
Design exhaust airflow (based on Target airflow limits
approved design) CFM 5 —71 100' design +/- 15%)limits . to CFM 5000,
Measured airflow
Flow — Flow box — Pilot tube traverse Air temp
Passive flow hood Flow collar Tool
tool — location1=7 through ADCF=
_ Powered flow hood — Other (note below) tool (F)
Indicated flow CFM Volumetric flow
CFM 5000' El Pass Z--i
N/A No ductwodc Testing notes
o ductwork outside conditioned space (Inc] multiple Sys)
Dud leakage _ Energy rater (name,
data source company, testing date):
House conditioned floor area Air temp
(include full basement) sf through tool (F) ADCFI I
System #1 System 42
Leakage Type
Timing
Air Handler
(CFM25 5000' ! 100 sf)
(CFM25 5000')
(CFM25)
(CFM .. 5000')
Fall
assl
Fail
Total leakage
Rough -in
Excluded
$
_Pass
�..
.�,..�
Total leakage
Rough -in
Included
4
El
Total leakage
Complete
Included
4El
D.
❑
Residential Mechanical Design Submittal V20140307 Page 2
For multiple systems, attach one page per system
System #F;q Which parts of house does it serve?
07 rB�
Installed equipment (Be clear about which AC components are installed at time of testing) Testing tech (initials)
OLI
Furnace or Boller ` AC or Heat Pump Condenser 1� /SAC or Heat Pump Coil
xaGrt Ce..., �d-,.tc�a.�l �Mtrt Cn'C-.S �L+dv�rS� TL�I�
Model #I AVUHo10r31RA-9�
I
Filter /sic fiberglass _Electrostatic
brand (�p/iP6lG Type _Basic pleated _ Other. Thickness er MERV
_ High-effic pleated (inches) l (Optional)[]
aed: _ Heating Yeooling _ Cont. fan
High -stage for multi -stage equipment
war speed tap:
,
nidifier damper. , cLNJA
_ Open (Heating)
_ Closed (Cooling)
registers open
dampers open
SP1 !(d/
AP Filter
(SPt - SP2) I
Cooling: Measured air flow through indoor coil
Design Cooling alrtlow rg� CFM 5000'
(Ngh stage) 0
Measured airflow
Testing tech (initials)
SP40for NSme loc ovation
for
� TFSOP)
AP Coil
c T.rYi:
.:i
DP Total ESP
(SP3-SP2)
SP2 �ls
❑ N/A -- no AC installed Testing tech (initials)=
Target airflow limits y
(design +/- 15%) ! Y:FtO 1o1Z CFM 5000'
Flow grid14 Air tempP
plate size 20 throw ADCF �D�(� NSOP jb,3 TFSOP �,Z Flow Resistancetool Correction Factor
Measured airflow, no Indicated airflowG
CFM /� CFM Volumetric airflow q9 CFM ®-Bass
adjust meoUcorrecticn Measured AFx FRCF Inoicatetl aF xADCF /7 5000'
I �' Fail
Heating: Gas manifold pressure
Manifold pressureIWC1�
OEM spec @ 50005000� `
Heating: Temperature rise
(high stage)
Target manifold P
limits (Spec +/- 5%) J
OEM temperature rise limits F
(high stage)
Measured temps (F): Supply Return _
33 - Temp
air air/Q - rise r%i
6/
Testing tech (initials) -r
IWC MeasuredEIWC VPaL ss
pressure OjFall
Testing tech (initials)
Wass Caution: within 10F
L❑ Fail � tDp of range
Residential Mechanical Design Submittal V20140307 Page 3
i e' ®•
yi
Testing tech (initials)=
Testing approach and targets �-y�'''"
ElY-cr
NIA: No complete AC system � Ouse completed November - April (installing contractor responsible for testing in wane weather)
❑ TXV: Subcooling + SH check ❑ Non-TXV: Superheat ❑ OEM -specific: Approach
P pP ❑Other OEM -specific (documentation required)
Temperatures Condenser Non-TXV: Retum Target Target Target
P� P g g
(F): enieringair temp air wet -bulb tamp su erheat subcooling� approach
Subcooling
Discharge Condenser
Condenser❑ Liquid❑ Actual ❑ TXV Pass: Actual SC within +/-
pressure saturation T F line F subcocling F 3 F of target SC, 2 F min
(PSI) (500o Chad) temp (cond T-iig roe T) i
�[]TXV Fail
Superheat
suction Evaporator
Evaporator❑ Suction Actua! ❑ Nan-TXV Pass: Actual SH
pressure saturation T F line❑F superheat❑F within +/- 5 F of target SH
(PSI) (s000•chad) temp ("lineT-evapT) QNon-TXV Fail
TXV checks: ❑ Pass: Field -installed TXV installed in accordance with OEM instructions ❑. Caution: Actual SH outside mfgr range
Approach
Liquid ImpF7F Actual approach F El Approach Pass: Actual approach within +/- 1 F of target approach
temp (LigllneT-wndertserFltT)F 'gApproach Fail
-^,YRY 4 4 �J i
Register air flows
All registers are cut through finish materials and moving air Oftm- r❑ Fail
(Remainder of register air flow section under development, not yet being enforced)
Pressure balance
Testing tech (initials
Testing tech (initials
Room
(match names on plans, include
basement if there is a door)
Room -to -Core
Pressure Drop
Target Range (Pa)
Measured
Pressure
Drop (Pa)
Pass
Fail
J r �t S7EP CPO / oo rl—�
to +3
f �i
❑
%�rooss
-3 to +3
`z
❑
i
L l . /3 f Gl
-3 to +3
�
L[.!3V
3to+3
/
-3 to +3
❑
FI
-3to+3
❑
(]-
3 to +3
❑
❑
3 to +3
❑
❑
-3 to +3
❑
❑
-3 to +3
❑
❑
Residential Mechanical Design Submittal V20140307 Page 4
a-
�nbustion safety testing — no natural -draft combustion appliances Testing tech (initials)`t-
(Appliance Types table mustst be completed for every home)
Appliance types
Appliance
Combustion T e
NIA
Draft -hood
Natural -draft
Induced -draft
Natural -draft
Power-
vent
Direct-
vent
Powered sealed -
combustion
Electric
Furnace #1
❑
I ❑
❑
❑
❑
❑
Furnace #2
❑
❑
❑
❑
❑
❑
❑
Boller #1
❑
❑
❑
❑
❑
❑
❑
Boiler #2
❑
❑
❑
❑
❑
❑
❑
Water heater#1
❑
❑
❑
R—
❑
❑
❑
Water heater #2
❑
❑
❑
❑
❑
❑
❑
Fireplace #1
❑
❑
❑
❑
px,
❑
❑
Fireplace #2
❑
❑
❑
❑
❑
❑
❑
Other:
❑
❑
❑
❑
❑
❑
❑
Worst -case depressurization performance
House setup
These doors are
_ # of bath fans on
—Vented range hood on
Clothes dryer on
fans on:
Outdoor temperature = F
CAZ pressure
BPI depressurization limit IN wrt outside)
Measured net CAZ depressurization (Pa wrt outside)
OK (less negative) I Caution (more negative)
Spillage
BPI maximum limit (seconds
Measured spillage duration (seconds
Pass = duration not exceeding limit
Draft pressure
BPI limit (Pa wrt CAZ
Measured (Pa wrt CAZ
Pass = pressure more negative than limit
CO concentration in undiluted flue gas
BPI maximum limit (ppm
Measured CO (ppm
Pass = CO level not exceeding limit
Caution = CO level 25 to 100 ppm
❑ OK ❑ 1 Caution ❑ OK I ❑ I Caution I ❑ OK ❑ Caution
60
60
60
❑
IPass 1. ❑ lFail
1
❑ IFaii
I ❑
jPass I ❑ Fail
❑ Pass . ❑ Fail I ❑ IFail I ❑ Pass ❑ . Fail
100
100
100
❑
Pass ❑ - Fail
❑
Pass ❑. Fail
❑
Pass ❑. Fail
❑
Caution
❑
Caution
❑
Caution
Residential Mechanical Design Submittal V20140307 Page 5
s=a!@all,C.B��IfiJ'O�S ' 0'` � ' �: e ,� ry c s+r i-�+'�,'%�I .see ,�•,r.fi �a ;�T�y��
D l - � y, 0 f Fa r'� � er ,. Dr •� I e, F '" ry f F f
S� fi, _�r_x.vt: .x„ z.�v x-'w.� � � .;.^,:. N4�r,:�.;�.v��Y✓;3,.�?�«� �:...<�^�s�,wlrv`�,G �'#. ° r� i ,�. ;�
System
Controls Operating
Per Design Intent
Local exhaust (all fans)
❑
N/A
kUJ.Pass
❑
Fail
Whole -house ventilation
❑
NIA
ass
ElFail
Substructural floor exhaust
/A
❑
Pass
❑
Fail
Heating (ail systems)
❑
WA
Pass
❑
Fail
Cooling (all systems)
❑
N/A
Pass
❑
Fail
0
Technician #1 performing inspection and testing documented on this report (Approved Agency)
I certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the
.`City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
Name (print
Title
Compan)
Signature and Date
-petal
6t1VVLQ..
C S jervtces
Technician #2 performing inspection and testing documented on this report (Approved Agency)
I certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the
;City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
el
Na
Signature
HVAC Contractor (City of Fort Collins license holder)
I certify that I have reviewed this report and that the test results are an accurate representation of the performance of the installed mechanical
systems.
Na
Signature
Residential Mechanical Design Submittal V20140307 Page 6