Loading...
HomeMy WebLinkAbout2063 Cutting Horse Dr - Special Inspections/Engineering - 07/16/201401 1e[91c.Q Ae G o WA;VI, '. Geotechnical and Environmental Consultants D.R. Horton 9555 South Kingston Court, Suite 200 Englewood, CO 80112 Attention: Mr. Tim Karns Subject: 2063 Cutting Horse Drive Lot 2, Block Sidehill, Filing 2 Project Number 131361 Reference: A.G. Wassenaar Report Project Number 131361, Dated 9/30/2013 2180 South Ivanhoe Street, Suite 5 Denver, Colorado 80222-5710 303-759-8100 Fax 303-756-2920 I e www.agwassenaar.com July 16, 2014 As requested, the following portions of the foundation system were observed on the date(s) indicated below. It is our opinion that these portions of the foundation system were found to be in substantial conformance with the foundation plan and requirements of the soil report for the subject site. Observations were conducted on a periodic, on -call basis. Date: Observation: 05/28/14 Excavation Observation 06/18/14 Excavation and Footing Form Observation 06/19/14 Foundation Wall Reinforcing Steel Observation 07/01/14 Community Underdrain Extension Observation 07/14/14 Damp -Proofing Observation 07/14/14 Foundation Void Observation 07/14/14 Perimeter Drain Observation Sincerely, 2593 A�l . WASS AA IN Kenneth R. Broseghiyj i, P.E. Senior Engineer ll