HomeMy WebLinkAbout2063 Cutting Horse Dr - Special Inspections/Engineering - 07/16/201401 1e[91c.Q
Ae G o
WA;VI, '.
Geotechnical and Environmental Consultants
D.R. Horton
9555 South Kingston Court, Suite 200
Englewood, CO 80112
Attention: Mr. Tim Karns
Subject: 2063 Cutting Horse Drive
Lot 2, Block
Sidehill, Filing 2
Project Number 131361
Reference: A.G. Wassenaar Report
Project Number 131361, Dated 9/30/2013
2180 South Ivanhoe Street, Suite 5
Denver, Colorado 80222-5710
303-759-8100 Fax 303-756-2920
I e www.agwassenaar.com
July 16, 2014
As requested, the following portions of the foundation system were observed on the date(s)
indicated below. It is our opinion that these portions of the foundation system were found to be in
substantial conformance with the foundation plan and requirements of the soil report for the subject
site. Observations were conducted on a periodic, on -call basis.
Date:
Observation:
05/28/14
Excavation Observation
06/18/14
Excavation and Footing Form Observation
06/19/14
Foundation Wall Reinforcing Steel Observation
07/01/14
Community Underdrain Extension Observation
07/14/14
Damp -Proofing Observation
07/14/14
Foundation Void Observation
07/14/14
Perimeter Drain Observation
Sincerely,
2593
A�l . WASS AA IN
Kenneth R. Broseghiyj i, P.E.
Senior Engineer ll