HomeMy WebLinkAbout356 Pascal St - Correspondence/Plans Approval - 06/24/2014Gallegos Sanitation, Inc
Construction Waste Management Plan
June Uth,
FR Development U 2 0 =
Kevin Dewlen _
kevin@fr-cormcom
RE: Old Town North Residential Development
To Whom It May Concern:
This letter serves as an agreement between Gallegos Sanitation and FR Development for the
Construction Waste Management Plan (CWMP) of the Old Town North Residential
Development Project. The intention of the CWMP is to clarify the services that Gallegos
Sanitation offers construction clients. If your company plans to recycle project materials this
form must be completed prior to delivery of equipment.
Please review the following sections of this agreement. Please initial gty lnhlighted areas
stating you have read our policies. Please return this form to our office electronically or via fax
(970-484-0662).
Section 1: SEPARATION & CONTAMINATION
i ecycle Enclosure: Individual material stream dumpsters will be delivered to the central
construction site location as ordered by FR Development.
aSeparation: FR Development is responsible to direct sub -contractors to separate waste,
and put the correct material into the designated dumpsters. GSI will provide labels for dumpsters.
`: Contamination: If GSI driver sees contamination such as bottles, cans, plastic, ect- GSI
will not haul the load to be recycled, and/or will haul the load as trash. A contamination/trip
charge of up to $300 per haul in addition to the original haul fee will be assessed.
Monthly reports - Reports will state haul date, ticket number, weight of the material, and
the end -user of the materials will be provided. This is required at the end of your project by the
City of Fort Collins.
Please initial the b ey lion for each material you anticipate to have GSI haul from the project:
4eals- to be recycled at Aragons Iron and Metal- 516 US HWY No. 287, 80524
Accepted items: All metals mixed together -Steel, copper, aluminum, aluminum cans,
brass, aluminum; metal strapping, aerosol cans, clean rebar, nails
Not Accepted: No. Trash, plastic, paper
Gallegos Sanitation, Inc
/' Construction Waste Management Plan
(:oncrete To be recycled at City FC Streets-1380 Hoffman Mill Rd, 80524
Accepted Items: Clean Concrete, Grout, Ceramic Tile, Porcelain
NotAccepted: No METAL of any kind, NO strapping or rebar, No Plastics, NO TRASH
=Rx _ Cardboard— To be recycled at Larimer County Recycle Center- 5887 S. Taft Hill Rd,
80525
Accepted Items: Clean Cardboard Boxes only
Not Accepted: No wax board, paint contaminated or oil soaked cardboard; no food
stained products, no Styrofoam, no plastic bags or strapping.
% f%; Wood- To be recycled at Hagamens Earth Cycle- 3501 1 /2 E Prospect 80525
Accepted: Clean Wood/Lumbp ONLY — Nails OK; OSB OK Trim, Pallets OK
NotAccepted: No Paint or treated wood, No form board or other laminated wood
products, No labels/stickers, or No plastics shrink wrap, no packaging slips,
a _art: Trash- To be taken to Weld County Landfill- Hwy 14, Ault CO
Accepted. Gypsum, Painted/treated wood, plastic strapping, plastic shrink wrap, plastic
bags, PVC Piping and fencing, Styrofoam, dry paint cans
Not Accepted: Clean Cardboard, Clean Lumbar, Metal, Hazardous Waste, Tires
Section 4: ACCOUNT CONTACTS
Please list two people who will be the main contacts on this account
Name:
c., 1 Lev\
Phone:
Email:
k'ev,'2 � �, Corn.Co tm
Signature:
_T
Name:
Fe -le. 62hPrx2
Phone:
0 - Sid 83
Email'
Pe+e Ga r - eor �. co n1
Signature:
Gallegos Sanitation, Inc Representative:
Name:
Becca Walldnshaw
Phone:
970-980-6562
Ern
Signature:
0