HomeMy WebLinkAbout2625 Little Bear Ct - Applications/Reroof - 05/15/2015City of
6rt C®Wns
Planning, Development & Transportation
281 N. College Ave P.O. Box 580
Fort Collins, CO 80524
Phone 970-416-2740 Fax 224-6134
This application is to be used to apply for the following permits only (check all that apply). ❑ Air Conditioning
❑ Demolition (interior non-structural) ❑ Electrical Alteration (not service change) ❑ Gas Lighter ❑ Gas Log
❑ Heating Unit ❑ Lawn Sprinkler ❑ Mobile Home replacement ❑ Roofing ❑ Sewer Line ❑ Photo -voltaic
❑ Ventilation ❑ Water Heater ❑ Water Line ❑ Wood/Pellet Stove (must be EPA certified, provide make, model and
manufacturer).
Complete all applicable information on the application. Incomplete applications will not be accepted.
Application # '9150sguo Date
For office use only
Job Site Address (required)
Value of Construction (labor, materials, profit)
sl L-1,1 �
� lo`lsHs
Property Owner Name
Address
City/State Zip
Phone
Applicant Name
Address
City/State Zip
Phone
Contractor
Address
City/State Zip
Phone
/
rrebi ate- ."
C JCd
G _ice" a3
Contractor City of Ft. Collins Sales Tax #
Are you paying taxes here or by report?
❑ Here ❑ Report
Sales tax number is required by all contractors
Are you paying with your trust account?
❑ Yes ❑ No
Is this a residential or commercial project? 0 Residential ❑ Commercial
If residential, is it: [Single Family Detached ❑ Condo/townhome (single family attached) ❑ Duplex
❑ Multifamily (apartment) ❑ Garage
If commercial, is it: ❑ Bank ❑ Bar ❑ Church ❑ Hotel/Motel ❑ Medical office ❑ Office ❑ Retail
❑ Restaurant ❑ Other (explain)
Is this building 5o years of age or more? ❑ Yes ❑ No If yes, you mayneed to contact Historic Preservation
If this is for a demolition permit, what year was the building constructed?
Ifprior to 1975, you will need an asbestos assessment to submit with this application.
I hereby acknowledge that I have read this application and state that the above information is complete and correct. I agree to
comply with all requirements contained herein and city ordinances and state laws regulating building construction. I know that a
permit is not valid until it has been paid and issued.
Applicant:
Print Name: �%� Signature
Date �S