HomeMy WebLinkAbout3250 Green Lake Dr - Special Inspections/Engineering - 09/30/2014CTLITHOMPSON
September 30, 2014
Triton Communities
1490 Santa Fe Drive, Suite 100
Denver, Colorado 80223
Attention: Mr. Ceri Jones
Subject: Summary of Residential Construction Observations
35 Lots at Trail Head
Lot 3, Block 14, 3250 Green Lake Drive
Fort Collins, Colorado
CTL Project No.: FC06050.000-305
As requested, we provided residential construction observations for Lot 3, Block 14, 3250
Green Lake Drive, at the Trail Head Subdivision. We were scheduled forthe following observations
to date:
Observation
Date
Result/Remarks
Excavation/Footing
9/8/2014
Pass
Foundation Wall Steel
9/10/2014
Pass
Drain/Dampproof
9/17/2014
Pass
The information in our project files indicated there are no outstanding discrepancies for the
items listed above and that each was installed in general conformance with the project plans.
If we can be of further assistance, please contact us at your convenience.
Very truly yours, ,yam
CTL I THOMPSON, INC. Reviewed By: �1P•t'n
/ U. .I</V/, is
Heather Grubb yatt Knutson;�JPEi
38108
Field Department Manager Regional Manage'. OCT 1 J 2(}h
Attachments: Excavation/Footing Observation Report
Foundation Wall Reinforcement Observation Report
Foundation Wall Drain/Waterproofing Observation Report
Cc via email: ceri@tritoncommunities.com
351 Linden Street I Unit 140 1 Fort Collins, Colorado 80524
Telephone:970-206-9455 Fax:970-206-9441
Excavation/Footing
Observation
CLIENT. Triton Communities
1490 Santa Fe Drive, Suite 100
Denver, CO 80223
Attn;_Ceri Jones
Recommended Foundation System
CTLITHOMPSON PROJECT N6d'° ""L4
DATED /.3V 13
.
❑ SPREAD FOOTINGS
MAXIMUM SOIL PRESSURE OF PSF.
MINIMUM WIDTH
INCHES
FOOTINGS WITH MINIMUM DEADLOAD
MAXIMUM SOIL PRESSURE OF _ t_SGC) PSF.
MINIMUM DEADLOAD PRESSURE OF SG? PSF.
PROVIDE A tt INCH VOID BENEATH GRAr-� BEAMS
MINIMUM WIDTH. Fi ^p 20)2-0 INCHES
❑ GRADE BEAMS AND PADS
MAXIMUM SOIL PRESSURE OF PSF.
MINIMUM DEADLOAD PRESSURE OF PSF.
PROVIDE A INCH VOID BENEATH GRADE BEAMS
MINIMUM WIDTH
INCHES
Foundation Plan_
7L No,� rsd
By
PLAN NO CJ O-r'd • 62U DATE
WALL FOOTING WIDTH /6 (INCHES) DEPTH (INCHES)
COLUMN PAD y(INCHES) DEPTH (INCHES)
COLUMN PAD ___ (INCHES) DEPTH (INCHES)
REINFORCEMENTAS PER PLAN:
�j YES ❑ NO ❑ NONE REQUIRED
❑ AT SITE INSTALLED
Soil Conditions At Footing Level
UPPER LEVEL
LOWER LEVEL
Ground Water Conditions
�N NE IN EXCAVATION
NONE ENCOUNTERED IN BORING NO. L 3 i? I'- TO Zn FEET
❑ ENCOUNTERED AT FEET IN BORING NO.
Remarks:
OTLITHOMPSON
32514 6-rL2N n„
LOT 3 BLOCK �y
FILING NO. PROJECT NO.AC60 SC'D
Foundation Layout
I .il
I
I
il
—7 --
-- —1,
A INDICATES APPROXIMATE DEPTHNJIDTH MEASUREMENT LOCATION
Instructions to Contractor
FOOTING IN GENERAL CONFORMANCE WITH PLAN
FOOTING REJECTED
,f CONDITIONS IN EXCAVATION AS ANTICIPATED
❑ CONDITIONS IN EXCAVATION NOTAS ANTICIPATED, CONTACT
GEOTECHNICAL ENGINEER
RECOMMENDED CORRECTIVE PROCEDURE
THo-"^As Hu{• n.�rL4ic ��, �'C M� KN� �`z"�
FIELD REPRESSSO. O
a' 108
REVIEWS Y-��•'
•• SEP on 0 70}��
7/''//tI ' �a
DATE OF OBSERVATION /rinin� G
Foundation Wall
Reinforcement Observation
CLIENT Triton Communities
1490 Santa Fe Drive, Suite 100
Denver, CO 80223
Foundation Plan ` F
BY C 7L Rt-. B 5AN SIIV LN c •' �kuS
PLAN NO.. 6r. Cr¢b DATE
Foundation Plan
❑,--,, SPREAD FOOTINGS
�F00T'NGS WITH MINIMUM DEADLOAD
❑ GRADE BEAMS AND PADS
❑ DRILLED FRICTION PIERS
❑ DRILLED PIERS INTO BEDROCK
❑ OTHER
CTLrrHOMPSON,�/�
PROJECTNO. !1(:�C+�Z'� DATED ��•��•-7VJ3
WALL ALIGNMENT OFFSET L I INCHES
Foundation Void
[3'REQUIREDTHICKNESS INCHES
❑ NOT REQUIRED
Reinforcin/p Steel
GRADE AGO BAR SIZE
NO. OF BARS
TOP _1_. 'I�`•. S T �r T.6) '
BOTTOM Z 74 Ll �Gr 5 �J IRiK 60 tv '
VERTICAL 1'l-� '-I 6
HORIZONTAL 7' 11 `l L"
COUNTERFORT -fl- L( I)
Ins ructions to Contractor
0 IN GENERAL CONFORMANCE WITH PLAN
❑ REJECTED
RECOMMENDED CORRECTIVE PROCEDU E
! ' hu
L Cur it roe`
CTL1THOMPSON
ADDRESS
7!C\ I Gtl
eke
LOT BLOCK/
FILING NO. PROJECT NO. V '-Z;
Foundation Wall Layout
UFER Ground + Locatiogof UFER Ground
Q OCATION `t' IcL c. /�wiS- SCC -5ketck
❑ NOT INSTALLED
COMMENT:
i
I -
FIELDEVREPRES NTQTIVE
- '. '-•'
REVIEWE5 BY
'•• SEP 30 20141c--;
L
DATE OF OBSERVATION
c '
Foundation WaN Drain/
Voldfflaterproofing Observation
CLIENT: Triton Communities
1490 Santa Fe Drive, Suite 100
Denver, CO 80223
Attn: Cen Jones
ADDRESS:
T?WL_WE D
3zSa �2EE�1 LAKe P91ve J
LOT 3 BLOCK 14
FILING NO. -PROJECT NO.FCP to 0
Foundation Plan Foundation Wall Layout
BY PLAN NO, LC'CG>�I�(.,LL;"-i`t---
Foundation Type
SPREAD FOOTINGS
GRADE BEAMS AND PADS
❑ DRILLED FRICTION PIERS
DRILLED PIERS INTO BEDROCK
FOOTING W/MINIMUM
OTHER
DEADLOAD
CTLITHOMPSON PROJECT NO.F_0%0�-1 ZQ)ATED _1-' --13
Foundation Void
]I REQUIRED THICKNESS
INCHES
lMEASUMEDTHICKNESS
u�
4 INCHES
Foundation Wall Condition
I] EXPOSED STEEL
SURFACE PROBLEMS (HONEYCOMBING, ETC.)
(IF CHECKED, SHOW LOCATION ON SKETCH)
Recommended Drain Type
EXTERIOR INTERIOR
FIG.
INSTALLED PIPE DIAMETER 4 INCHES
WALL HEIGHT _1,O p INCHES
DEPTH -TOP OF WALL TO BOTTOM OF TRENCH l.Z�f --13)_ INCHES
SLAB ON GRADE n STRUCTURAL FLOOR
+ PIPE INSTALLED �2
' I GRAVEL INSTALLED, GRAVEL SIZE
Type of Outlet
GRAVITY, BELOW SEWER '+ SUMP PIT
❑ UNDERDRAIN SERVICE CONNECTION VISIBLE (AT STUB)
Foundation Void:
'KIN GENERAL CONFORMANCE WITH RECOMMENDATIONS
REJECTED
'Foundation Wall Drain:
PKIN GENERAL CONFORMANCE WITH RECOMMENDATIONS
REJECTED
Foundation Waterproofing:
KIN GENERAL CONFORMANCE WITH RECOMMENDATIONS
REJECTED
� _0 evtn 1 nla4'
0
v MANUFACTURER
m
HEIGHT FEET
m
°C DISTANCE BELOW FOUNDATION WALL FEET
aV- T
CaREElJ LANCE DRIVE
RECOMMENDED CORRECTIVE PROCEDURE
�Cilflc M.