Loading...
HomeMy WebLinkAbout4608 Chokecherry Trl - Special Inspections/Engineering - 10/02/2014w la la s 5 E15150MMOT135 57RU07URAL ENGINEERS October 2, 2014 Post Modern Development 44 North Mason Street, Unit 4 Fort Collins, CO 80524 Re: Footings & Foundation Wall Steel 4608 Chokecherry Trail Fort Collins, Colorado Project No. 214120 Gentlemen: On August 26 and September 4, 2014, a representative of Weeks & Associates observed footings and foundation wall steel at the referenced site. Observations indicate the footing sizes and foundation steel reinforcement are in substantial accordance with the engineered foundation plan for the project by Weeks & Associates. in addition—, the electro e had been p aced in accordance with the recommendations by NEC. If we can be of further assistance please contact us. Sincerely, Weeks & Associates, Inc. John McBride, P.E. Staff Engineer z 2 0123 •R,� /j .. (?. G.,2�6i tura wEgJt,i5 4730 South College Ave, Suite 201, Fort Collins, CO 80525 Phone (970) 225.2422 - Fax (970) 225.2622