HomeMy WebLinkAbout1006 Timber Ln - Applications/Reroof - 12/01/2014Fort Collins
Planning, Development & Transportation
281 N. College Ave P.O. Box 580
Fort Collins, CO 80524
Phone 970-416-2740 Fax 224-6134 13 2 , 12
OVER-THE-COUNTER PERMITS ONLY
This application is to be used to apply for the following permits only (check all that apply). ❑ Air Conditioning
❑ Demolition (interior non-structural) ❑ Electrical Alteration (not service change) ❑ Gas Lighter ❑ Gas Log
❑ Heating Unit ❑ Lawn Sprinkler ❑ Mobile Home replacement Of Roofing ❑ Sewer Line ❑ Photo -voltaic
❑ Ventilation ❑ Water Heater ❑ Water Line ❑ Wood/Pellet Stove (must be EPA certified, provide make, model and
manufacturer).
Complete all applicable information on the application. Incomplete applications will not be accepted.
Application # ?1612232.- Date 1)ee% y ber 1 . a0144
For office use only
Job Site Address (required)
Value of Construction (labor, materials, profit)
0 \w\loor Lety►
oZSU-0
Property Owner Name Address
City/State -Zip
Phone
1 I o , rL
AtUlivils eo 80sal
a I U9 -(0l8
Applicant Name Address
City/State Zip
Phone
Contractor Address
City/State Zip
Phone
nb
Contractor City of Ft. Collins Sales Tax #
Are you paying taxes here or by report?
❑ Here ❑ Report
Sales tax number is required by all contractors.
Are you paying with your trust account?
❑ Yes ❑ No
Is this a residential or commercial project? 0 Residential ❑ Commercial
If residential, is it: IT Single Family Detached ❑ Condo/townhome (single family attached) ❑ Duplex
❑ Multifamily (apartment) ❑ Garage
If commercial, is it: ❑ Bank ❑ Bar ❑ Church ❑ Hotel/Motel ❑ Medical office ❑ Office ❑ Retail
❑ Restaurant ❑ Other (explain)
Is this building 50 years of age or more? ❑ Yes X No If yes, you may need to contact Historic Preservation
If this is for a demolition permit, what year was the building constructed?
Ifpnor to 1975, you will need an asbestos assessment to submit with this application.
Description of work 11 QA^3 t' o o �'� 2S 9�5 �%�� f J'C*k i gic c5ki
l S}bru
*If lawn sprinkler/backflow preventer, must list licensed plumber. If first-time A/C, must list licensed electrician.
Subcontractors: List the company name or City of Ft Collins license#
Electrician Plumber.
Mechanical Roofer
Other
I hereby acknowledge that I have read this application and state that the above information is complete and correct. I agree to
comply with all requirements contained herein and city ordinances and state laws regulating building construction. I know that a
permit is not valid until it has been paid and issued.
Applicant:� l9 �1 Date 1�0 I I14
Print Name: Cc�v� �.v�aa � �Q! Signature