HomeMy WebLinkAbout2021 Yearling Dr - Special Inspections/Engineering - 03/07/2014f
Geotechnical and Environmental Consultants
D.R. Horton
9555 South Kingston Court, Suite 200
Englewood, CO 80112
Attention: Mr. Tim Karns
Subject: 2021 Yearling Drive
Lot 38, Block 12
Sidehill, Filing 2
Project Number- 131357
Reference: A.G. Wassenaar Report
Project Number 131357, Dated 6/28/2013
2180 South Ivanhoe Street, Suite 5
Denver, Colorado e0222-5710
303-759-8100 rax303-756.2920
C
March 07, 2014
m9w.agwassenaar.rorn
As requested, the following portions of the foundation system were observed on the date(s)
indicated below. It is our opinion that these portions of the foundation systern were found to be in
substantial conformance with the foundation plan and requirernents of the soil report for the subject
site. Observations were conducted on a periodic, on -call basis.
Date:
Observation:
02/18/14
Excavation Observation
02/21/14
Excavation and Footing Form Observation
02/25/14
Foundation Wall Reinforcing Steel Observation
03/03/14
Damp -Proofing Observation
03/03/14
Foundation Void Observation
03/03/14
Perimeter Drain Observation
03/04/14
Community Underdrain Extension Observation
03/04/14
Perimeter Drain Observation
Sincerely,
A."WASSR
-..-
Kenneth R.Brosegh
Senior Engineer
A.G.
Geotechnical and Environmental Consultants
DR Horton
9555 South Kingston Court, Suite 200
Englewood, Colorado 80112-5943
Attention: Mr. Brian M. Wright
Subject: Fill Observations
2021 Yearling Drive
Lot 38, Block 12
Sidehill, Filing 2
Fort Collins, Colorado
Project Number 131357
2180 South Ivanhoe Street. Suite 5
Denver, Colorado 80222-5710
303-759-8100 Fax 303-756-2920
a -Co www.agwassenaar.com
May 12, 2014
As requested, density tests were taken on a periodic basis on the fill being placed at the
site of the subject project. Submitted are Daily Report Number(s) 1 and 2 covering
observations of the fill through the period ending February 20, 2014.
The density test results met the specifications provided by our office.
These tests should be considered as periodic observations. The placement of the fill was
not continually observed by our firm. The test depths and locations are approximate and
are based upon information provided by the Contractor. The lateral and vertical extents
of any subexcavation were not measured or verified by this firm. The Contractor has
been informed of the field density test results.
Sincerely,
A. G. WASSENW--• N`II
25793 -
Timothy pe-jv •r, P.E.
Proje nginee'r�' ..• '
TJS/kim 9S�..................
..ti_.`� \ .
Attachments
Statement of Services
A.G. Wassenaar 2,8 p adot80222 5710
303-759-8100 Fax 303-756-2920
Geotechnical and Environmental Consultants www.agwassenaar.com
Fill Observation at: Page 1 of 1
DR Horton 2021 Yearling Drive Project No. 131357
9555 South Kingston Court, Suite 200 Lot 38, Block 12 Date: 2-19-14
Englewood, Colorado 80112-5943 Sidehill, Filing 2 Daily Report No. 1
Fort Collins, Colorado
Laboratory
Specifications
Field
Deviation
From
Range
Depth
Optimum
Optimum
of
a
or
Max Dry
Moisture
Moisture
Com-
Dry
Moisture
Com-
Test
Elev.
Density
Content
Content
paction
Density
Content
paction
m
No.
Location
(ft.)
I (pcf)
i%)
N
(%)
(pcf)
N
(%)
Soil Type
a
No Tests Taken
BFG = Below Final Grade
TSG = Top of Subgrade
BSG = Below Subgrade FL = Footing Level TBC = Top of Base Course P = Pass
FOL = Front of Lot COL = Center of Lot BOL = Back of Lot F = Fall
PROGRESS REPORT: As requested by the Contractor, we visited the site several time(s) today. The following
information summarizes our observations at the time of our site visit(s). The Contractor, Blanding, began backfill of
the excavated area. The Contractor placed crushed gravel in one foot lifts to approximately one to two feet above the
water table. A front end loader wheel rolled each lift in. No fill was placed in the excavation today.
The Contractor was informed of our observations, and recommendations. Observation services were conducted on an
on -call basis.
Engineering Technician: John Murp�
Reviewed By:
IN
No Text