HomeMy WebLinkAbout4700 Lady Moon Dr - Correspondence/Building Code - 03/09/2015(a) CONSTRUCTION March 9, 2015 Mr. Mike Gebo Chief Building Official City of Fort Collins RE: Banner Fort Collins Medical Center City of Fort Collins Permit #B 1304738 Final Commissioning Report Variance Dear Mr. Gebo: JE DUNN CONSTRUCTION COLORADO CENTER - TOWER ONE 2000 5 COLORADO BLVD, SUITE 12000 DENVER, CO 80222 TEL 303.753.8988 1 FAX 303.753.8964 ww .jedunnxom 11%9,I ;�?i, We are submitting this letter to request a temporary variance for the Final Commissioning Report required to fulfill the City of Fort Collins Certificate of Occupancy requirements for the Banner Fort Collins Medical Center project. The intention of this variance is to permit the Certificate of Occupancy to be issued and allow an extension to complete the remaining items associated with the Final Commissioning Report. All required documentation will be provided to the City of Fort Collins by the end of March. The driving factor for obtaining the Certificate of Occupancy is directly related to receiving a Certificate of Compliance from the Colorado Department of Public Safety (CDPS), State of CO AHJ directly responsible for allowing healthcare facilities to see patients. CDPS is requiring the facility to have a full Certificate of Occupancy prior to Final inspection which is scheduled for Wednesday March I I'. The Pre -Functional Verifications are complete, Test and Balance will be complete by the end of this week and onsite Functional Testing between the commissioning agent and building owner is in progress nearing 80% complete. Timeline for completion of outstanding items is as follows: • March 13' - Complete MEP & associated controls functional and field commissioning. • March 31" -Submit the Final Commissioning Report, produced by E Cube, Inc. • Fine tuning and optimization of the systems will occur over the next 3-5 weeks. Due to the time of year, final commissioning of the cooling systems will be deferred until spring. It is the full intention of both JE Dunn Construction and E Cube, Inc. to provide Banner Health a fully functional, commissioned facility and provide the City of Fort Collins the documentation as a record of completion. We appreciate your time and consideration on the matter. If you have any questions do not hesitate to contact me at 970-34-3040 or adam.ritcheygiedunn.com. Regards, JE DUNN CONSTRUCTION COMPANY � L7 Adam Ritchey Project Manager cc: Russell Hovland/Mark Ostrand/Trey King/Matt Bilstein In pursuit of building perfection% -/-p Iffe A-'�;re-t-> i 0/7 i 4