Loading...
HomeMy WebLinkAbout5225 Abbey Rd - Applications/Reroof - 03/10/2015Fort Collins Planning, Development & Transportation 281 N. College Ave P.O. Box 580 Fort Collins, CO 80524 Phone 970-416-2740 Fax 224-6134 OVER-THE-COUNTER PERMITS .ONLY This application is to be used to apply for the following permits only (check all that apply). ❑ Air Conditioning ❑ Demolition (interior non-structural) ❑ Electrical Alteration (not service change) ❑ Gas Lighter ❑ Gas Log ❑ Heating Unit ❑ Lawn Sprinkler ❑ Mobile Home replacement ❑ Roofing ❑ Sewer Line ❑ Photo -voltaic ❑ Ventilation ❑ Water Heater ❑ Water Line ❑ Wood/Pellet Stove (must be EPA certified, provide make, model and manufacturer). Complete all applicable information on the application. Incomplete applications will not be accepted. Application # ?v��y �- l Date For office use only Job Site Address (required)) Value of Construction (labor, materials, profit) U di I U r72T G✓! 6 Property Owner Name Address City/State Zip Phone i amw Lev _ Applicant Name Address . City/State Zip Phone Contractor Address City/State Zip Phone �j (1C(� u✓ a� G� lb� (.�r✓ rxr ��fa Contractor City of Ft. Collins Sales Tax # Are you paying taxes here or by report? ❑ Here ❑ Report sales tax number is required by all contractors Are you paying with your trust account? ❑ Yes ❑ No Is this a residential or commercial project? bONResiclentlal ❑ Commercial If residential, is it: (Single Family Detached ❑ Condo/townhome (single family attached) ❑ Duplex ❑ Multifamily (apartment) ❑ Garage If commercial, is it: ❑ Bank ❑ Bar ❑ Church ❑ Hotel/Motel ❑ Medical office ❑ Office ❑ Retail ❑ Restaurant ❑ Other (explain) Is this building 50 years of age or more? ❑ Yes IpNo If yes, you may need to contact Historic Preservation If this is for a demolition permit, what year was the building constructed? If prior to 1975, you will need an asbestos assessment to submit with this application. Description of work 0,4IP gpez, 6-Tin— Pif�Llrnacyy - *If lawn sprinkler/backflow preventer, must list licensed plumber. If first-time A/C, must list licensed electrician. Subcontractors: List the company name or City of Ft Collins license # Electrician Plumber Mechanical Roofer Other I hereby acknowledge that I have read this application and state that the above information is complete and correct. I agree to comply with all requirements contained herein and city ordinances and state laws regulating building construction. I know that a -it- is not valid until it has been paid and issued P Applicant: 1,it1-nS z, g Print Name: )• Signature nature Date