HomeMy WebLinkAbout1107 Steamboat St - Disclosures/Mechanical - 10/03/201481301 A(de
City of Fort Collins Residential Mechanical Systems Performance Report
This form is a record of testing targets and results, with Pass/Fail outcomes. For Information on measurement tools and testing techniques, see the
'Residential New Construction Mechanical Systems Testing Guide.' The guide and this form may be periodically updated; check the Building
Services web site for the current version.
This form must be completed and signed by an 'Approved Agency; and submitted to Building Services as a requirement for receiving a C.O.
Color
key
Target
Measured value
Other
to compare with
Pass
Fail
Caution
or limit
target or limit
data
ADCF = Air Density Correction Factor, based on tool,
ADCF altitude (5000'), air temperature through tool
Volumetric flow (CFM 5000') = ADCF x Indicated Flow (CFM)
House1. .
ta
Address 1107 Steamboat St, Fort Collins, CO 80524 Date of "Residential
Mechanical Systems
Builder Aspen Heights Construction Design Submittal"
P 9 information referenced
HVAC contractor by testing technicians
As -built changes
mech design submi
Testing date(s) 1
2 Local Exhaust (Spot Ventilation)
Bath exhaust
Testing tech (initials) TS
Flow ✓ Flow box Pilot tube duct traverse Air temp 68
ADCF 1.098
tool _ Passive flow hood Other (note below) through tool (F)
Measured Airflow
Design
Airflow(CFM
Minimum Airflow Requirement
Indicated
Volumetric
Exhaust Pickup Location
(CFM 5000')
Flow
Flow
Pass
Fall
5000')
+ Type of Operation
(CFM)
(CFM 5000')
Bath, 2nd, N
50 Intermittent 20 Continuous
48
53
❑✓
Bath, 2nd, SW
❑✓ 50 Intermittent —20 Continuous
48
53
❑✓
❑
Bath, 2nd, E
✓❑ 50 Intermittent _ 20 Continuous
55
60
0
❑
Bath, 1st, SE
✓❑ 50 Intermittent —20 Continuous
Low
❑
❑✓
✓❑ 50 Intermittent —20 Continuous
❑
❑
❑ 50 Intermittent _ 20 Continuous
❑
❑
❑ 50 Intermittent _ 20 Continuous
❑
❑
Testing
notes
Kitchen exhaust NIA - hood does not vent to outside z Testing tech (initials) BS
Oven fuel Gas ,/ 1 Electric Minimum airflow requirement (CFM 5000') + operation 1 100 Intermittent —25 Continuous
Measured airflow
Flow box _ Pi
lot tube traverse
Interior grille Air temp
Flo _passive Dow hood _Flowow grid Tool —Exhaust duct Through ADCF
lool —Powered Flow hood _ Other (note below) location (Exterior termination not Op tool (F)
Indicated flowCFM Volumetric flow CFM 5000' ❑E]Pass I�'Fall
Testing
notes
Residential Mechanical Design Submittal V20140101 Page i
3. Whole -Dwelling -Unit Ventilation
Systems other than sub -structural floor exhaust Testing tech (initials) BS
Code-minimum(basedon ventilation of BR)flow Design ventilation
CFM 5000' airflow®CFM 5000' ❑ suppiExhaust-only
(based on CFA and # of BR) System ❑J Supply -only
typo Balanced
Target ventilation airflow range 7 S to I SD CFM 5000' ❑
(code -minimum) (120%ofdeslgn fl.)
Measured Airflow
Measurement Method
Tool Location
Air Temp
Through
Tool (F)
ADCF
Indicated
Flow
(CFM)
Volumetric
Flow
(CFM 601
Pass
Fall
N/A Passive flow hood low box aitot tube traverse❑Flow collar Other (note below)
F
N/A Passive flow hood
low box ✓aitottubetraverse
Flow collar Other (note below)
Fresh Air duct
46
1.077
9�
97
When supply airflow is circulated by air handler fan, fan speed for measurement
Heating
j/
Cooling Continuous fan
Balanced airflow in balanced systems _
Average of measured CFM Target flow range CFM ❑ ❑ Pass Fail
supply+ exhaust flows to 5000' (average 5000'
i eating
notes Code minimum and design ventilation talcs to be provided by HVAC contractor
Substructural floor exhaust t❑'N/A — no sub -structural floor exhaust system Testing tech (initials)
Design exhaust airflow (based on
CFM 500D' Target airflow limits
to
CFM 5000'
approved design)
(design +/-15 %)
Measured airflow
Flow
tool
Flow box _
—Passive flow hood _Flow
Pilot tube traverse
collar
Air lem P
Tool through ADCF
location
_Powered Flow hood _
Other (note below)
tool (F)
Indicated 0ow
CFM
Volumetric flow
CFM 5000' El Pass
El
-❑', Fail
i�
4. Heating + Cooling Duct Leakage
N/A — No ductwork Testing notes
No ductwork outside conditioned space (met muiupla Sys)
Duct leakage Energy rater (name,
data source — company, testing date):
House conditioned floor area
(include full basement) /7Y�
Test Parameter and Conditions
at Air temp 74 ADCF �• /
through tool (F)
Maximum Allowed Duct Leakage
Normalized Absolute
(CFM25 5000' / 10D sf) (CFM25 5000')
Measured Duct Leakage
Indicated Volumetric
(CFM25) (CFM25 5000')
System #1
System #2
Leakage Type
Timing
Air Handler
Pass
Fail
I Passl
Fail
Total leakage
Rough -in
Excluded
4
❑
❑
❑
❑
Total leakage
Rough -in
Included
6
16 7
`
83• 4
0'
❑
❑
❑
Total leakage
Complete
Included
12
❑
❑
❑
❑
ea age
to outdoors
Complete
Included
8
❑
El
El
El
Residential Mechanical Design Submittal V20140101 Page 2
�5. Heating +Cooling Equipment
For multiple systems, attach one page per system
System #F-1 Which parts of house does it serve? Whole House
Installed equipment (Be clear about which AC components are installed at time of testing) Testing tech (initials) FBS
Furnace or Boiler
AC or Heat Pump Condenser
AC or Heat Pump Coil
Manufacturer
kt'e-�
Fx r&
ktL�
Model#
2qZ PA G60 IA
bl
Re -EL - 14M 76l C
Filter ✓ Basic fiberglass _ Electrostatic ThicknessH
MERV
brand Type _ Basic pleated - Other: (inches) (optional)
_ Higheffic pleatedF1
Static pressures
Setup
Speed:_ Heating Q✓ Cooling _Cont.fan
_ High -stage for multi -stage equipment
Blower speed tap: High speed
Humidifier clari N/A
Open (Heating)
_Closed (Cooling)
aAll registers open
—Zone dampers open
SP1 65 PEI
AP Eger 38 Pa
(SPt. sP2)
Cooling: Measured air flow through indoor coil
Design cooling swCFM 5000'
(highh stage) 1-j
SP2 EEEa
❑ N/A - no AC installed
Testing tech (initials) FBS
(Same location
( 29 Pa for NSOP,
TFSOP)
P Coil 39 Pa
Coil
SP3 68 Pa
AP Total ESP 171 Pa
(SP3SP2)
.6841WC
Testing tech (initials)SS
Target airflow limits D 10 to J--D CFM 5000'
(design +/-15%)
Measured airflow,
mp
Flow grid 14 Atooir l(F)❑
5lZ0 20 Ihrou h 67
ADCF
1.098
NSOP —9
❑
❑ Flow Resistance
TFSOP Correction Factorl-7.
plate s/
Measured airflow, no
adjustment/correction
CFM
Indicated airflow,
Measured AF FRCF 1003 CFM
Volumetric airflow CFM 12Pass
Indicated AF AnCF 1101 5000' Fall
x
x
Testing notes
Design air flow unknown at time of testing, pass fail determined by others
Heating: Gas manifold pressure
(high stage)
Testing tech (initials)
Manifold pressure s IWC
OEM spec @ 5000' limits
Target manifold P 3 3� to 4
(spec
IWC Measured
pressure
Y�
IWC 'Pass
❑:Fall
Heating: Temperature rise
Testing tech (initials)®
OEM temperature rise limits
(highs
In F
S
Supply _ Retum� _ Temp � ❑ ,Caution: within 10F
Measured temps (F): air Gair LY - rise ��'� Pass Fail ❑lof top of range
Residential Mechanical Design Submittal V20140101 Page 3
r
Testing tech (initials)
Testing approach and targets
El NIA: No complete AC system ❑N/A: House completed November - April(instzlling mntracter responsible for testing in warm weamer)
& TXV: Subcooling + SH check ❑ Non-TXV: Superheat ❑ OEM -specific: Approach ❑ Other OEM -specific (dmumentaron regmred)
Temperatures Condenser pQ Non-TXV: Return Target A/ Target Target ^/
(F): entering air temp p _I air wet -bulb temp superheat �A subcooling� approach
Subcooling
Dischar a
pressure (
Condenser
saturation T `` F
Liquid
line
DJ
Actual
F sub000ling S F
❑ TXV Pass: Actual SC within +/-
3 F of target SC, 2 F min
(PSI)❑
(5000'chanl❑
temp
(Contl T-liq line T)
LO Fail
Superheat
Suction
pressure
'2,y
Evaporator u
saturation T � F
Suction Actual I
line G / F superheat ! $ F
❑ Non-TXV Pass: Actual SH
within +1- 5 F of target SH
(PSI)
I
(scoocnad)
temp (Suctline T-evap T)
(Q Non-TXV Fail
TXV checks: R`Pass:
Field -installed TXV installed in accordance vdth OEM instructions -Caution:
Actual SH outside mfgr range
Approach
Liquid line❑F
Actual ❑ Approach Pass: Actual approach
Actual
within +/-1 F of target approach
temp
appr FAT) ❑Approach Fail
(UglineT enser EAT)
Register air flows
All registers are cut through finish materials and moving air Fv,_(1 Pass El Fail
(Remainder of register air flow section under development, not yet being enforced)
Pressure balance
Testing tech (initials) BS
Testing tech (initals) TS
Room
(match names on plans, include
basement if there is a door)
Room -to -Core
Pressure Drop
Target Range (Pa)
Measured
Pressure
Drop (Pa)
Pass
Fall
Bed, 2nd, N
-3to+3
2.5
❑✓
❑
Bed, 2nd, SW
-3to+3
2.0
❑✓
❑
Bed, 2nd, E
-3to+3
2.6
0
❑
Bed, 1st, SE
3to+3
2.8
1211
❑
3 to +3
❑
❑
3 to +3
❑
❑
3 to +3
❑
❑
3to+3
Fj❑
3to+3
❑❑
-3 to +3
100-
Residential Mechanical Design Submittal V20140101 Page 4
oCombustion Safety
Combustion safety testing N/A — no natural -draft combustion appliances Testing tech (initials)
❑ (Appliance Types table must be completed for every home) ,N V
Appliance types
Appliance
Combustion Type
N/A
Draft -hood
Natural -draft
Induced -draft
Natural -draft
Power-
vent
Direct-
vent
Powered sealed -
combustion
Electric
Furnace #1
❑
❑
❑
❑
❑
❑
Furnace #2
Q
❑
❑
❑
❑
❑
❑
Boiler #1
R
❑
❑
❑
❑
❑
❑
Boiler #2
H
❑
❑
❑
❑
❑
❑
Water healer #1
❑
❑
❑
❑
❑
❑
Water heater#2
❑
❑
❑
❑
❑
❑
Fireplace#1
❑
❑
❑
❑
❑
❑
Fireplace #2
0
❑
❑
❑
❑
❑
❑
Other:
Fir❑
❑
❑
❑
❑
❑
Worst -case depressurization performance
_ # of bath fans on
—Vented range hood on
_ Clothes dryer on
_Air handler on
Other fans on:
Outdoor temperature = F
CAZ pressure
are
notes:
BPI depressurization limit (Pa wrt outside)
wrt net CAZ depressurization (Pa woutside)
OK (less negative) I Caution (more negative)
Spillage
BPI maximum limit (seconds)
Measured spillage duration
(seconds)
Pass = duration not exceeding limit
Draft pressure
BPI limit
(Pa wn CAZ)
Measured
(Pa wrt CAZ)
Pass = pressure more negative than limit
CO concentration In undiluted flue gas
BPI maximum limit
(ppm)
Measured CO
(ppm)
Pass = CO level not exceeding limit
Caution = CO level 25 to 100 ppm
❑ OK ❑ Caution ❑ OK I ❑ I Caution ❑ OK ❑ Caution
60
60
60
❑
Pass
I
❑
Fail
I ❑
Pass I
❑
Fail
I ❑
jPass
I
❑
IFail
❑ Pass ❑ Fail ❑ 1pass I ❑ IFail ❑ Pass I ❑ Fail
I 100 I 100 I 100 I
LJ Pass LI Fail LI Pass LJ Fail LJ Pass LJ Fail
❑ Caution ❑ Caution ❑ Caution
Residential Mechanical Design Submittal V20140101 Page 5
r
. System Controls
Testing tech (Initials) BS
System
Controls Operating
Per Design Intent
Local exhaust (all fans)
NIA
I I t/ I
I Pass
Fail
Whole -house ventilation
NIC,/Pass
Fail
Sub -structural Floor exhaust
z
N/
Fail
Heating (all systems)
N/
Fail
Cooling (all systems)
N/
Fail
signatures,
Technician 91 performing inspection and testing documented on this report (Approved Agency)
Testing Notes
'I certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the
City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
Name
Signature
Technician #2 performing inspection and testing documented on this report (Approved Agency)
I certify that the tests referenced above, in sections bearing my initials, were performed in accordance with protocols specified by the
City of Fort Collins Building Services Department, and that the reported results are accurate to the best of my knowledge.
ion
Signature
HVAC Contractor (City of Fort Collins license holder)
I certify that I have reviewed this report and that the test results are an accurate representation of the performance of the Installed mechanical
systems.
Name (print)
Title
H.Y ✓
Company LN r _ e—j - /
C..— GL ZC^rr�
Signature and Dale /Z
L
Residential Mechanical Design Submittal V20140101 Page 6